Verizon-LR 990226CO Cm T
COMP $1VE STRENGTH TES x
8901 Carpenter FFwy., Suite #100
Ddbs, Tens 7S247
Date of Service:
Client No.:
Client:
Services:
01/28/1999
The Beck Group
Attn: Oillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Report Date
Report No.: 9903453 02/26/1999
Project No.: 43-2333-98
Project: GTE Shared Services- --
Coppell Road & Corporate Drive
Coppell. Texas
Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
co~crom BECK
CONCRETES~PLmm TXI
p~rr: 41
S~C~ON
~NG~: ~ psi ~ 28 Days
sc~: 6.0" M~
~ N/A
~ ~o~ AS~ C-143
AS~ C- 172
AS~ C-39
PROJECT DATA
CONC~rr~ ~: 9508
pL~~ DAT~: 01/2811999 BATCll TIM~: h06pm
Tib~SAbiPLF, D: h45pm BY: MikeOdom
WEATHER CONDITIONS:
~UCKNO: 459
AmCO~-AVr (~): N/A
Cloudy
72 r cot~cRE'r~: 75 r
Ticl~r l~: 1227852
u~rr w~m~rr (pcO.'. NIA
IR.kCEMEHT LOCATION:
Building !, L~vei I. p~fio r~iuins walls west to mouth
SAMPLE LOCATION:
See below
SET NO. (thebes)
I I 5.75
I 2 5.75
I 3 5.75
I 4 5.75
I 5 5.75
Sample location: West side
Technician: Mike Odom
Report Distribution:
(l) The Beck Group
(I) Oromatzky Dupree & Assoc.
(I) Brockette Davis Drake, inc.
(I) The Beck Group
0ILL
REPORT OF TESTS
DATE AGE LOAD
T~STKD (days) Obs. force)
02/04/1999 7 101770
02/0411999 7 103610
Average
02/2511999 28 163290
02/25/1999 28 169330
Average
03/2511999 56
ACCUMUI. ATIV~ YARDS:
COMPRESSIVE
STRENGTH
36OO
3660
5770
5990
3O
FRACTURE
TYPE
wall, 20' south from north end.
SUfled: h3Opm
(I) The Beck Group
(I) Dalcan, inc.
Fiuished: 4:30pm
I'~ En~~ll~g, Inc.
Eugene Harbour
Vice President
This re[xxt is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page I of I
( ON RETE COMPRE " IVE STRENGTH
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
Date of Service: 01/2811999 Report No.: 9903452 02/26/1999
Client No.: 08644025 Project No.: 43-2333-98
Client:
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Project: GTE Shared Services '--
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
COtCr~CTOR: BECK..
coNcagr~ s~nn,mR: TXI
Si~CWICATION RgQUIREMENTS
s'r~NCTH: 5000 psi @ 28 Days
SLtrSn': 6.0" Max
AIR: NIA
T~..vr MKmOD: ASTM C-143
ASTM C-172
ASTM C-39
PROJECT DATA
CONCRKr~. CLASS: 8208
t,~,c~vt~vr OA~: 01/28/1999 BATCH TIM~: 6:47am
TIME SAMPLED: 7:15am BY: Mike Odom
WEATI~R CONDrrlONS:
TEMPERATUR~ (V). AIR
TRUCK NO: 457
Am cot~rr (~): N/A
PLACEMENT LOCATION:
Cloudy
61 v coNcn~r~: 72 F
TICr~'r ~o: 1227414
uNrr w~ai~' (~:. N/A
Building slab L~vcl V ($B) 5.7-B, A-D & E-H
SAMIq~ LOCATION:
Beam along midway line
REPORT OF TESTS ACCUM W YARDS: 530
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH
SET NO. (incl.) TESTED (days) (H~. force) (pM)
I I 5.75 01/3111999 3 107110 3790
I 2 5.75 02/0411999 7 130570 4620
1 3 5.75 02/0411999 7 134800 4770
Average 4700
I 4 5.75 02/2511999 28 183850 6500
1 5 5.75 02/2511999 28 176400 6240
AVerage 6370
I 6 5.75 03/25/1999 56
o ILL
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page I of 8
I
CONCRETE COMPRESSIVE STRENGTH TEST'
8901 Carpent~ Frwy., Suite #100
Date of Service: 01/28/1999
Client No.: 08644025
Client: The Beck Oroup
Atto: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Report No.:
