Loading...
ST9601-LR 990720 TEAM CONSULTANTS, INC. 2970 S. Wallon Walker, Snile I O l Dallas, Texas 7521 I 2141331-4395 DRLLLED CORE WORKSHEET Mr. Robert Caudill Tiseo Paving DATE: 07/20/1999 JOB TITLE: Wrangler Drive P O Box 270040 REPORT NO: 83 Coppell, Texas Dallas, Texas 75227 JOB NO: 985142 LENGTH LENGTH COMPRESSIVE STRENGTH r-- BEFORE AFTER L/D L/D m SAWING CAPPING DIAMETER AREA CORREC- LOAD UNCORRECTED CORRECTED t~ LOCATION {INCHES) (INCHES) {INCHES) SQ. IN L/D TION LBS. . (PSI) {PSI} . a Westbound right lane, Sta 37+ 14 8.00 5.88 4.0 12.57 1.47 .960 54,000 4295 4120 r-- Westbound left lane, Sta 36+94 6.50 6.63 4.0 12.57 1.66 .972 48,500 3858 3750 z 07/19/1999 G. Tech Coring Asst. Tech ~3 TIME ON: ! 2:45 I2:45 u3 MOISTURE CONDITION: As Received TIME OFF: 3:i5 3:!5 DIRECTION OF APPLICATION OF LOAD: Vertical c~ NO~ilNAL MAXIMUM SIZE OF AGGREGATE: I~fA TECH. TIME: 2.5 hrs. 2,5 hrs. 7 TRIP CHARGE: 1 ;, kc Michael Stanley, Technicia~