Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Villages of CC 6-LR 950622
,'Excel Lence by Experience,' PO Box 9Z548 · Southtake, Texas 76092 DAILY CONSTRUCTION REPORT PROJECT: Villages at Cottonwood Creek LOCATION: Coppe11 JOB ~: 94-1200 DATE: 06-22-95 DAY: Thursday TIME: 8am-10am lpm-3pm CLIENT: Jim Sowell Construction Comp CONTRACTOR: Glenn Thurman, Inc ACTIVITIES: WEATHER: Clear & Hot LOW TEMP: 76F HIGH TEMP: 92F Travelled to job site, as requested, to make eight (8) concrete test cylinders. Returned to office. SET #56 LOCATION: Elbow @ Alley B-1 SLUMP: 3.2§" AIR: 5.1% TEMP: AT 82/CT 83 LOCATION: Elbow @ Alley A SLUMP: 3.75" AIR: 5.0% SET #57 TEMP: AT 92/CT 87 TIME: 8:30am TIME: 2:00pm Brandon McKenzie Technician Box 9;54.8 · SouthLeke, Texas 76092 COI~LTTNG ENG~'NEERB 'rN: ~v! ronmentsL Assessments SoiLs & Foundations Commercial & IndustriaL Inspection (817) 3Z9-0281 CONCRETE CYLINDER TEBT RESULT8 PROJECT: Villages at Cottonwood Creek LOCATION: Coppell JOB #: 94-1200 DATE OF BREAK: 06-22-95 DAY: Thursday CLI~: Jim Sowell Construction Comp COI~I~CTOR= Glenn Thurman Inc CYL. 8LUMP DATE OF DAY8 I,D. LOCATION (IN,) SAMPLE AGED POUNDB PSI Clifton Ct: 53 A @ cul-de-sac 53 B @ cul-de-sac 3.75" 06-15-95 7 90,500 3201 3.?5" 06-15-95 7 88,500 3131 Elbow: 54 A @ Alley C-1 54 B @ Alley C-1 55 A @ Alley C-2 55 B @ Alley C-2 3.0" 06-15-95 7 89,000 3148 3.0" 06-15-95 7 91,000 3219 3.25" 06-15-95 7 88,500 3131 3.25" 06-15-95 7 91,000 3219 8PECXFICATIONS: 3000 psi @ 28 days SUPPLIER: Glenn Thurman, Inc Brandon McKenzie Technician