Loading...
Villages of CC 6-LR 950621,,Excel. I. ence by Experience" PO Box 925~8 South[ake, Texas 76092 COb~St~ULTING ENGINEERB ZN: _'.nvJ ron~enta[ Assessments Soils & Foundations Construction #ateria[s Testing Co~nercia[ & Industrial Inspection (817) 3L~-0281 CONCRETE CYLINDER TEST RESULTS PROJECT: Villages at Cottonwood Creek LOCATION: Coppell JOB ~: 94-1200 DATE OF BREAK: 06-21-95 DAY: Wednesday CLIENT: Jim Sowell Construction Comp CONTR]tCTOR: Glenn Thurman Inc CYL. SLUMP DATE OF DAYB I.D. LOCATION (IN.) SAMPLE AGED POUNDS PSI Elbow: 50 A @ Alley D-4 50 B @ Alley D-4 51 A @ Alley A-3 51 B @ Alley A-3 Eyebrow: 52 A @ Pedmore Dr 52 B @ Pedmore Dr 3.75" 06-14-95 7 88,500 3131 3.75" 06-14-95 7 90,000 3184 3.0" 06-14-95 7 87,000 3077 3.0" 06-14-95 7 87,500 3095 3.25" 06-14-95 7 85,500 3024 3.25" 06-14-95 7 87,000 3077 SPECIFICATIONS: 3000 psi @ 28 days 8UPPLIER: Glenn Thurman, Inc Brandon McKenzie Technician