Loading...
ST9601-LR 990513 TEAM CONSULTANTS, INC. 2970 S. Walton Walker, Suite 101 Dallas, Texas 75211 214/331-4395 SUMMARY OF FIELD COMPACTION TESTS Mr. Robert Caudill Tiseo Paving DATE: 05/13/1999 JOB TITLE: Wrangler Drive P O Box 270040 REPORT NO: 64 Coppell, Texas Dallas, TX 75227 JOB NO: 985142 CONTRACTOR: -- FIELD COMPARISON MATERIAL DESCRIPTION TEST TEST % OF AND MC UDW MC UDW MAX. NO. LOCATION CLASSIFICATION (%) (pcf) (%) (pcf) DENS. REMARKS Eastbound Lane~ Wrangler 1. Sta 18+50 Dark brown clay with gravel and lime 24.7 91.2 26.5 93.3 97.7 * 2. Sta 21+50 Dark brown clay with gravel and lime 25.9 89.3 26.5 93.3 95.7 * 3. Sta 24+50 Dark brown clay with gravel and lime 25.5 88.8 26.5 93.3 95.2 * 4. Sta 27+50 Dark brown clay with gravel and lime 26.1 90.2 26.5 93.3 96.7 * 5. Sta 30+50 Dark brown clay with gravel and lime 28.8 88.7 26.5 93.3 95.1 * 6. Sta 33+50 Dark brown clay with gravel and lime 25.6 91.2 26.5 93.3 97.7 * 7. Sta 30+50 Dark brown clay with gravel and lime 25.5 90.5 26.5 93.3 97.0 * Retake 8. Sta 36+50 Dark brown clay with gravel and lime 26.1 92.1 26.5 93.3 98.7 * 9. Sta 39+50 Dark brown clay with gravel and lime 26.9 89.1 26.5 93.3 95.5 * 10. Sta 42+50 Dark brown clay with gravel and lime 26.0 90.2 26.5 93.3 96.7 * REMARKS: * Meets specifications Time On: 1:30 Time Off.' 3:30 Tech. Time: 2.0 hrs. Trip Charge: 1 SIGNED: ke Eric Pride, Technician cc: City of Coppell