ST9601-LR 990720 TEAM CONSULTANTS, INC.
2970 S. Wallon Walker, Snile I O l Dallas, Texas 7521 I
2141331-4395
DRLLLED CORE WORKSHEET
Mr. Robert Caudill
Tiseo Paving DATE: 07/20/1999 JOB TITLE: Wrangler Drive
P O Box 270040 REPORT NO: 83 Coppell, Texas
Dallas, Texas 75227 JOB NO: 985142
LENGTH LENGTH COMPRESSIVE STRENGTH
r-- BEFORE AFTER L/D L/D
m SAWING CAPPING DIAMETER AREA CORREC- LOAD UNCORRECTED CORRECTED
t~ LOCATION {INCHES) (INCHES) {INCHES) SQ. IN L/D TION LBS. . (PSI) {PSI} .
a Westbound right lane, Sta 37+ 14 8.00 5.88 4.0 12.57 1.47 .960 54,000 4295 4120
r-- Westbound left lane, Sta 36+94 6.50 6.63 4.0 12.57 1.66 .972 48,500 3858 3750
z
07/19/1999
G. Tech Coring Asst. Tech
~3 TIME ON: ! 2:45 I2:45
u3 MOISTURE CONDITION: As Received TIME OFF: 3:i5 3:!5
DIRECTION OF APPLICATION OF LOAD: Vertical
c~ NO~ilNAL MAXIMUM SIZE OF AGGREGATE: I~fA TECH. TIME: 2.5 hrs. 2,5 hrs.
7 TRIP CHARGE: 1
;, kc Michael Stanley, Technicia~