Loading...
Verizon-LR 990225CONCRETE COMPRESSIVE STRENGTH TEST Date of Service: 02/16/1999 Client No.: 08644025 Report No.: Project No.: 9905191 43-2333-98 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 02/25/1999 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 38.00 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of flesh concrete at the placement locations, perform required field test and cast compressive strength samples. co~rRAcxom BECK coNcam'z sm, PLmm TXI ~: 41 s~gc~o~ s~a~: 5~ psi ~ 28 Days SL~: 6.0" Max n~ N/A x~ ~o~: AS~ C- 143 ASTM C- 172 AS~ C-39 PROJECT DATA · CONC~Z CLASS: 8208 PLACEMENT DATE: 02/1611999 BATCH Tib~: 9:39am TnVtE SAMPLe-D: 10:05am BY: Mike Odom WEATHER CONDITIONS: TEMPERATURE (g) - AIR TRUCKNO: 715 Am cosTEivr (~): N/A PLACEMENT LOCATION: Fair 62 F coNc~rerz: 74 F TicI~'r No: 1241394 uNIT w~m~iT (pc0..- N/A Dock/patio L~vel !, 20' screen wall area A. building I SAMPLE LOCATION: First lift, south end CYLINDER MARKED SET NO. MEASURED SLUMP I 1 5.5O I 2 5.50 I 3 5.50 1 4 5.50 REPORT OF TESTS DATE TF. STED 02/2311999 02/23/1999 03/I6/1999 03116/1999 AGE (days) 7 7 28 28 MAXIMUM LOAD (lbs. f~c~ 155280 160570 Average ACCUMULATIVEYARDS: 40 COMPRESSIVE STRENGTH 5490 5680 5590 I 5 5.00 Teclmidan: Mike Odom Report Distribution: (I) The B4:~k Group (I) Gromau~y Dupree & Assoc. (!) Brockett~ Davis Drake, Inc. (1) The Beck Group 0411311999 Started: 9:00am (1) The Beck Group (1) Dalcan, Inc. 56 Finished: 3:00pm Eugene Harbour Vice President 0ILL This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, inc. Page 1 of I CONCRETE COMPRESSIVE STRENGTH TES'I 8901 Carpent~' Frwy. Suite #100 Dallas, Texas 7S247 Report Date Date of Service: 02/16/1999 Report No.: 9905190 02/25/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: Attn: Gillett Bcrgcr 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE S~PPLm~ TXI p~NT: 41 SPEC~CA~ON ~UI~ s~~: 5~ psi ~ 28 Days SL~P: 6.0" Max ~ N/A T~ ~O~: ASTM C- 143 AS~ C-172 AS~ C-39 PROJECT DATA CONCRETE CL~,SS: 8208 PLACE~IE2qT DATE: 02/16/1999 BATCH ~: 11:24am TaVmSAM~ED: 12:00pm BY: MikeOdom WEATm~R Co~rrloNs: Fair TEMPERATURE (F). ArR 66 r CONCRETE: 75 r XROCKNO: 807 TICKWfNO: 1241557 Am coh~.3rr (~): N/A uNrr WEIGHT (pc0: N/A PLACEMENT LOCATION: (5) Roof columm, Area B ~ R-2.9 @ 9.7, R2.9 ~ 9.4, J ~ 9.8, RA ~ R2, R5 @ RE and roof clcv. slab SAMPLE LOCATION: See below CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inch.) TESTED I I 6.00 02/2311999 7 1 2 6.00 02/23/1999 7 REPORT OF TESTS ACCUm VE YARDS: 580 MAXlblUM COMPRESSIVE AGE LOAD STRENGTH FRACTURE (day~) (Ib~. force) (psi) TYPE 147520 5220 136820 4840 Average S030 1 3 6.00 03116/1999 28 I 4 6.00 03116/1999 28 1 5 6.00 04/13/1999 56 Sample location: R2.9 ~ 9.4, (25) approx, yards placed on top Technician time: See Report #9905191 Five (5) gallons of water added Technician: Mike Odom Report Distribution: (I) ~ Beck Group (I) Gromatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. (1) Tl~ Beck Group (1) The Beck Group (I) Dalcan, inc. ~ E.