Project No.:
Project:
9903452 Report Date
02/2611999
43-2333-98
GTE Shared Services'--
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
co~rraAcrOa: BECK COnCamUg Cra, SS: 8208
CONC~ SUPPLm~ ~I P~C~ On~: 01~8/1999 BATCH ~: 7:55am
p~: 41 ~ SA~L~: 8:55am BY: Mike Odom
SeECmtCn~ON ~u~~ ~n~co~moNs: Cloudy
S~NO~: 5~ psi ~ 28 Days ~~ ~ ' AIR 63 F CONCh: 76 V
SC~: 6.0" Max ~uc~o: 462 ~c~ ~o: 1227529
AIR: N/A Am CO~ (%): N/A UN~ wz~o~ (~0r N/A
P~C~ ~A~ON:
~ M~Om ASTM C-143 ~ ~se ~
AS~ C-172
AS~ C-39
SAMPLE LOCATION:
Along Line C & 6.5
REPORT OF TESTS ACCUMUt. A'nv~ YARDS: 530
cvL~vo~ M~Smm M~OUSm~ coMP~ssvn~
MARKED SLUMP DATE AGE LOAD STRENGTH
SET NO. (inches) TESTED (days) (lbs. force) (psi)
2 I 5.25 01/3111999 3 106530 3770
2 2 5.25 02/0411999 7 126470 4470
2 3 5.25 02/04/1999 7 130610 4620
Average 4550
2 4 5.25 02/2511999 28 166350 5880
2 5 5.25 02/2511999 28 173180 6120
Average 6000
2 6 5.25 03/2511999 56
o11.1.
This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc.
Page 2 of 8
Rep0.rt'No.: 9903452
Ten (10) ~allons of water added.
This t~po~t is exclusively for the usc of the client indicated above and shall not be repro4uced except in full without thc written approval of HBC Engineering, Inc.
OILL Page 3 of 8
#
CONCRETE COMPRE }IVE STRENGTH TES?
$901 Carp~nt~ Frwy., Suite #100
Dallas, Tex~s 75247
Report Date
Date of Service: 0112811999 Report No.: 9903452 02/26/1999
Client No.: 08644025 Project No.: 43-2333-98
Client: The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Project: GTE Shared Services*'--
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
co~rraA~: BECK
CONC~SV~L~R: TXI
PLANT: 41
SPECt~C~TIOtq REQUmEMEr~S
S~~: 5~ psi ~ 28 Days
SL~: 6.0" Max
A~ N/A
~ ~o~ ASTM C-
AS~ C-1~2
AS~ C-39
SAMPLE LOCATION: Along K & 9.3
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
3 1 5.75 01/31/1999
PROJECT DATA
CONCn~-'r~ crass: 8208
PLACEMENT DATE: 01/28/1999 BATCH TIME: 8:41am
TnVmSAMPLP~: 9:55am aY: Mike Odom
WEATIiER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 360
Am CONTENT (~): N/A
PLAC~ LOCATION:
See page I
Cloudy
65 v CONCRE'r~: 73 v
TIC~CETNO: 1227584
uNrr WEIGHT (pc~.~ N/A
REPORT OF TESTS accumuLatE YARDS: 530
MAXIMUM COMPRK~IVE
AGE LOAD STRENGTH FRACTURE
(days) Ilb~ force) (psi) TYPE
3 90130 3190
3 2 5.75 02/04/1999 7 120460 4260
3 3 5.75 02/04/1999 7 118460 4190
Average 4230
3 4 5.75 02/2511999 28 141040 4990
3 5 5.75 0212511999 28 143040 5060
Average 5030
3 6 5.75 03/25/1999 56
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without th~ written approval of HBC Engineering, Inc.
0ILL Page 4 of 8
Twenty (20) gallons of water added.
OILL
This report is exclusively for the use of the client ifldicaled above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 5of 8
CONCRETE COMPRESSIVE STRENGTH TEST
Date of Service:
Client No.:
Client:
I I
01/28/1999
08644025
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Report No.:
Project No.:
Project:
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
9903452 Report Date
02/26/1999
43-2333-98
GTE Shared Services'-..
