Loading...
ST9601-LR 990227 TEAM Consultants, Inc. Geotechnical, Environmental, Construction Materials Testing February 27, 1999 TEAM Project No. 985142 Report No. 46 Mr. Robert Caudill Tiseo Paving P O Box 270040 Dallas, TX 75227 WRANGLER DRIVE COPPELL, TEXAS Dear Mr. Caudill: Submitted here are results of gradation tests performed this date on lime stabilized subgrade in the locations as shown. % Passing % Passing Location 1-3/4" #4 Sieve Wrangler Road, westbound, Sta 25+50 100.0 62.0 Wrangler Road, westbound, Sta 28+50 100.0 65.0 Wrangler Road, westbound, Sta 31 +00 100.0 66.0 Wrangler Road, westbound, Sta 33+50 100.0 65.0 Specifications: 100.0 Min. 60.0 If you have any questions, please call our office. Sincerely, TEAM Consultants, Inc. Larry Payne, Technici~ LP/ke Time On: 9:00 Time Off: 10:30 Tech. Time: 1.5 hrs. (overtime) Trip Charge: 1 cc: City of Coppell 2970 S. Walton Walker, Suite 101 Dallas, TX 75211 (214) 331-4395 Fax (214) 331-4458 3101 Pleasant Valley, Suite 101 Arlington, TX 76015 (817) 467-5500 Fax (817) 468-9920