Loading...
Villages of CC 6-LR 950626"Excel Leflce by Experience" PO Box 925~8 * SouthLake, Texas 76092 DAILY CONSTRUCTION REPORT PROJECT: Villages at Cottonwood Creek LOCATION: Coppell JOB ~: 94-1200 DATE: 06-26-95 DAY: Monday TIME: 6:30am-3pm CLIENT: Jim Sowell Construction Comp CONTRACTOR: Glenn Thurman, Inc ACTIVITIES: WF~THER: Hot LOW TEMP: 72F HIGH TEMP: 95F Travelled to job site, as requested, to make sixteen (16) concrete test cylinders. Returned to office. SET #58 LOCATION: Turn Lane, Parkway Blvd @ Buttonwood Dr SLUMP: 3.0" AIR: 5.2% TEMP: AT 75/CT 84 TIME: 8:00am SET #59 LOChTION: Turn Lane, Parkway Blvd@ Hampton Dr BLUMP: 3.0" AIR: 5.0% TEMP: AT 78/CT 86 TIME: 10:00am SET #60 LOCATION: Turn Lane, Parkway Blvd@ Gifford Dr SLUMP: 3.25" AIR: 5.2% TEMP: AT 91/CT 86 TIME: 12 noon sNT #61 LOCATION: Turn Lane, Parkway Blvd@ Graham Dr SLUMP: 3.5" AIR: 5.1% TEMP:.'AT 95/CT 88 TIME: 2:00pm Brandon McKenzie Technician