Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Villages of CC 6-LR 950403 (2)
-ExceLLence by Experience" PO Box 92548 Southiake, Texas ?6092 ~nviroreenta[ Assessments Soils & Foundations Construction Materials Testing Co~a~ercia[ & Industrial Inspection (817) ]29-0281 FZELD COMPACTION REPORT PROJECT: Villages at Cottonwood Creek JOB #: 94-1200 DATE: 04-03-95 DAY: Monday CLZENT: Jim Sowell Construction Comp LOCATION: Coppell TIME: 8:30am CONTRACTOR: Legend TEST PROCTOR NO. LOCATION AND LIFT NUMBER 8" Water Line: 1. @ Block A, Lot 61 2. @ Block A, Lot 61 3. @ Block A, Lot 64 4. @ Block A, Lot 64 5. @ Block A, Lot 68 6. @ Block A, Lot 68 7. @ Block A, Lot 72 8. @ Block A, Lot 72 9. @ Block A, Lot 76 10. @ Block A, Lot 76 11. @ Block A, Lot 79 12. @ Block A, Lot 79 13. @ Block D, Lot 14. @ Block D, Lot 1 15. @ Block D, Lot 8 16. @ Block D, Lot 8 17. @ Block D, Lot 14 18. @ Block D, Lot 14 19. @ Block D, Lot 19 20. @ Block D, Lot 19 21. @ Block E, Lot 1 22. @ Block E, Lot 1 23. @ Block E, Lot 5 24. @ Block E, Lot 5 25. @ Block E, Lot 7 26. @ Block E, Lot 7 27. @ Block E, Lot 10 28. @ Block E, Lot 10 29. @ Block E, Lot 11 30. @ Block E, Lot 11 31. @ Block E, Lot 14 32. @ Block E, Lot 14 33. @ Block F, Lot 9 34. @ Block F, Lot 9 35. @ Block F, Lot 12 36. @ Block F, Lot 12 3rd Lift 1 2nd Lift 1 3rd Lift 1 2nd Lift 1 3rd Lift 1 2nd Lift 1 3rd Lift 1 2nd Lift 1 3rd Lift 1 2nd Lift 1 3rd Lift 1 2nd Lift 1 3rd Lift 1 2nd Lift 1 3rd Lift 1 2nd Lift 1 3rd Lift 1 2nd Lift 1 3rd Lift 1 2nd Lift 1 3rd Lift 1 2nd Lift 1 3rd Lift 1 2nd Lift 1 3rd Lift 1 2nd Lift 1 3rd Lift 1 2nd Lift 1 3rd Lift 1 2nd Lift 1 3rd Lift 1 3rd Lift 1 3rd Lift 1 2nd Lift 1 3rd lift 1 2nd Lift i WATER DRY PER- CONT. D~N CENT (%) (PCF) COMP 18.3 104.1 99.5 18.9 103.6 99.0 21.0 101.9 97.4 20.7 102.8 98.3 21.4 102.3 97.8 20.9 101.4 96.9 19.4 103.8 99.2 18.5 104.3 99.7 20.4 103.0 98.5 19.3 103.6 99.0 18.4 104.3 99.7 19.1 104.1 99.5 21.2 103.9 99.3 21.4 101.5 97.0 20.7 101.4 96.9 21.3 102.1 97.6 19.1 101.9 97.4 19.9 102.3 97.8 18.6 102.9 98.4 20.3 102.3 97.8 19.3 101.5 97.0 19.1 100.3 95.9 19.2 103.1 98.6 19.6 102.8 98.3 17.8 104.3 99.7 17.9 104.2 99.6 20.4 103.6 99.0 19.3 103.8 99.2 19.8 103.6 99.0 20.6 101.9 97.4 21.0 101.0 96.6 18.0 104.1 99.5 19.4 103..5 98.9 17.9 104.3 99.7 18.9 103.9 99.3 18.3 103.8 99.2 (continued on next page) PAGE 2 JOB #: 94-1200 DATE: 04-03-95 WATER DRY PER- TEBT PRO~TOR COHT. DBH CEHT NO. LOCATION AND LIFT NUMBER (%) (PCF) COHP Water Service: 37. @ Block A, Lot 64 38. @ Block A, Lot 68 39. @ Block A, Lot 72 40. @ Block A, Lot 76 41. @ Block A, Lot 7~ 42. @ Block D, Lot 1 43. @ Block D, Lot 4 44. @ Block D, Lot 8 45. @ Block D, Lot 16 46. @ Block E, Lot 1 3rd Lift i 20.3 102.9 98.4 3rd Lift 1 21.6 101.3 96.8 3rd Lift I 21.3 102.6 98.1 3rd Lift 1 18.4 104.2 99.6 3rd Lift 1 17.9 104.5 99.9 3Fd Lift 1 21.8 102.5 98.0 3rd Lift 1 18.4 102.8 98.3 3rd Lift 1 21.2 103.6 99.0 3rd Lift 1 18.8 103.1 98.6 3rd Lift 1 19.0 103.2 98.7 REMARKS: All tests passed. Minimum Compaction Required: 95% PROCTORH: 1. Brown & Tan Sandy Clay 104.6 PCF @ 17.6% MOISTURE Chris Quentin Technician