Villages of CC 6-LR 950605"Excel. l. ence by Experience.
CCY3LTZNG ENGINEERS
Environmental Assessments
Soils & Foundations
Construction Materials Testing
Comnerciat & Industrial inspection
PO BOX 92548 · South[ake, Texas 76092 · (817) 329-0281
DAILY CONBTRUCTZON REPORT
PROJECT: Villages at Cottonwood Creek LOCATION: Coppell
JOB #: 94-1200 DATE: 06-05-95 DAY: Monday TIME: 6:30am-4pm
CLIENT: Jim Sowell Construction Comp CONTRACTOR: Glenn Thurman, Inc
ACTIVITIES:
WEATHER: Ptly Cloudy
LOW TEMP:
71F HIGH TEMP: 94F
Travelled to job site, as requested, to make twenty (20)
concrete test cylinders and to pick up twenty-four (24) test
cylinders made on 06-03-95. Returned to office.
SET #27
LOCATION: Fairlands Cir @ cul-de-sac
SLUMP: 3.25" AIR: 5.1% TEMP: AT 75/CT 78
SET #28
LOCATION: Fairlands Cir @ Station 0+60
SLUMP: 2.75" AIR: 5.0% TEMP: AT 79/CT 81
SET #29
LOCATION: Graywood Ln @ Station 8+00
SLUMP: 2.~5" AIR: 4.9% TEMP: AT 92/CT 83
SET #30
LO~ATION: Buttonwood Dr @ Station 2+00
SLUNP: 2.,25" AIR: 5.1% TEMP: AT'93/CT 84
SET #31
LOCATION: Graywood Ln @ Station 11+50
SLUMP: 2.5" AIR: 5.2% TEMP: AT 94/CT 84
TIME: 8:30am
TIME: 10:45am
TIME: 1:00pm
TIME: 2:00pm
TIME: 3:15pm
Brandon McKenzie
Technician