~~, Inc. Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of I CONCRETE COMPRES JIVE STRENGTH TES i' Date of Service: Client No.: 12/30/1998 08644025 Report No.: 9835090 Project No.: 43-2333-98 8901 Carpenter Frwy., Suite #I00 Dallas, Texas 7~247 Report Date 02/25/1999 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. COt, rnO, CTOa: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMEHTS STRE~CTH: 5000 psi @ 28 Days s~.tnso,: 6.0" Max AIa: N/A T~ST MV-T~tOD: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: D-5 CYLilqDER MEASURED MARKED SLUMP SET NO. (inches) I I 6.00 I 2 6.00 6.00 6.00 6.00 1 3 1 4 I 5 PROJECT DATA CONCRETE CLASS: 8208 PLACEMENT DATE: 12/30/1998 BATCH TUSm: l:55pm TIME SAMPLED: 2:40pm BY: Mike Odom WEATHER CONDITIONS: TE~E~ATURE ¢~3 - Am TaUC~NO: 835 AIR CONTENT (%): N/A PLACEMENT LOCATION: Fair 54 F CONCRgTE: 68 r TICKET NO: 1205052 uNIT W~GHT (~f~.; N/A Five columns Level Ill-IV A-2, A, B, C, D ~ I Linc REPORT OF TESTS Accu~an~v~. VA~.~S: 12 MA~ COMPRESSIVE DATE AGE LOAD ~G~ ~D (~) 0~ f~) (~) 01~1999 7 128020 4530 0I/~1999 7 134050 4740 Avenge 4~ 01~7/1999 28 205140 7250 01~7/1999 28 193~0 6850 Avenge 7050 0~4/1999 56 2236~ 7910 FRACTURE TYPE Technician: Mike Odom Report Distribution: (!) The Beck Group ( I ) Gromatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. (1) The Beck Groap Started: 2:30am (I) The Beck Group (1) Dalcan, Inc. Finished: 4:00pm Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not he reproduced except in full without the written approval of HBC Engineering, Inc. 0iLL Page I of I CONCRETE COMPRESSIVE STRENGTH TEST Date of Service: 02/16/1999 Client No.: 08644025 Report No.: 9905145 Project No.: 43-2333-98 8901 Carpenter Frwy., Suite #100 Dall~, Tc~ 75247 Report Date 02/25/1999 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas SerVices: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. co~r~cTO~ BECK CONC~-'r~stw~..ma: TXI PLANT: 41 SPECIFICATION REQUIREMENTS s'rm~oTH: 5000 psi @ 28 Days SLt~P: 6.0" Max Am: N/A Tear Mm~OO: ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: 17.5 @ F CYLINDER MEASURED MARKED SLUMP SET NO. (incl.) 1 I 5.50 I 2 5.50 1 3 5.50 1 4 5.50 1 5 5.50 I 6 5.50 DATE TESTED 02/1811999 PROJECT DATA CONC~g'r~ CLASS: 8208 PLACEMENT DATE: 02/16/1999 BATCH TIME: 3:18pm TIME S~M~L~D: 3:45pm BY: Mike Odom WEATHER CONDITIONS: TEMPERATtrRE fi). Am T~UC~NO: 805 Am co~ (%): N/A P~C~ ~A~ON: Fair 62 F CONCRETE: 73 F T~CKgTNO: 1248759 uNrr W~IGHT (~u'~ N/A Building slab, level !I Area C between 13-18, E-H REPORT OF TESTS AGE LOAD (days) (lbs. force) 2 104360 02/2311999 02/2311999 03116/1999 03/16/1999 04/1311999 ACCUMULATIVE YARDS: 510 COMPRESSIVE STRENGTH FRACTURE (psi) TYPE 3690 7 135970 4810 7 145870 5160 Average 4990 28 28 56 0ILL This rcpo~ is exclusivcly for the use of thc client indicated above and shall not bc reproduced except in full without the written approval of HBC Engineering, Inc. Page