ST9601-LR 990524 TEAM CONSULTANTS, INC.
2970 S. Walton Walker, Suite 101 Dallas, Texas 75211
214/331-4395
SUMMARY OF FIELD COMPACTION TESTS
Mr. Robert Caudill
Tiseo Paving DATE: 05/24/1999 JOB TITLE: Wrangler Drive
P O Box 270040 REPORT NO: 65 Coppell, Texas
Dallas, TX 75227 JOB NO: 985142
CONTRACTOR: '-
FIELD COMPARISON
MATERIAL DESCRIPTION TEST TEST % OF
AND MC UDW MC UDW MAX.
NO. LOCATION CLASSIFICATION (%) (pcf) {%) {pcf) DENS. REMARKS
I. Sta 0+75, Crestside Drive, Dark brown clay with cement 27.8 90.9 26.5 93.3 97.4 *
west, 1.0' below surface
2. Sta 20+18, 65' right ofcenterline, Tan and light gray clay with lime 26.7 88.6 26.4 92.8 95.5 *
centerline of west driveway,
1.0' below surface
3. Sta 30+55, 50' right of centerline, Dark brown clay with lime 25.0 92.6 26.5 93.3 99.2 *
Lakeshore Drive, 1.0' below
surface
REMARKS: * Meets specifications
Time On: 2:30
Time Off: 4:30
Tech. Time: 2.0 hrs.
Trip Charge: 1 SIGNED:
ke Larry Sneath, Teclmician
cc: City of Coppell