Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Villages of CC 6-LR 950413
"F. xcet tence by Experience', PO Box 92548 , South[aka, Texas 76092 CO~'NJLTING ENGINEER8 TN: Envi ronmentat Assessments SoiLs & Foundations Construction NsteriaLs Testing CemmerciaL & Industrial Inspection (817) 329-0281 FIELD COMPACTION REPORT PROJECT: Villages at Cottonwood Creek LocATIoN: Coppell JOB #: 94-1200 DATE: 04-13-95 DAY: Thursday TIME: 12:30pm CLIENT: Jim Sowell Construction Comp CONTRACTOR: Legend WATER DRY PER- TEST PROCTOR CONT. DEN CENT NO. LOCATIONAND LIFT NUMBER (%) (PCF) COMP Line G, 8" Water Line: 1. @ Station 2+50 2. @ Station 2+50 3rd Lift i 20.5 99.8 95.4 2nd Lift 1 20.5 99.9 95.5 Line F, 8" Water Line: 3. @ Station 14+50 4. @ Station 14+50 3rd Lift I 18.9 102.4 97.9 2nd Lift i 18.1 103.6 99.0 Water Service, Block A: 5. @ Lot 49 6. @ Lot 54 7. @ Lots 55/56 2nd Lift i 20.4 101.5 97.0 2nd Lift I 19.9 101.9 97.4 3rd Lift i 18.2 104.5 99.9 Rg/Otl~8: All tests passed. Minimum Compaction Required: 95% PROCTORS: 1. Brown & Tan Sandy Clay 104.6 PCF @ 17.6% MOISTURE Chris Quentin Technician