Loading...
Valley R Plaza P1-CS 881025 . - .i~' Z::~ ~~~-~ P.O. Box 478 ~ /~ j Coppell, Texas75019 (. ;.'/ ~ ..... ~, The City With A Beautiful Future 214- 462-0022 October 25, 1988 Dunning Development Corp. Randall K. Gonzalez 7001 Preston Rd. Suite 500 LB 26 Dallas, Texas 75205 RE: Valley Ranch Plaza / Pads B through Dear Mr. Gonzalez: After meeting with you several times on site, I feel the easiest way to straighten this situation out will be for me to provide you with a list of items that will have to be completed and verified for a city acceptance of utilities only. They are as follows: 1) All valves stack will be put to their finish grade and a 2' x 2' concrete pad installed. 2) Ail meter cans to be installed and adjusted to grade. 3) Water line "WC" will be installed with all fire hydrants, valves and meter vaults. 4) Storm sewer lines "DA" and "DB" to be cleaned and installed. 5) Ail inlets to be installed to grade with tops and throats. 6) A conceptual plan for phasing paving, ie. fire lanes. 7) Remove 2" service line for Pad H and retap connection on line "WD". 8) Ail sanitary se%~er clean out to be set at finish grade and cast iron installed with concrete Pads. 9) All fire hydrants to be painted with appropriate color code. 10) One (1) year maintenance bond. 11) As Built Drawings - Two (2) set of mylars and two (2) sets of blue lines marker "As Builts". 12) Completion of a formal city walk thru and completion of any and all punch list items. As soon as Pace Co. (Goodyear) completes their foundation, no other work shall be done on pads B through I of the Valley Ranch Plaza, until an agreement can be made for the completion of all the above mentioned deficient items. Thank you, Steven-M%~Morton 'Chief Developmental Inspector SMM/bb cc: S/eve Goram, Director of Public Works ~ace Development Co.