Villages C P2-CS 880311NATHAN D. MAIER CONSULTING ENGINEERS, INC.
March 11, 1988
Mr. Steve Morton
City of Coppell
732 Deforest
P.O. Box 478
Coppell, Texas 75019
Re: Villages of Coppell, Phase 2
NDM Job No.: 8~-10-054
Dear Steve:
In response to your request per your letter dated February 22, 1988, we will
have the dirt contractor:
(1) Construct the ramp per item no. 1.
(2) Given the singular use of Warren Drive for the only person living
thereon, we will not provide a flagman. We will, however, instruct the
contractor to yield to any traffic on Warren Drive.
(3) We propose to construct the ramp one time. The yardage to move will
permit us to complete all of our hauling within three (3) working days
or less. Given the singular use of Warren Drive, it does not appear to
be necessary to remove the ramp on a daily basis. However, we will pro-
vide delineators to identify the ramp ~nd will construct the ramp in
such a manner as to allow a car to pass over it.
(4) BDC Development Company will have repaired any damage to public
properties as such damages may relate to our crossing on Warren Drive.
(5) You have been given a letter stating the sale of the dirt to BDC from
Sunbelt Savings. This sale included premise of free access to the site
for removal of the dirt as BDC sees fit.
(6) BDC will have cleaned to the City's satisfaction Warren Drive, per item
no. 8.
Respectfully,
/M. J/G rre~'
M3G/rdp