Loading...
Villages of CC 6-LR 950523**Excel Lance by Experience*" PO Box 92548 · SouthLeke, Texas ?6092 CO~ULTING ENGINEERS IN: EnvironmentaL Assessments SoiLs & Foundations Construction llaterisLs Testin9 C~mmercieL & Industrial Inspection (817) $29-0281 CEHENT SUBGRADE GRADATION REPORT PROJECT: Villages at Cottonwood Creek LOCATION: Coppell JOB #: 94-1200 'DATE: 05-23-95 DAY: Tuesday TIME: 1:00pm CLIENT: Jim Sowell Construction Comp CONTRACTOR: Glenn Thurman, Inc , % PASSING LOCATION 1" SIEVE Left Turn Lane, Parkway: 1. @ Buttonwood 2. @ Hampton 3. @ Gifford 4. @ Graham PASSING 1/2" SIEVE #4 SIEVE 100.0% 78.5% 59.7% 100.0% 82.7% 63.4% 100.0% 78.0% 61.5% 100.0% 76.7% 55.9% SPECIFICATIONS: 100.0% Passing 1" Sieve 70.0% Pa~in~ 1/2" Sieve 45.0% Passing #4 Sieve REMARKS: Densities taken at same time. Jeff Holden Technician "Excettence by Experierice" PO Box 92548 * Southtake, Texas 76092 CO"~ULTING ENGINEERS IN-' EnvJ ronmental. Assessments Soits & Foundations Construction #aterlals Testing Co~merciat & Industrial Inspection (817) 329-0281 FIELD COMPACTION REPORT PROJECT: Villages at Cottonwood Creek JOB #: 94-1200 DATE: 05-23-95 DAY: Tuesday CLIENT: Jim Sowell Construction Comp TEST NO. LOCA~IONAND LIFT LOCATION: Coppell TIME: 1:00pm CONTRACTOR: Glenn Thurman WATER DRY PER- PROCTOR CONT. DEN CENT NU~ER (%) (PCF) COMP Left Turn Lane, Parkway: 1. @ Buttonwood 2. @ Hampton 3. @ Gilford 4. @ Graham FG FG FG FG 7 17.1 109.5 97.0 7 15.9 111.7 99.0 6 20.1 101.9 97.7 6 20.9 102.3 98.1 RBMARKS: All tests passed. Minimum Compaction Required: Gradations taken at same time. FG = Final Grade 95% PROCTORS: 6. Cement Trtd Dk Brn Sandy Clay 7. Cement Trtd Reddish Brn Clayey Sand 104.2 PCF @ 19.2% MOISTURE 112.8 PCF @ 15.5% MOISTURE Jeff Holden Technician