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples Of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
cotqrRACTOm BECK
cot~cazTE soevcmm TXI
PLANT: 41
Sev. Cn~ICATION REQUmZMZm'S
s'n~cTm 5000 psi @ 28 Days
SLtnV~: 6.0" Max
AIR: N/A
TEST M~'rtIOD: ASTM C- 143
ASTM C-172
ASTM C-39
SAMPLE LOCATION:
Along G & 11.5
PROJECT DATA
CONCRE'rz Ct,,~: 8208
PLACEMEI~ DATE: 01/28/1999 BATCH TIME: 9:39am
~ SAM~t~D: 10:45am BY: Mike Odom
W~THER coto)rrlON$: Cloudy
TEMPERATURE (F). Am 66 F CONCRETE: 73 F
TRUCKNO: 414 TICKer NO: 1227664
Am co~rE~rr (%): N/A u~rr WEIGHT (pcf): N/A
PLACEMENT LOCATION:
Sec page 1
REPORT OF TESTS ACCUMULATIVE YARDS: 530
CYLe~DZR ~.SSUl~V m, ram~ co~wREssn'~
MARKED SL~ DA~ AGE ~AD S~G~ ~~
S~ NO. (~) ~D (~n) (1~ f~) (~) ~E
4 I 6.~ 01/30/19~ 2 65~0 23~
4 2 6.00 02/04/1999 7 118460 4190
4 3 6.00 02/04/1999 7 124150 4390
Average 4290
4 4 6.00 02/25/1999 28 171020 6050
4 5 6.00 02/2511999 28 164240 5810
Average 5930
4 6 6.00 03/25/1999 56
0ILL
This report is exclusively for thc use of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 6 of 8
I
Twenty (20) gallons of water added.
This report is exclusively for the us~ of the client indicated above and shall not be reproduced except in full without the written approval ~f HBC Engineering, Inc.
OILI. Page 7 of 8
CONCRETE COMPRESSIVE STRENGTH TESi'
Date of Service:
Client No.:
01/28/1999
08644025
Report No.: 9903452
Project No.: 43-2333-98
8901 Carpenter Frwy., Sult~ #100
~ Texas 75247
Report Date
02/26/1999
Client:
The Beck Group
Atto: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Project: GTE Shared Services-..
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
co~rn~ca~m BECK
CONC~-'r~sum. mm TXI
~,r: 41
SI~CfflCATION REQUIREbiEIVrS
ST~Y~aTIt: 5000 psi @ 28 Days
SLUM~: 6.0" Max
A,R: N/A
METHOD: ASTM C-143
ASTM C-172
ASTM C-39
SAMPLE LOCATION:
F_.5 & 11.5
PROJECT DATA
CONCP_gTE CLASS: 8208 ·
PLACEMENT DATE: 01/2811999 BATCH TaV~: 11:12am
XnVmSAM~,.ZO: 12:15pm BY: Mike Odom
Cloudy
69 F co~cRE'ng: 76 F
TICKET~O: 1227767
vtvrr w~la~rr (pc0: N/A
CYLINDER MEASURED
MARKED SLUMP
SET NO. (incha)
5 I 5.50
REPORT OF TESTS
DATE AGE LOAD
TESTED (days) (lbs. force)
01/30/1999 2 69150
ACCUMULATIVE YARDS: 520
COMPRESSIVE
S~GTIt FRACTURE
(psi) TYPE
245O
5 2 5.50
5 3 5.50
5 4 5.50
5 5 5.50
5 6 5.50
02/04/1999 7 122860
02/04/1999 7 126720
Average
02/25/1999 28 183710
02/2511999 28 183470
Average
03/2511999 56
4340
448O
4410
6500
6490
650O
Technician: Mike Odom
RepoFt Distribution:
(i) Tbe Bw.k Group
(!) GromaUky Duple &
(!) Brockette Davi~ Drake, Inc.
(!) The Beck Group
Started: 6:00am
(,) Thc 8cck ~roop
(I) {)alcan, Inc.
Finished: l:30pm
H~ Engi~g, Inc.
