November 7, 1988
Kenneth Smith
KL Smith Companies, Inc.
P. O. Box 376
Johnston, IA 50131.
liE: Valley Ranch / Goodyear
Dear Hr. Smith:
'~ have received and read your letter dated 11/3/88.
':he reason the construction was shut down recently was due to improper
insta'i]ation of the subgrade and Pace Co.'s unwillingness to comply
wiLh qoppell's standard specifications. Since Building Inspections
iss~ed you the building permit, they would issue Pace a stop work
or,let through my direction.
! :.~,,l~:,'stand that this situation has caused a.lot of confusion and
i~:;i, raLion. To clairfy my position, I have no problem with the
:ons[-~:uction of the Goodyear building, however, I do have a problem
wi~i, ~l~e connection of utilities and paving on an unaccepted site,
wi~l,,',u[ the proper phasing and agreements between the Developer and
tl~e City of Coppell. The confusion I was having was as Dunning was
drafting agreements and phasing schedules. Pace's was trying to
make up construction in my area of jurisdiction that had not been
accepted nor was I notified of their intent, nor was I even asked
about specifications. When I questioned your Project Manager on
what was done and how it was going to be accomplished, some
uncertainties were cast upon my abilities. At that time I felt
it necessary to depart from the path we were on, halt everything,
e~rnept work on the building itself and get Dunning and myself's
~ii'uation sorted out.
As ~f to date, Dunning is submitting the agreements and phasing
schedule ~ have requested and I anticipate by the time you receive
th~s letter, this situation will be resolved to the City's
satisfaction.
date, I have not received the data nor the test results
Fequested and I have not spoken with the Contractor installing
:.~,b:~Fade. Your situation (RE: Paving) will be resolved as soon
r~ce~ve the items requested.
closfng, I hope th~s letter clarified the situation and my position.
noL and was not trying to use your company for leverage or put
t-_he middle, but quite the contrary. I was trying to deal
i.~unnin.~'s, agreement, while trying to work with your company
;'~t~:~Lrt.'ct~;n of ~'he Coodyear building separately.
· .:i.]./ cont.inue to work with you and Dunning in every way possible.
you have any questions, please feel free to contact me at (2_l. 4)
- ~ ~ 9 5.
cc- %l'eve Curare, Director of Public Works