Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Villages of CC 6-LR 950616
"Excet fence by Experience" PO Box 92548 * Southtake, Texas 76092 CO)~ULTING ENGINEERB ZN: ~nvi ronmenta L Assessmonts Soi~s & Foundations Construction Heteriats Testing CoflmerciaL & l~striaL Ins~cti~ (817) 329-0281 DAILY CONBTRUCTION REPORT PROJECT: Villages at Cottonwood Creek LOCATION: Coppell JOB #: 94-1200 DATE: 06-16-95 DAY: Friday TIME: 3pm-5pm CLIENT: Jim Sowell Construction Comp CONTRACTOR: Glenn Thurman, Inc ACTIVITIES'. WRATHER: Clear & Hot LOW TEMP: 68F HIGH TEMP: 91F Travelled to job site, as requested, to pick up twelve (12) concrete test cylinders made on 06-15-95. Returned to office. Brandon McKenzie Technician "ExceLLence by Experience" PO Box 92548 · Southtake, Texss 76092 CO~ULTXNG ENGXNEER8 IN: Envi ronmenta[ Assessments Soils & Foundations Construction #aterists Testing Coe~ercis[ & Industrial Inspection (817) 329-0281 CONCRETE CYLXNDER TEST RESULTS PROJECT: Villages at Cottonwood Creek LOCATION: Coppell JOB #: 94-1200 DATE OF BREAK: 06-16-95 DAY: Friday CLIENT: Jim Sowe11 Construction Comp CONTRACTOR: Glenn Thurman Inc CYL. SLUMP DATE OF DAYS I.D. LOCATION (IN.) SAMPLE AGED POUNDS PSI Alley C-1: 43 A @ Station 4+25 43 B @ Station 4+25 Alley F: 44 A @ elbow 44 B @ elbow Intersection, Loxley Dr: 44 A @ Layton Dr 44 B @ Layton Dr Intersection, Pedmore: 45 A @ Gilford Dr 45 B @ Gilford Dr 3.25" 06-09-95 7 destroyed on site 3.25" 06-09-95 7 destroyed on site 3.75" 06-09-95 7 65,000 2299 3.75" 06-09-95 7 67,500 2388 3.5" 06-09-95 7 73,500 2600 3.5" 06-09-95 7 75,000 2653 3.25" 06-09-95 7 79,000 2795 3.25" 06-09-95 7 77,500 2741 SPECIFICATIONS: 3000 psi @ 28 days SUPPLIER: Glenn Thurman, Inc Brandon McKenzie Technician