Villages C P2-CS 880209 (2) COPPELL PUBLIC WORKS MEMORANDUM February 9, 19.88 TO: Planning & Zoning Department FROM: Public Works Department RE: Villages II - Replat Attached are the comments and fee assessments associated with the above referenced development, which staff believes are applicable to the project. If there are any questions and/or comments regarding this matter, please direct those inquiries to the following departments that are affected. Thank you. Public Works Administration Steve Goram Steven Morton Parks Richard Diano Water Utilities Howard Pafford Streets - Sign/ Signalization Per Birdsall Dana Kamp SMM/sm Attachments Villages II - Replat/ Fees Dimension- Brook Corporation has paid $50,537.00 in fees on January 10, 1986. These fees were calculated for 84 lots. Replat of Villages II will now have 62 lots. Fees Paid Water Availability (84 lots @ $220.00 per lot) = $18,480.00 (Final Plat = $9240.00) (Building Permit = $9,240.00) Sewer Availability (84 lots @ $220.00 per lot) = $18,480.00 (Final Plat = $9,240.00) (Building Permit $9,240.00) Water Load Test = $33.00 Park Fund (84 lots @ $75.00 per lot) = $6,300.00 Street Lights (6 @ $296.00 per light) = $1,776.00 Street Signs = $968.00 Construction Permit Fee = $4,500.00 Total Fees Paid = $50,537.00 Deficient items not resolved/ Recommend denial 1. Home Owner Maintenance Agreement/ received 2/8/88 2. Requirement for alley along North property line All other recommendation/ procedure for the deletion of existing utility listed below have been agreed to by American Developer (utility contractor) Water Where possible, deleted services are to be removed from corporation at main. Services which cross under pavement are to be removed starting 1'-0" under curb both ends and removed from main. Services which .do not cross under pavement will be removed extirely from corporation at main. In areas where main is under pavement and corporation can not be accessed, service will be removed 1'-0" under curb and plugged. No crimping will be allowed. Entire system will be re-hyprostatic tested. Sanitary Sewer Where possible, all sewer services are to be removed at "T" on main,, and "T" permanently capped. Services which cross under pavement are to be removed starting 1'-0" under curb both ends and removed from main at "T" connection and "T" .capped. The abandoned pipe under pavement will be plugged with concrete. Where services do not cross under pavement, the service is entirely removed from "T" connection and "T" capped. On services where "T" connection is under pavement, the service will be removed 1'-0" under curb and capped and concrete blocked. Sewer system will be re-pressure tested. Street Department Has no problem with replat Parks Department ~ Home Owner Maintenance Agreement is required. SMM/sm