Loading...
ST9601-LR 980725 TEAM Consultants, Inc. Geotechnical, Environmental, Construction Materials Testing July 25, 1998 TEAM Project No. 985142 Report No. 14, Pg. 1 of 2 Mr. Robert Caudill Tiseo Paving PO Box 270040 Dallas, Texas 75227 WRANGLER DRIVEl COPPELL Dear Mr. Caudill: Submitted here are results of gradation tests performed this date on lime stabilized subgrade in the locations as shown. % Passing % Passing Location 1-3/4" #4 Sieve Sta. 5+50, fight of cente~ine 100.0 70.4 Sta. 3+00, centerline 100.0 66.7 Sta. 1 +00, left of centerline 100.0 68.2 Specifications: 100.0 Min. 60.0 If you have any questions, please call our office. Sincerely, TEAM Consultants, Inc. Tim Pittmon, Technician Time On: 6:00 9:30 11:30 2:30 Time Off: 7:30 11:00 1:00 3:30 Tech. Time: 1.5 hrs. 1.5 hrs. 1.5 hrs. 1.0 hr. (overtime) Trip Charge: 1 1 -- 1 TP/Iw cc: City of Coppell/Larry Davis 2970 S. Walton Walker, Suite 101 Dallas, TX 75211 (214) 331-4395 Fax (214) 331-4458 3101 Pleasant Valley, Suite 101 Arlington, TX 76015 (817) 467-5500 Fax (817) 468-9920 TEAM CONSULTANTS, INC. 2970 S. Walton Walker, Suite 101 Dallas, Texas 75211 214/331-4395 SUMMARY OF FIELD COMPACTION TESTS Mr. Robert Caudill Tiseo Paving DATE: 07/25/98 JOB TITLE: Wrangler Drive PO Box 270040 REPORT NO: 14, Pg. 2 of 2 Coppell Dallas, Texas 75227 JOB NO: 985142 CONTRACTOR: Tiseo FIELD COM PARISON MATERIAL DESCRIPTION TEST TEST % OF AND M C U O W M C U D W MAX. NO. LOCATION CLASSIFICATION (%) (l~cfi {%) {ocf~ DENS. REMARKS 1. Sta. 13+50, centerline Light gray clay with lime 29.2 86.4 29.3 87.9 98.3 * 2. Sta. 10+50, right ofcenterline Light gray clay with lime 34.9 81.6 29.3 87.9 92.8 ** 3. Sta. 7+50, left ofcenterline Tan and gray clay with lime 28.5 79.9 28.2 89.9 88.9 ** 4. Sta. 10+50, right ofcenterline Light gray clay with lime 30.9 83.8 29.3 87.9 95.3 * Retake 5. Sta. 7+50, left ofcenterline Tan and gray clay with lime 30.0 85.4 28.2 89.9 95.0 * Retake 6. Sta. 5+00, right ofcenterline Light gray clay with lime 27.6 84.5 29.3 87.9 96.1 * 7. Sta. 2+00, left ofcenterline Tan and gray clay with lime 26.2 85.7 28.2 89.9 95.3 * REMARKS: * Meets specifications · * Does not meet specifications Iw cc: City of Coppell/Larry Davis