Loading...
ST9601-LR 990322 TEAM CONSULTANTS, INC. 2970 S. Walton Walker, Suite 101 Dallas, Texas 75211 214/331-4395 CONCRETE PLACEMENT REPORT Mr. Robert Caudill Tiseo Paving DATE: 03/22/1999 JOB TITLE: Wrangler Drive P O Box 270040 REPORT NO: 53 Coppell, Texas Dallas, TX 75227 JOB NO: 985142 DESIGN USED: Tiseo Paving START UP TIME: 3:00 SAMPLING METHOD: ASTM-C172 ASTM C-31 BEAM ASTM ASTM TEMPERATURE TIME TIME OR CYL. TRUCK TICKET WATER CUBIC C143 C231 (17o) BATCHED UNLOADED SET NOS. LOCATION NO. NO. ADDED YARDS SLUMP % MR AMB/CONC REMARKS -- 4:30 41 A-D Sta 37+14.50, Inlet ........ 1 3.0 -- 80 REMARKS: Time On: 2:00 Time Off: 5:00 ~-'t Tech. Time: 3.0 hrs. SIGNED: Trip Charge: 1 Ken Hayner, TecYmi.cian ke cc: City of Coppell