Loading...
Villages of CC 6-LR 950606"ExceLLence by Experience" PO Box 92548 SouthLake, Texas 76092 CO~".ULTING ENGINEERS IN'- .nvJ ronmentaL Assessments SoJ Ls & Foundations Construction 14ateriaLs Testing Commercial & Industrial Inspection (817) 329-0281 DAILY CONSTRUCTION REPORT PROJECT: Villages at Cottonwood Creek LOCATION: Coppell JOB #: 94-1200 DATE: 06-06-95 DAY: Tuesday TIME: 6:30am-3:30pm CLIENT: Jim Sowell Construction Comp CONTBACTOR: Glenn Thurman, Inc ACTIVITIES: WEATHER: Sunny & Hot LOW TEMP: 70F HIGH TEMP: 96F Travelled to job site, as requested, to make twelve (12) concrete test cylinders and to pick up twenty (20) test cylinders made on 06-05-95. Returned to office. SET #32 LOCATION: Pedmore Dr @ cul-de-sac SLUMP: 3.25" AIR: 4.9% TEMP: AT 80/CT 82 SET #33 LOCATION: Alley D-1 @ Station 2+00 SLUMP: 2.5" AIR: 5.2% TEMP: AT 90/CT 83 SET #34 LOCATION: Alley E @ Station 4+50 SLUMP: 2~75" AIR: 5.0% TEHP: AT~96/CT 86 TIME: 9:30am TIME: 12 noon TIME: 3:00pm Brandon McKenzie Technician "Excellence by Experience" PO Box 925/,8 · South[aka, Texas 76092 CO"~ULTING ENGINEERS IN: Environmental Assessments Soits & Foundations Construction Materials Testing Commercial & lndustriat Inspection (817) ]29-0281 CONCRETE CYLINDER TEST RESULTS PROJECT: Villages at Cottonwood Creek LOCATION: Coppell JOB #: 94-1200 DATE OF BRF~K: 06-06-95 DAY: Tuesday CLIENT: Jim Sowell Construction Comp CONTRACTOR: Glenn Thurman Inc CYL. SLUMP DATE OF DAYS I · D · LOCATION ( IN · ) SAMPLE AGED POUNDS PSI Hardwick Ct: 9 A @ cul-de-sac 9 B @ cul-de-sac Comptom Ct: 10 A @ Station 1+00 10 B @ Station 1+00 Loxley Dr: 11 A @ Station 5+50 11 B @ Station 5+50 12 A @ Station 2+00 12 B @ Station 2+00 Layton Dr: 13 A @ Station 5+00 13 B @ Station 5+00 14 A @ Station 3+00 14 B @ Station 3+00 3.75" 05-30-95 7 80,000 2830 3.75" 05-30-95 7 82,500 2918 2.75" 05-30-95 7 81,500 2883 2.75" 05-30-95 7 82,000 2901 2.0" 05-30-95 7 85,500 3024 2.0" 05-30-95 7 86,000 3042 2.25" 05-30-95 7 83,500 2954 2.25" 05-30-95 7 85,500 3024 2.0" 05-30-95 7 86,500 3060 2.0" 05-30-95 7 84,000 2971 2.25" 05-30-95 7 84,500 2989 2.25" 05-30-95 7 86,000 3042 SPECIFICATIONS: 3000 psi @ 28 days SUPPLIER: Glenn Thurman, Inc Brandon McKenzie Technician