Loading...
Villages of CC 6-LR 950605"Excel. l. ence by Experience. CCY3LTZNG ENGINEERS Environmental Assessments Soils & Foundations Construction Materials Testing Comnerciat & Industrial inspection PO BOX 92548 · South[ake, Texas 76092 · (817) 329-0281 DAILY CONBTRUCTZON REPORT PROJECT: Villages at Cottonwood Creek LOCATION: Coppell JOB #: 94-1200 DATE: 06-05-95 DAY: Monday TIME: 6:30am-4pm CLIENT: Jim Sowell Construction Comp CONTRACTOR: Glenn Thurman, Inc ACTIVITIES: WEATHER: Ptly Cloudy LOW TEMP: 71F HIGH TEMP: 94F Travelled to job site, as requested, to make twenty (20) concrete test cylinders and to pick up twenty-four (24) test cylinders made on 06-03-95. Returned to office. SET #27 LOCATION: Fairlands Cir @ cul-de-sac SLUMP: 3.25" AIR: 5.1% TEMP: AT 75/CT 78 SET #28 LOCATION: Fairlands Cir @ Station 0+60 SLUMP: 2.75" AIR: 5.0% TEMP: AT 79/CT 81 SET #29 LOCATION: Graywood Ln @ Station 8+00 SLUMP: 2.~5" AIR: 4.9% TEMP: AT 92/CT 83 SET #30 LO~ATION: Buttonwood Dr @ Station 2+00 SLUNP: 2.,25" AIR: 5.1% TEMP: AT'93/CT 84 SET #31 LOCATION: Graywood Ln @ Station 11+50 SLUMP: 2.5" AIR: 5.2% TEMP: AT 94/CT 84 TIME: 8:30am TIME: 10:45am TIME: 1:00pm TIME: 2:00pm TIME: 3:15pm Brandon McKenzie Technician