ST9601-LR 990506 TEAM CONSULTANTS, INC.
2970 S. Walton Walker, Suite 101 Dallas, Texas 75211
214/331-4395
CONCRETE PLACEMENT REPORT
Mr. Robert Caudill
Tiseo Paving DATE: 05/06/1999 JOB TITLE: Wrangler Drive
P O Box 270040 REPORT NO: 60 Coppell, Texas
Dallas, TX 75227 JOB NO: 985142
DESIGN USED: Lattimore, 4000 psi START UP TIME: 3:40
SAMPLING METHOD: ASTM-C172
ASTM C-31
BEAM ASTM ASTM TEMPERATURE
TIME TIME OR CYL. TRUCK TICKET WATER CUBIC C143 C231 (F°)
BATCHED MADE SET NOS. LOCATION NO. NO. ADDED YARDS SLUMP % AIR AMB/CONC REMARKS
3:21 3:30 44 A-D Inlet on comer of Wrangler 141 70369 0 7.00 3.00 4.0 -- 86
and Crestside
REMARKS: The concrete scheduled for 2:00 did not arrive until 3:30
Time Off: 5:30 ' '
Tech. Time: 4.0 hrs. SIGNED: -\ /
Trip Charge: 1 Travis Beasley, Techn~
T ' "
ke
cc: City of Coppell J