Villages C P2-CS 880114PIERCE LUNSFORD ASSOCIATES, INC ......... CONSULTING ENGINEEI:::IS January 14, 1988 Mr. Rick Ivey American Developers & Contractors 2521 East Main Grand Prairie, Texas 75050 Subject: Preliminary Construction Punchlist Water, Sanitary Sewer & Storm Drainage Improvements Coppell M.U.D. No. 1 Coppell, Texas Dear Rick: The Villages of Coppell, Phase II project was discussed at the January meeting of the Coppell M.U.D. No. 1 Board of Directors. At this meeting, the Board directed Pierce-Lunsford to have all items remaining on this contract completed as soon as possible. A preliminary inspection by Coppell M.U.D. No. 1 and City of~ Coppell representatives has identified several items which need to be completed by American Developers and Contractors before a final inspection of the project can be scheduled. These items include the following.- 1. Clean and flush Storm Sewer Line "A" of all sand, gravel and other debris. Check all other storm sewer lines and curb inlets and clean them of debris, if necessary. 2. Plumb the fire hydrant in front of Lot 31 on Andover Lane. 3. Lower the fire hydrant on the south side of Aberdeen Court in accordance with standard construction details for the City of Coppell. 4. Install blue stimsonite fire-lite reflectors in the center of streets adjacent to each fire hydrant. 5. Paint all water valve caps in accordance with the City of Coppell paint specifications. 6. Clean debris from all sanitary sewer manhole inverts. Adjust rings and casting at top of all manholes, if necessary, and Grout inside of riser. With the exception of Item No. 4, unit prices for all items listed above were included in your bid proposal to complete this project dated October 5, 1987, or were assumed to be incidental to the bid. Please submit a unit price to place blue fire-lite reflectors for the seven hydrants constructed as part of this contract. The Developer for this project, The Brooks Companies, 3109 CARLISLE, SUITE 206 3901 W. PIONEER PARKWAY, SUITE 100 DALLAS, TEXAS 75204 ARLINGTON, TEXAS 76013 (214) 871-2126 (817) 461-5868 Metro January 14, 1988 Mr. Rick Ivey Page 2 is in the process of replatting the subdivision for larger lots, which may Change the proposed location for water and sanitary sewer services. Therefore, the placement of meter yokes and meter boxes for 3/4" water services will be deleted from this contract, and completed by The Brooks Companies after acceptance of the replat. Please send me a schedule indicating when you can move a crew on site to complete this project. We will recommend final payment and release of retainage as soon as all work included in this contract is complete and acceptable t.o all concerned parties. Sincerely, PIERCE-LUNSFORD ASSOCIATES, INC. Jeffrey M. Hawkins, JMH/sh cc: Mr. Paul Phy - Legal Council for Cop~ll M.U.D. No. Mr. Lanny Land - Lloyd's U.S. Mr. Brad Williams