Eugene Harbour
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0iLL Page 8 of 8
CONCRETE COMPRESSIVE STRENGTH TEST'
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service:
Client No.:
Client:
12/31/1998
08644025
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Report No.: 9834157
Report Date
02/26/1999
Project No.: 43-2333-98
Project:
GTE Shared Services
Coppell Road & Corporate Drive
Coppeil, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TX1
PLANT:
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
SLUMP: 6.0" Max
AIR: 3-6%
TEST METHOD: AS'[M C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 8205
PLACEMENT DATE: 12/31/1998 BATCH TIME: 4:08pm
TIME SAMPLED: 4:45pm DY: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
'rgUCKNO: 834
AIR CONTENT (%}: 6.0
Fair
37 F CONCRETE: 61 F
TICKET NO: 1205300
UNIT WEIGHT (pef~: N/A
PLACEMENT LOCATION:
South 1/2 bay 4 & 5 paving quadrant, slab-on-grade of main entrance (Left) drive near Bay
I &Bay3
SAMPLE LOCATION:
Bay 5 centerline between islands
REPORT OF TESTS ACCUMULATIVE YARDS: 530
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
I ! 5.75 01/07/1999 7 72340 2560
1 2 5.75 0 i/07/1999 7 75080 2650
Average 2610
I 3 5.75 01/28/1999 28 131940 4670
1 4 5.75 01/28/1999 28 135770 4800
Average 4740
! 5 5.75 02/25/1999 56 166780 5900
0ILL
This report is exclusively fi)r the usc of thc client iodicated above and shall qot be reproduced except iq full without thc written approval of HBC Engineering, Inc.
Page I of 5
( ONCRETE COMPRE ' IVE STRENGTH TES ?
Date of Service: 12/31/1998 Report No.: 9834157
Client No.: 08644025 Project No.: 43-2333-98
ENGINEEEII~,
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
02/26/I999
Client:
The Beck Group
ARm Oilier Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-46 ! 9
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: BECK . CONCRETE CLASS: 8205
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 12/31/1998 BATCH TIME: 5:32am
PLANT: 41 TIME SAMPLED: 5:55am BY: Mike Odom
SPECIFICATION REQUIREMENTS WEATHER CoNDrrIONS: Fair
STRENGTH: 4000 psi (~ 28 Days TEMPERATURE (lr) -AIR 36 l: CONCRETE: 62 F
SLUMP: 6.0" Max TRUCKNO: 837 TICKET NO: 1205384
AIR: 3-6% AIR coNTvawr (%): 4.6 UNIT WEIGHT (pcl).: N/A
TEST METHOD: ASTM C- 143 PLACEMENT LOCATION:
.cee page 1
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: S'~ below
REPORT OF TESTS ACCUMULATIVE YARDS: 530
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH
SET NO. (inches) 'rESTED (days) (lbs. force) (psi)
2 I 6.25 01/07/1999 7 76620 2710
2 2 6.25 01/07/1999 7 82720 2930
Average 2820
2 3 6.25 01/28/1999 28 135410 4790
2 4 6.25 01/28/1999 28 140910 4980
Average 4890
2 5 6.25 02/25/1999 56 155060 5480
FRACTURE
TYPE
Sample location: Bay 4, 20' south at centerline from bay 4 islands.
This report is exclusively for tt,: use of thc client indicated above and shall not be reproduced except in lull without the written approval of I-IBC Engineering, Inc.
0iLL Page 2 of 5
oNCRETE TES ?
COMPREbSlVE STRENGTH
Date of Service:
Client No.:
Client:
12/31/1998 Report No.: 9834157
08644025 Project No.: 43-2333-98
The Beck Group
Attn: Oilier Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
02/26/1999
Project:
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
SLUMP: 6.0" Max
AIR: 3-6%
TEST ME'mOD: ASTM C- ! 43
ASTM C- 172
ASTM C-39
SAMPLE LOCATION:
See below
PROJECT DATA
CONCRETE CLASS: 8205
PLACEMENT OA'r~: 12/31/1998 BATCH TIME: 6:31 am
TtMESAMPLED: 7:10am BY: Mike Odom
WFATHER CONDITIONS:
TEMPERATURE (Ir). AIR
TRUCK NO: 807
AIR CONTENT (%): 4.9
PLACEMENT LOCATION:
See page I
Fair
36 F CONCRETE: 60
TlCRXT NO: 1205466
UNIT WEIGItT (pc0.: N/A
REPORT OF TESTS ACCUMULATIVE YARDS: 530
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AG E LOAD STRENGTH
SET NO. (inches) TESTED (days) (lbs. force) (psi)
3 I 6.00 01/07/1999 7 68590 2430
3 2 6.00 01/07/1999 7 76610 2710
Average 2570
3 3 6.00 01/28/1999 28 131730 4660
3 .4 6.00 01/28/1999 28 144740 5120
Average 4890
3 5 6.00 02/25/1999 56 175270 6200
FRACTURE
TYPE
Sample location: Bay 5, west centerline, 30' north of (N) fire lane centerline.
