Loading...
Villages of CC 6-LR 950324"ExceLLence by Experience,, SouChLake, Texas 760~2 C~N,~ULTZNG ENGINEERS Enviror=entaL Assessmonts SoiLs & Foundations Construction Hateria[s Testing Co...ercia[ & Industrial Inspection (817) 329-0281 FIELD COMPACTION REPORT PROJECT: Enclave on the Parkway LOCATION: Coppell JOB #: 95-1340 DATE: 03-24-95 DAY: Friday TIME: 11:00am CLIENT: Wilbow Peck Corporation CONTRACTOR: Site Concrete WATER DRY PElt- TEST PROCTOR CONT. DEN CENT NO. LOCATION AND LIFT NUMBER (%) (PCF) COMP Block A: 1. @ Lot 14 2nd Lift 1 18.4 105.7 98.1 2. @ Lot 15 2nd Lift i 16.1 104.8 97.4 3. @ Lot 16 2nd Lift i 15.4 105.6 98.2 4. @ Lot 17 2nd Lift i 15.5 106.1 98.6 5. @ Lot 18 2nd Lift I 16.7 104.1 96.8 6. @ Lot 19 2nd Lift i 14.8 105.2 97.8 7. @ Lot 20 2nd Lift I 14.7 104.8 97.7 8. @ Lot 21 2nd Lift i 15.7 104.3 97.0 RRMARKH: All tests passed. Minimum Compaction Required: 95% PROCTORS: 1. Tan & Brown Sandy Clay 107.5 PCF @ 16.6% MOISTURE Patrick Corbett Technician ,,ExceLLence by Experience" PO Box 92548 · Southtake, Texas 76092 C~ULTING ENGINEERS IN: Envi romenta[ Assesseents Soils & Foundations Construction #ateria[s Testing Commercial & lndustrJat Inspection (817) 3~-0281 FIELD COMPACTION REPORT PROJECT: Enclave on the Parkway LOCATION: Coppell JOB ~: 95-1340 DATE: 03-24-95 DAY: Friday TIME: 11:00am CLIENT: Wilbow Peck Corporation CONTRACTOR: Site Concrete WATER DRY ~ER- TE~T PROCTOR CONT. DEN CENT NO. LOCATION AND LIFT NUMBER (%) (PCF) COMP Block A: 1. @ Lot 14 2nd Lift i 18.4 105.7 98.1 2. @ Lot 15 2nd Lift i 16.1 104.8 97.4 3. @ Lot 16 2nd Lift i 15.4 105.6 98.2 4. @ Lot 17 2nd Lift i 15.5 106.1 98.6 5. @ Lot 18 2nd Lift i 16.7 104.1 96.8 6. @ Lot 19 2nd Lift i 14.8 105.2 97.8 7. @ Lot 20 2nd Lift i 14.7 104.8 97.7 8. @ Lot 21 2nd Lift i 15.7 104.3 97.0 RBMARKB: All tests passed. Minimum Compaction Required: 95% PR0~TORS: 1. Tan & Brown Sandy Clay 107.5 PCF @ 16.6% MOISTURE Patrick Corbett Technician