Loading...
Town Center L4B1-LR011009 ALPHA TESTING, INC. 2209 Wisconsin St,, Suite 100 Dallas, Texas 75229 972/620-8911- 972/263-4937 (Metro) · DALLY FIELD REPORT FAX: 972/406-8023 TESTED FOR: CONSTRUCTION MANAGEMENT GROUP DATE: 10/09/01 DALLAS, TEXAS PROJECT: COPPELL TOWN CENTER OUR REPORT NO: 01612-27 COPPELL, TEXAS TECHNICIAN: O.A. WEATHER: PARTLY CLOUDY TEMPERATURE RANGE: 70 TO 80 THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED SITE TO MONITOR ON-GOING WORK AND PERFORM FIELD TESTING AS REQUESTED. THE FOLLOWING ITEMS WERE OBSERVED FOR STRUCTURAL STEEL THAT HAD BEEN INSTALLED IN THE FOLLOWING GENERAL AREA: FRAMING FOR ENTIRE BUILDING - TECHNICIAN OBSERVED BOLTED CONNECTIONS INCLUDING ANCHOR BOLTS FOR PROPER BOLT SIZE, QUANTITY, AND TIGHTNESS. CROSS BRACING WAS CHECKED FOR PROPER LOCATION AND INSTALLTION. THE FOLLOWING DEFICIENCIES WERE NOTED DURING THE OBSERVATION: ALL ANCHOR BOLTS AND FRAMING BOLTS WERE NOT PROPERLY TIGHTENED AND NEED TO BE CHECKED AGAIN. CROSS BRACING ALONG LINE 2 AND 5.1 FROM LINE E.2 TO D.6 WAS NOT ERECTED. CROSS BRACING ALONG LINE A FROM LINE 3 TO 4 WAS NOT ERECTED. LARRY WAS INFORMED OF ALL OBSERVATIONS AND FIELD TEST RESULTS. AT THE COMPLETION OF THE SCHEDULED TESTING, THE TECHNICIAN RETURNED TO THE DALLAS OFFICE. CC: LARRY DAVES, CITY OF COPPELL LEE STONE, CITY OF COPPELL ~ ~ ~ ~ ~po~ ~ ~o~ ~® ~ve ~ ~ ~ ~ian! ~an~ th~ ~ ~i~ian~$ on ffi® in ~ offi¢~ an~ ~~~ ~d/~ ~ ®~ ~th ~ ~ ~ s tested and/or observed, ALPHA. The use of our name and test results must receive our written approval. Test results and repons apply only to the sample and are not indicative of the qualifies of apparently identical or similar specimens. Geotechnical Engineering ~7~onstroction Materials Tosting ~l~nvironmental Engineering l~Tl~onsulting