Loading...
ST9601-LR 980724· TEAM Consultants, Inc. : Geotechnical, Environmental, Construction Materials Testing July 24, 1998 TEAM Project No. 985142 Report No. 13, Page 1 of 3 Mr. Robert Caudill Tiseo Paving P O Box 270040 Dallas, TX 75227 WRANGLER DR~VE COPPELL. TEXAS Dear Mr. Caudill: Submitted here are results of gradation tests performed this date on lime stabilized subgrade in the locations as shown. % Passing % Passing Location 1-3/4" #4 ~iCve Sta 13+50, Wrangler, left of centerline 100.0 63.6 Sta 10+50, Wrangler, centerline 100.0 67.5 Sta 7+50, Wrangler, right of centerline 100.0 62.1 Specifications: 100.0 Min. 60.0 The results of in-place density and optimum moisture/maximum density comparison tests performed this date are attached. If you have any questions, please call our office. Sincerely, TEAM Consultants, Inc. Bill Brewer, Technician BB/ke Time On: 9:30 1:00 Time Off: 10:30 2:30 Tech. Time: 1.0 hr. 1.5 hrs. Trip Charge: 1 1 cc: City of Coppell 2970 S. Walton Walker, Suite 101 Dallas, TX 75211 (214) 331-4395 Fax (214) 331-4458 310l Pleasant Valley, Suite 101 Arlington, TX 76015 (817) 467-5500 Fax (817) 468-9920 TEAM CONSULTANTS, INC. 2970 S. Walton Walker, Suite 101 Dallas, Texas 75211 214/331-4395 SUMMARY OF FIELD COMPACTION TESTS Mr. Robert Caudill Tiseo Paving DATE: 07/24/98 JOB TITLE: Wrangler Drive P O Box 270040 REPORT NO: 13, Page 2 of 3 Coppell, Texas Dallas, TX 75227 JOB NO: 985142 CONTRACTOR: Tiseo FIELD COMPARISON MATERIAL DESCRIPTION TEST TEST % OF AND MC UDW MC UDW MAX. NO, LOCATIOI~ CLASSIFICATION (%) (pcf) (%) (pc0 DENS. REMARKS 1. Sta 15+50, left ofcenterline, Brown clay with lime 32.0 83.6 29.3 87.9 95.1 * Retake Wrangler Dr., subgrade 2. Enterprise Drive, Sta 0+90, Brown clay with lime 31 ..2 85.2 29.3 87.9 96.9 * Retake centerline, subgrade REMARKS: * Meets specifications cc: City of Coppeil TEAM CONSULTANTS, INC. 2970 S. Walton Walker, Suite IO! Dallas, Texas 75211 214/3;31-4;595 N:. Rober't Caudill TO: ~seo ~av~ng JOB NO.: 985Z~2 P O ~ 2700~0 REPORT NO.: ~3, 9age 3 o~ 3 ~as, ~ 75227 DATE: 07/24/98 CUST. NO.: -- H~angZeE D~ve PROJECT: CoppeZ~, ~as SAMPLE: S~a 7+50 TEST METHOD: ASh-D-e98 DESCRIPTION:~an and g~ay c~ay ~h ~me MOLD: Z/30 HAMMER:5.5# LIQUID LIMIT: -- DROP: Z2" PLASTICITY INDEX: -- BLOWS: 25 OPTIMUM MOISTURE: 28.2 % LAYERS: 3 MAX. UNIT DRY WT: 89.9 LBS./CU. FT. 94 . ~ 92- ~ 90 z - / ~ 88 ~ .-. / ~ 86' 23 25 27 29 31 33 35 MOISTURE CONTENT IN PERCENT OPTIMUM MOISTUR~ TgST TEAM Consultants, Inc. "TEAM Consultonts, Jnc.