I of 8 Report No 9905145 Twenty five (25) gallons of water added. This report is exclusively for the use of th~ client indicated above and shall not b~ reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page 2 of 8 CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date Date of Service: 02/16/1999 Report No.: 9905145 02/25/1999 Client No.: 08644025 Project No,: 43-2333-98 Client: The Beck Group Project: Attn: Oillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONCUR: BECK CONCRET~ Stn't, Lma: TXI PLATO': 41 SPECIFICATION REQUIRgMENTS s'rmma'm: 5000 psi @ 28 Days SLUMP: 6.0" Max Am: N/A TE.vr M~'mOD: ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRWr~ cLAss: 8208 PLACl.~,ni2qT DATE: 02/16/1999 BATCH Tayto: 4:3 lam T~SAMPL,~: 4:55am BY: Mike Odom WEATHER CONDITIONS: TEMPERATURg (F) - AIR XaUCKNO: 716 AIR CONTENT (%): N/A PLACEMENT LOCATION: See pa~e l Fair 59 F co~cRETz; 71 TIC~T Ho: 124083 uNIT WEIalrr (pc0; N/A SAMPLE LOCATION: Along E.5 @ 16.5 REPORT OF TESTS ACCt.Co~xrvE VAlUes: MAXEVlUM COMPRESSIVE CYLINDER MEASURED i MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 2 1 6.00 02/18/1999 2 85900 3040 510 2 2 6.00 02/23/1999 7 162400 5740 2 3 6.00 02/23/1999 7 147850 5230 Average 5490 2 4 6.00 03/16/1999 28 2 5 6.00 03116/1999 28 2 6 6.00 04/13/1999 56 OILL This report is exclusively for thc usc of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 3 of 8 CONCRETE COMPRESSIVE STRENGTH TEST I I Date of Service: 02/16/1999 Report No.: Client No.: 08644025 Project No.: Client: The Beck Group Project: Attu: GilleR Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 8901 Carpenter Frwy. Suite #100 D~fll~, Tex~ 75247 9905145 Report Date 02/2511999 43-2333-98 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. cotrr~c~OR: BECK CONCRETE SUPPLIER: T~ PLANT: 41 SPECIFICATION REQU~ STmmCTm 5000 psi @ 28 Days SLUMP: 6.0" Max Am: N/A TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Along G.5 @ 15.5 CYLINDER MARKED SET NO. MEASURED SLUMP 3 I 5.75 3 2 5.75 3 3 5.75 3 4 5.75 3 5 5.75 3 6 5.75 DATE TESTED 02/1811999 PROJECT DATA CONCag~: Ct~SS: 8208 ~'LACr, M~vr OAT~: 02/1611999 BATCH TIME: 5:49am T~Vm SAMP~-V-D: 6:10am aY-. Mike Odom WEA~mRCO~OmONS: Partly cloudy ~EM~E~ATURE~3-Am 58 ~ CONC~: 71 r ~UCKNO: 802 TICk.O: 12~16 Am co~ (~): N/A UNiT WEIG~ (~; N/A P~C~ L~ATION: Sec ~ge I REPORT OF TESTS ACCUm T YamS: MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (11~ force) (psi) 2 106440 3760 02/23/1999 02/2311999 03116/1999 03116/1999 04/13/1999 7 165390 5850 7 158310 5600 Average 5730 28 28 56 510 FRACTURE TYPE 0ILL This repotl is exclusively for the use of the client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc. Page 4 of 8 Report No.: 9905145 Ten (10) ~allons of water added. