Loading...
Villages C P2-CS 880222 Coppell, Texas 75019 The City With A Beautiful Future 214- 462-9010 February 22, 1988 Mike Garrett Nathan D. Maier Three Northpark 8800 N. Central Expwy. Suite 300 Dallas, Texas 75231 RE: Dirt Hauling Operation/Villages II Dear Mr. Garrett: 1 Temporary earthen ramp will extend from right-of-way line to right-of-way lines and will be a minimum of 20' wide. The ramp shall have a minimum thickness of not less than six inches as measured from the top of curb. 2 Flagmen will be at location at all times during hauling. 3 You will place ramp no earlier than 9:00 a.m. each day. 4 You will remove ramp prior to 5:00 p.m. every day. 5 Your company will be held responsible for all damages to streets, curbs, right-of-ways, easements, and utilities. 6 We will need a letter giving your contractor permission to cross private property from property owner(s). 7 I will need a letter from Nathan or Jean Maier addressing these conditions prior to starting haul operating. 8 Following the end of the hauling of earth from the stockpile to the southeast end of Warren Drive, the ramp will be removed and the street cleaned to the City's satisfaction. Thank you, Steven M. Morton Chief of Land Deve~%opment SMM/bb cc: Steve Goram, Director of Public Works