This ri:pon is exclusively lbr thc usc of thc client indicated above and shall not bc reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page3 of 5
Date of Service:
Client No.:
Client:
12/31/1998 Report No.: 9834157
08644025
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Project No.: 43-2333-98
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
02/26/1999
Project:
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field .test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: BECK CONCR~rE Ct~SS: 8205
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 12/31/1998 BATCH TIME: 7:45am
PLANT: 41 TIME SAMPLED: 8:45am BY: Mike Odom
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Fair
STRENGTH: 4000 psi ~ 28 Days TEMPERATURE(Fi-AIR 43 ~: CONCRETE: 58
SLUMP: 6.0" Max TRUC~CNO: 461 TICKET NO: 1205588
AIR: 3-6% AIR CONTENT (%): 4.8 UNIT WEIGHT (pc0: N/A
TF. ST METHOD: ASTM C- ! 43 PLACEMENT LOCATION:
Sec page 1
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: Main entrance (left) driveway
REPORT OF TESTS ACCUMULATIVE YARDS: 530
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH
SET NO. (inches) TESTED (days) (lbs. force) (psi)
4 I 6.50 01/07/1999 7 79020 2790
4 2 6.50 01/07/1999 7 74380 2630
Average 2710
4 3 6.50 01/28/1999 28 126620 4480
4 4 6.50 01/28/1999 28 116750 4130
Average 4310
4 5 6.50 02/25/1999 56 151420 5350
FRACTURE
TYPE
Note: Slump was taken at hopper.
011.L
This report is exclusively lbr the use of thc client indicated above and shall not be reproduced except in tull without the written approval of HBC Engineering, Inc.
P:,ge 4 of 5
( oNCRETE COMPRE ' IVE
STRENGTH TES' t '
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service:
Client No.:
12/31/1998
08644025
Report No.: 9834157
Project No.: 43-2333-98
Report Date
02/26/1999
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACrOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
STRKNGTlt: 4000 psi ~ 28 Days
SLUMP: 6.0" Max
Am: 3-6%
~ Mm~OD: AS'IM C- ! 43
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRET~ CU~SS: 8205
PLACEMENT DATE: 12/31/1998 BATCH TIME: 9:49am
TIME SAMPLED: 10:35am BY: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 462
AIR CONTENT (%): 4.5
PLACEMENT LOCATION:
See page !
Fair
45 r CONCR~rE: 58
TIC~Lk-r NO: 1205854
UNIT WEIGHT (pc0:
SAMPLE LOCATION: Sec beloxv
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inches)
5 I 6.50
5 2 6.50
5 3 6.50
5 4 6.50
5 5 6.50
REPORT OF TESTS
MAXIMUM
DATE AGE LOAD
TESTED (days) (lbs. force)
01/07/1999 7 81250
01/07/1999 7 87910
Average
01/28/1999 28 i 69070
0 !/28/1999 28 i 62550
Average
02/25/1999 56 178590
ACCUMULATIVE YARDS: 560
COMPRESSIVE
STRENGTH
(psi)
2870
3110
2990
5980
5750
5870
6320
FRACTURE
TYPE
Sample location: 40' (W) from (E) edge (N) driveway, centerline bay 6.
Technician: Mike Odom
Report Distribution:
(1) The Beck Group
(!) Gromatzky Dupree & Assoc.
(I) Brockctte Davis Drake, Inc.
(!) The Beck Group
Started: 3:00am
( 1 ) Thc Beck Group
(I) I)alcan. Inc.
Finished: 11:00am
Vice President
This report is exclusively lbr thc usc of thc client i,dicated above and shall not be reproduced except in full without the writtcn approval of HBC Engineering. Inc.
0ILL Page 5 of 5