Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Villages of CC 6-LR 950512
"Excel Lance by Experience" PO Box 92568 · SouthLske, Texas 76092 · CO., JLTING ENGINEERS IN,' EnvJ ronmentaL Assessments Soits & Foundations Construction 14aterla[s Testing Coa~nercia[ & Industrial Inspection (817) 329-0281 CEHENT 8UBGI~DE GRADATION REPORT PROJECT: Villages at Cottonwood Creek LOCATION: Coppell JOB #: 94-1200 DATE: 05-12-95 DAY: Friday TIME: 10:00am CLIENT: Jim Sowell Construction Comp CONTRACTOR: Glenn Thurman, Inc ! m mm mmmm .mmmmmmmmmmmmmmmmm mm mmmmmmmmmmmmm ~ % PASSING % PASSING % PASSING LOCATION 1" SIEVE 1/2" SIEVE #4 SIEVE Hardwick Ct: 1. @ Station 1+50 100.0% 87.6% 71.3% Blackfield Dr: 2. @ Station 1+00 3. @ Station 4+00 100.0% 88.4% 74.3% 100.0% 77.6% 70.8% SPECIFICATIONS: 100.0% Passing 1" Sieve 70.0% Passing 1/2" Sieve 45.0% Passing $4 Sieve REMARKS: Minimum of 4 tests per trip. Collected three (3) soil samples for Cement Treated Moisture-Density Relations $5, $6, and $7 at same time. Patrick Corbett Technician "ExceLLence by' Experience. PO Box 92548 * $outhteke, Texas 76092 CC~'~LTZNG ENGINEER8 'tN: Environ~entat Assessments SoiLs & Foundations Construction #aterJeLs Testing Co~nercia( & %ndustriat %nspectioo (817) 329-0281 CEMENT BUBGI~.DE GI~,D&TION REPORT PROJECT: Villages at Cottonwood Creek LOCATION: Coppell JOB #: 94-1200 D~TE: 05-12-95 DAY: Friday TIME: 1:00pm CLIENT: Jim Sowell Construction Comp CONTRACTOR: Glenn Thurman, Inc LOCATION Loxley Dr: 1. @ Station 6+50 Compton Ct: 2. @ Station 1+00 3. @ Station 4+00 Graham Dr: 4. @ Station 2+00 5. @ Station 5+00 Layton Dr: 6. @ Station 1+00 7. @ Station 4+00 8. @ Station 7+00 1" 8IEVE % PABBINQ % PABBING 1/2" SIEVE #4 SIEVE 100.0% 81.4% 77.6% 100.0% 83.7% 74.8% 100.0% 84.2% 72.7% 100.0% 88.3% 66.8% 100.0% 82.3% 67.4% 100.0% 80.6% 71.8% 100.0% 77.6% 72.4% 100.0% 78.2% 70.3% BPECIFICATION~: 100.0% Passing 1" Sieve 70.0% Passing 1/2" Sieve 45.0% Passing #4 Sieve REMARKS: Densities taken at same time. Patrick Corbett Technician ,'Excel Lence by Experience" PO Box 925&8 · gouthiake, Texss 76092 · CO/'~'ILTZNG ENGZNEERB IN: Environmental Assessments Soits & Foundations Construction Nateriats Testing Commrciat &[ndustriaL Inspection (817) 329-0281 FIELD COMPACTZON REPORT PROJECT: Villages at Cottonwood Creek LOCATION: Coppe11 JOB #: 94-1200 DATE: 05-12-95 DAY: Friday TIME: 1:00pm CLIENT: Jim Sowell Construction Comp CONTRACTOR: Glenn Thurman NATER DRY PER- TEHT PROCTOR CONT. DEN CENT NO. LOCATION AND LIFT NUMBER (%) (PCF) COMP Blackfield Dr: 1. @ Station 1+00 2. @ Station 4+00 Hardwick Ct: 3. @ Station 1+50 Loxley Dr: 4. @ Station 1+00 5. @ Station 4+00 6. @ Station 7+00 Compton Ct: 7. @ Station 1+00 8. @ Station 4+00 Graham Dr: 9. @ Station 2+00 10. @ Station 5+00 Layton Dr: 11. @ Station 1+00 12. @ Station 4+00 13. @ Station 7+00 FG 7 16.7 110.6 98.0 FG 7 16.5 110.8 98.2 FG 7 16.9 109.0 96.6 FG 7 17.7 109.8 97.3 FG 7 14.8 107.6 95.3 FG 7 14.4 108.2 95.9 FG 7 14.7 108.8 96.4 FG 7 14.6 108.8 96.4 FG 6 19.6 103.4 99.2 FG 6 20.4 103.6 99.4 FG 6 18.4 102.4 98.2 FG 6 19.1 102.6 97.9 FG 6 20.4 108.2 99.0 REMARKS All tests passed. Minimum compaction Required: FG = Final Grade 95% PROCTORS: 6. Cement Trtd Dk Brn Sandy Clay 7. Cement Trtd Reddish Brn Clayey Sand 104.2 PCF @ 19.2% MOISTURE 112.8 PCF @ 15.5% MOISTURE Patrick Corbett Technician