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page 5 of 8 CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpenter Frwy., Suite #100 Dalla~ Texas 75247 Date of Service: 02/16/1999 Report No.: 9905145 Report Date 02/25/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Be~k Group Project: ARm Oilier Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: cotfraxcTom BECK · CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS sTay~G'm: 5000 psi @ 28 Days 6.0" Max N/A ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: Along G.5 @ 14 CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 4 I 5.75 02/18/1999 PROJECT DATA CONCRETE CLASS: PLACEMENT DATE: TIME SAMPLED: 7:05am WEATHER CONDITIONS: TEMPERATURE (!~ - AIR TRUCK NO: 802 Ant CONTENT (%): N/A PLACEMENT LOCATION: See page ! 8208 02/16/1999 BATCH TIME: 6:139am BY: Mike Odom Partly cloudy 59 F COt~CgE'rg: 73 TICKET NO: 1241005 UNIT WEIGHT (pci~ N/A REPORT OF TESTS YAm S: 510 MAXlblUM COMPRESSIVE AGE LOAD STRENGTH FRACTURE (days) (lbs. force) (psi) TYPE 2 100980 3570 4 2 5.75 02/23/1999 7 165030 5840 4 3 5.75 02/23/1999 7 148980 5270 Average 5560 4 4 5.75 03/16/1999 28 4 5 5.75 03/16/1999 28 4 6 5.75 0411311999 56 This report is exclusively for the usc of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page 6 of 8 · i~eportNo.: 9905145 Ten (10) gallons of water added. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 7 of 8 CONCRETE COMPRESSIVE STRENGTH TES II Date of Service: 02/16/1999 CHent No.: 08644025 8901 Carpenter Frwy.~ Suite #100 l~ll~ Texas 75247 RePort Date Report No.: 9905145 02/25/1999 Project No.: 43-2333-98 Client: The Beck Group Project: Atto: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive CoPpell, Texas Services: Obtain samples of fresh concrete at the placement locationS, perform required field.test and cast compressive strength samples. CO~CTOg: BECK CONCgg'rE SU~PLIEg: TXI P~: 41 SPgC~C~ON ~V[~ ~~: 5~ psi ~ 28 Days SL~: 6.0" M~ Am: N/A ~ ~o~: ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCagTE CLASS: 8208 PLACater DATE: 02/16/1999 RATCH TtM~: 7:28am TIME SAMPLED: 8:05am BY: Mike Odom WEA'IItER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 802 AIR cot, rr~t~rr (~.): N/A PLACEMENT LOCATION: S~e page 1 Ten gallons of water added. Fair 59 F CONClmTE: 74 F TICKET NO: 1241117 UNn' V~IOHT (p~0; N/A SAMPLE LOCATION: Along G.5 @ 13.5 CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 5 I 6.00 REPORT OF TESTS ACCtn TtV . YARDS: 5 10 MAXIMUM COMPRESSIVE DATE AGE LOAD STRENGTH FRAC'I~RE TESTED (days) (lb~. force) (psi) TYPE 02/18/1999 2 112960 3990 5 2 6.00 5 3 6.00 5 4 6.00 5 5 6.00 02/2311999 7 173340 6130 02/2311999 7 185160 6550 Average 6340 03116/1999 28 03116/1999 28 5 6 6.00 0411311999 56 Technician: Mike Odom Report Distribution: (I) The Beck Group (I) Gromatzky Duprec & Assoc. { I) Brocketu: Davis Drake, Inc. (!) The Beck Group Started: 2:00am (I) The Beck Group (I) Dalcan, Inc. Finished: 9:00am Eugene Harbour Vice President This report is exclusively for thc use of thc client indicated above and shall not be l~-produced except in full without the written approval of H BC Engineering, Inc. 0ILL Page 8 of 8 CONCRETE COMPRESSIVE STRENGTH TES I $.