Loading...
Villages C P2-CS 880401 Coppell, Texas 75019  /~ The City With A Beautiful Future 214-462-0022 April 1, 1988 Pierce-Lunsford Associates, Inc. Suite 206 3109 Carlisle Dallas, Texas 75204 RE: Substantial Completion of Water and Sewer Lines Villages II Dear Mr. Hawkins: On March 23, 1988, Public Works representatives conducted a final walk-through for utilities of Villages II. As of date, all punch l~st items have been resolved to the satisfaction of the Water/Sewer department. At this time, all utilities have been constructed to the City of Coppell's standards. This letter should no way be misconstrued as an acceptance letter. I am writing this letter in' cooperation with the MUD District and their bonding institution. As soon as the alley along the north property line is installed, the City will conduct a formal walk-through for acceptance of Villages II. At that time, as-builts and~ 1 year maintenance bonds will need to be provided the City. Thank you? Steveo M. Morto'n Chief Public Works Inspector SMM/sm cc: Steve Goram, Director of Public Works Howard Pafford, Water Utilities Supervisory File