Loading...
Valley R Plaza P1-CS 881107 .' -- '/ /' ',"-') ' -'. , '-- / ~i _::2 , ..' · ~ P.O. Box 478 · . .,, .,', -. .... ;.:-.~ ._~_~ ...... ,~- - ~-:-:. Coppell, Texas 75019 /"':' '"':" L"'~ ''') "'~' ? Tho City With A Beautiful Future 214-462-0022 ,.. November 7, 1988 Kenneth Smith KL Smith Companies, Inc. P. O. Box 376 Johnston, IA 50131. liE: Valley Ranch / Goodyear Dear Hr. Smith: '~ have received and read your letter dated 11/3/88. ':he reason the construction was shut down recently was due to improper insta'i]ation of the subgrade and Pace Co.'s unwillingness to comply wiLh qoppell's standard specifications. Since Building Inspections iss~ed you the building permit, they would issue Pace a stop work or,let through my direction. ! :.~,,l~:,'stand that this situation has caused a.lot of confusion and i~:;i, raLion. To clairfy my position, I have no problem with the :ons[-~:uction of the Goodyear building, however, I do have a problem wi~i, ~l~e connection of utilities and paving on an unaccepted site, wi~l,,',u[ the proper phasing and agreements between the Developer and tl~e City of Coppell. The confusion I was having was as Dunning was drafting agreements and phasing schedules. Pace's was trying to make up construction in my area of jurisdiction that had not been accepted nor was I notified of their intent, nor was I even asked about specifications. When I questioned your Project Manager on what was done and how it was going to be accomplished, some uncertainties were cast upon my abilities. At that time I felt it necessary to depart from the path we were on, halt everything, e~rnept work on the building itself and get Dunning and myself's ~ii'uation sorted out. As ~f to date, Dunning is submitting the agreements and phasing schedule ~ have requested and I anticipate by the time you receive th~s letter, this situation will be resolved to the City's satisfaction. date, I have not received the data nor the test results Fequested and I have not spoken with the Contractor installing :.~,b:~Fade. Your situation (RE: Paving) will be resolved as soon r~ce~ve the items requested. closfng, I hope th~s letter clarified the situation and my position. noL and was not trying to use your company for leverage or put t-_he middle, but quite the contrary. I was trying to deal i.~unnin.~'s, agreement, while trying to work with your company ;'~t~:~Lrt.'ct~;n of ~'he Coodyear building separately. · .:i.]./ cont.inue to work with you and Dunning in every way possible. you have any questions, please feel free to contact me at (2_l. 4) - ~ ~ 9 5. cc- %l'eve Curare, Director of Public Works