D&IL¥ CONSTRUCTION REPORT
PROJECT: Villages at Cottonwood Creek LOCATION: Coppell
JOB #: 94-1200 DATE: 04-28-95 DAY: Friday TIME: 9am-12noon
CLIENT: Jim $owell Construction Comp CONTRACTOR: Wiseco Land Dev
ACTIVITIEB:
WEATHER: Ptly Cloudy
LOW TEMP: 58F HIGH TEMP: 78F
Travelled to job site, as requested, to meet with Mr. Tom Wise,
Mr. Garreth Campbell, and Mr. Ricky Lozano to discuss the
Plasticity Index Analysis performed from April 21-27, 1995, and to
recommend that four (4) percent portland cement (24 pounds per
square yard) be used for paving subgrade stabilization.
Returned to office.
Louis L. Hargis, P.E.
GEO -
TECHNIQUE
INC.
"Excellence by Experience"
April 28, 1995
City of Coppell
Engineering Department
P.O. Box 478
Coppell, Texas 75019
Attn: Mr. Mike Martin
CONSULTING SPECIALISTS IN:
Environmental Assessments
Environmental Engineering
Soils & Foundation Engineering
Construction Materials Testing
Commercial & Industrial Inspection
Paving Subgrade Stabilization
Villages at Cottonwood Creek, Ph VI
Coppell, Texas
94-1200
Dear Mr. Martin:
Enclosed please find the results of twenty-two (22) Atterberg
Limits tests performed on finish subgrade soJ~ls at the specified
locations throughout the above referenced project.
The Plasticity indices (PI's) revealed soils from light to Iaoderate
activity on the streets. In our opinion, tbs addition of hydrated
lime would produce an a~verse effect on these soils.
Therefore, we recommend that tJu~--tol0 ~lx~~hes~ finish
subgrade be stabilized with ~-r~ (4)~p~~cement (24
pound~ per square yard). This a~ap~ication will not only cut down
th? higher PI's, but also increase ~hear strength of the treated
soxls.
I trust this is the information you} desire. If we can be of
further assistance or service, pleas~call on us.
/
Respectfully submitted,
~eo-Teohn~que, In~.,
Louis L. Hargis, P.E.
President
P.O. Box 92548 · Southlake, Texas 76092
(817) 329-0281 · (800) 348-6308 · Fax (817) 488-1866
,,Excel. tence by Experience"
PO Box 92548
S~th[ake, Texas ~2 ·
CONP~TZNG ENGZNEERS
~,,¢ironmentaL Assessments
SoiLs & Foundations
Construction Materials Testing
Coanerc~al & Industrial Inspection
(817) 329-0281
PLASTZCZTY ZNDEX REPORT
PROJECT: Villages at Cottonwood Creek
JOB #: 94T1200 DATE: 04-27.95
CLIENT: Jim Sowell Construction Company
LOCATION: Coppell
DAY: Thursday
CONTRACTOR: Wiseco
LOCATION SOIL
LL PL PI
Graywood Ct:
1. @ Station 13+00
2. @ Station 10+00
Buttonwoo~ Dr:
3. @ Station 1+50
Fairlands Cir:
4. @ Station 1+50
~raywood Ln:
5. @ Station 6+00
Hampton Dr:
6. @ Station 1+50
Po~aore Dr:
7. @ Station 10+00
8. @ Station 5+00
9. @ Station 1+50
~ifford Dr:
10. @ Station 15+00
11. @ Station 10+00
12. @ Station 9+00
Hardwlok Dr:
13. @ Station 2+00
Bl&okf~old Dr:
14. @ Station 2+00
compton ct:
15. @ Station 2+00
Loxle~ Dr:
16. @ Station 6+00
17. @ Station 1+00
Graham Dr:
18. @ Station 1+00
19. @ Station 5+00
Layton Dr:
20. @ Station 6+00
21. @ Station 1+50
Clifton Dr:
22. @ Station 3+00
Tan/Brown Silty Clayey Sand
Light Brown Clayey Sand
Red Tan Clayey Sand
Brown/Tan Clayey Sand
Brown Silty Clayey Sand
Brown Clayey Sand
Dark Brown Silty Sandy Clay
Dark Brown Clayey Sand
Brown Clayey Sand
Dark Brown Sandy Clay
Dark Brown Silty Sandy Clay
Brown Sandy Clay
Tan/Brown Clayey Sand
Tan/Brown Clayey Sand
Light Brown Clayey Sand
Tan Clayey Sand
Brown Clayey Sand
Reddish Brown Clayey Sand
Dark Brown/Brown Sandy Clay
Light Brown Silty Sandy Clay
Dark Brown Sandy Clay
Dark Brown Sandy Clay
29 16 13
30 17 13
26 14 12
29 15 14
31 15 16
33 15 18
38 18 20
27 12 15
34 14 20
38 15 23
38 18 20
38 17 21
22 14 8
22 14 8
21 15 6
25 12 13
31 15 16
22 13 9
36 16 21
39 16 23
41 15 26
43 23 20
Jeff Holden
Technician