Loading...
Villages C P2-CS 880203 COPPELL PUBLIC WORKS February 3, 1988 TO: Steve Goram, Director of Public Works FROM: Steve Morton, Chief Development Inspector RE: Villages II Recommendations and Requirements STAFF RECOMMENDATIONS: Water Where possible, deleted services are to be removed from corporation at main. Services which cross under pavement are to be removed starting 1'-0" under curb both ends and removed from main. Services which do not cross under pavement will be removed extirely from corporation at main. In areas where main is under pavement and corporation can not be accessed, service will be removed 1'-0" under curb and plugged. No crimping will be allowed. Entire system will be re-hyprostatic tested. Sanitary Sewer Where possible, all sewer services are to be removed at "T" on main, and "T" permanently capped. Services which cross under pavement are to be removed starting 1'-0" under curb both ends and removed from main at "T" connection and "T" capped. The abandoned pipe under pavement will be plugged with concrete. Where services do not cross under pavement, the service is entirely removed from "T" connection and "T" capped. On services where "T" connection is under pavement, the service will be removed 1'-0" under curb and capped and concrete blocked. Sewer system will be re-pressure tested. Miscellaneous Developer may be required to put alley in on north property line. Home Owner Maintenance Agreement is required. Recommendation As of 2-3-88, i have not received a Home Owners Maintenance Agreement, and the alley issue is still unresolved. Recommend denial. Fees Dimension- Brooks Corporation has paid $50,537.00 in fees on 84 lots (see attached sheets) assessed in 1985. SMM/sm