FIELD COMPACTION REPORT
PROJECT: Enclave on the Parkway
JOB #: 95-1340 DATE: 03-23-95
CLIENT: Wilbow Peck Corporation
TEBT
NO.
LOCATIONAND LIFT
LOCATION: Coppell
DAY: Wednesday TIME: 2:30pm
CONTRACTOR: Site Concrete
~rATER DRY PER-
PROCTOR CONT. DEN CENT
NUMBER ( % ) (PCF) CO~P
mm mm mmmmmm! ! ! mm! m mmm ! ! mmmmm! m
1. Northeast Corner
2. 100' SW of Test #1
3. 100, SE of Test #2
4. 150' S of Test #2
5. 50' S of Test #3
1st Lift I 18.9 105.1 97.7
1st Lift i 17.3 104.3 97.0
1st Lift I 19.3 104.1 96.8
1st Lift 1 17.9 106.2 98.7
1st Lift i 19.5 104.9 97.5
REHARKB:
All tests passed.
Minimum Compaction Required:
PROCTORS:
1. Tan & Brown Sandy Clay
95%
107.5 PCF @ 16.6% MOISTURE
Jeff Holden
Technician