Loading...
Villages C P2-CS 880219NATHAN D. MAIER CONSULTING ENGINEERS, INC. February 19, 1988 Mr. Steve Morton City of Coppell P.O. Box 478 Coppell, Texas 75019 Re: Villages of Coppell, Phase 2 NDM Job No.: 84-10-054 Dear Steve: Over the last couple of days, a number of issues have arisen regarding the Villa§es of Coppell, Phase 2. At this time, we would like to pledge our coop- eration in resolving these issues. Listed below, you will find the issues at hand and our proposed solutions to them. 1. Issue: No barricade on MacArthur Blvd. at Allen Road. proposed Solution: We will have in place at this intersection a barri- cade within the next two (2) calendar days. 2. ~ssue: No street crossing permit for construction equipment on Warren Drive. ~rouosed Solution: We request at this time that the City of Coppell issue a permit that will allow us to have built a temporary earthen ramp over Warren Drive, as shown on the attached plan. This ramp will extend from right-of-way line to right-of-way lines, and will be a minimum of 20' wide. The ramp shall have a minimum thickness of not less than six inches as measured from the top of curb. This ramp, if built, will remain in use for approximately 7 working days from the date of con- struction. Following the end of the hauling of earth from the stockpile to the southeast end of Warren Drive, the ramp will be removed and the street cleaned to the City's satisfaction. 3. Issue: No lot. grading permits issued. Proposed Solution: We were not made aware of the City's required lot grading fee at the time the Villages of Coppell, Phase 2, was replatted. That aside, we have contacted Dale Jackson and are in the process providing whatever documentation he may require to procure a permit. If the assessed $175 fee discussed with Dale cannot be waived due to the replat, then it will be paid. Three NorthPark/8800 N. Central Expwy./Suite 300/Dallas, Texas 75231/(214) 739-4741 February 19, 1988 Mr. Steve Morton Page 2 Your cooperation and guidance in resolving these three issues would be much appreciated, as we would like to present this subdivision to the City for acceptance at the earliest possible date. Should you have any questions, please do not hesitate to call me at 739-4741. Respectfully, NATHAN D. MAIER, CON~ULTING/ENOI~ER~, INC. . ' ~ ~ .. ~- ~ . . . '~tchael J: ~arret~ ~G/rdp