Loading...
Villages of CC 6-LR 950530"ExceLLence b~ Experience" PO Box 925&8 · Southtake, Texss 76092 · COF'~LTINQ ENGINEERS IN= ~nviror~entet Assessments Soits& Foundations Construction Nater~ete Testing Com~rciet & lr~ustrieL 1tie,action (817) 329-0281 DAILY CONSTRUCTION REPORT PROJECT: Villages at Cottonwood Creek LOCATION: Coppell JOB #: 94-1200 DATE: 05-30-95 DAY: Tuesday TIME: 6:30am-Spm CLIENT: Jim Sowell Construction Comp CONTRACTOR: Glenn Thurman, Inc ACTIVITIES: , WEATHER: Overcast LOW TEMP: 70F HIGH TEMP: 84F Travelled to job site, as requested, to make twenty-four (24) concrete test cylinders and to pick up twelve (12) test cylinders made on 05-26-95. Returned to office. SET ~9 LOCATION: Hardwick Ct @ cul-de-sac , SLUMP: 3.75" AIR: 5.2% TEMP: AT 71/CT 77 TIME: SET #10 LOCATION: Compton Ct @ Station 1+00 SLUMP: 2.75" AIR: 5.0% TEMP: AT 75/CT 80 SET #11 LOCATION: Loxley Dr @ Station 5+50 SLUMP: 2.0" AIR: 4.8% TEMP: AT 85/CT 82 SET #12 LOCATION: Loxley Dr @ Station 2+00 BLUMP: 2.25" AIR: 5.0% TEMP: AT 84/CT 82 SET #13 LOCATION: Layton Dr @ Station 5+00 SLUMP: 2,0" AIR: 4.7% TEMP: AT.85/CT 84 SET #14 LOCATION: Layton Dr @ Station 3+00 SLUMP: 2.25" AIR: 5.0% TEMP: AT 87/CT 84 8:30am TIME: ll:00am TIME: l:00pm TIME: 2:30pm TIME: 3:30pm TIME: 4:30pm Brandon McKenzie Technician