~)1 Cm-pent~ FFwy., Suite #100 DalIM, Tex~ 7S247 Date of Service: Client No.: Client: 12/29/1998 08644025 The Beck Group Attn: Gillett Berger · 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Report No.: 9834950 RePort Date 02/2511999 Project No.: 43-2333-98 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services:' Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. com'~o, croR: BECK CONCRETE SUPPLIER: TXI PLA~F: 41 ST~NO~: 5~ psi ~ 28 Days SL~: 6.0" Max Am: N/A T~T M~ROO: AS~ C- 143 ASTM C-172 AS~ C-39 PROJECT DATA CONCg~r~ CLASS: 8208 PLACE. MENT DATE: 12/29/1998 BATCH TIME: 2:34pm TIME SAMPLED: 3:25pm BY: Mike Odom WEATHER CONDrrlONS: TEMPERATURE (F) - AIR TRUCK NO: 803 Am cot~rE~r(~): N/A Fair 63 r CONCgg'rg: 69 r TICKET NO: 1204096 utvrr WgIGtrr (pt.O: N/A PLACEMENT LOCATION: (15) Columns Level Ill-iV at A,B,C and Lines 2-5 = 15 (A-2 Column not I) SAMPLE LOCATION: D-4 CYLINDER MEASURED MARKED SLUMP SET NO. 1 I 6.50 1 2 6.50 I 3 6.50 I 4 6.50 1 5 6.50 I 6 6.50 DATE TESTED 12/3111998 01102/1999 01/05/1999 01/05/I999 01/26/1999 01/26/1999 REPORT OF TESTS ACCUMU rrVZ YARDS: 35.5 MAXIMUM COMPRESSIVE AGE LOAD s'rRENGTH (days) (lbs. force) (psi) 2 48570 1720 4 116930 4140 7 140670 4970 7 141350 5000 Average 4990 28 194130 6870 28 186010 6580 Average 6730 0ILL This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 1 of 2 Report No.: 9834950 MARKED SLUMP DATE SET NO. (inches) TESTED 1 7 6.50 02/23/1999 No~e: En~ra~ed air "no~ a~aren~" AGE (days) 56 MAXIMUM 0~force) 266300 COMPRF_.~IVE STRENGTH (ps~) 9420 Technician: Mike Odom Report Distribution: (I) The Beck Group (I) Gromatzky Dupree & Assoc. (I) Brockette Davis Drake, Inc. (I) The Beck Group Startea: 12:30pm (I) The Beck Group (1) Dalcan, Inc. Finished: 5:00pm ~ Eng.~gclnc. Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, inc. OII,L Page 2 of 2 'CONCRETE COMPR o SIVE STRENGTH TES Date of Service: 12/28/1998 Report No.: 9834785 Client No.: 08644025 Project No.: 43-2333-98 .8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 02/25/1999 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8208 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 12/28/1998 BATCh TIME: 6:27am PLANT: 31 TIME SAMPLED: 7:40am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Fair STREN~r.: 5000 psi (~ 28 Days TEMPERATURE (F)- AIR 34 F CONCRETE: 56 F SLUMP: 6.0" Max TRUCK NO: 561 TICKET NO: 1202572 AIR: N/A AiR CONTENT ('/.): N/A [INIT WEIGHT (pc.f): NA T~ST METltOO: ASTM C- 143 PLACEMENT LOCATION: Level Ill west wing slab A-D & I-5.7 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) I 1 6.25 12/31 /1998 3 92040 3250 I 2 6.25 01/04/1999 ? I 18370 4190 1 3 6.25 01/04/1999 7 121550 4300 Average 4250 ! 4 6.25 0 !/25/1999 28 150730 5330 I 5 6.25 01/25/1999 28 161700 5720 Average 5530 I 6 6.25 02/22/1999 56 213870 7560 500 FRACTURE TYPE This rcporl is exclusively lbr thc usc of thc clicm indicated above and shall not be reproduced except in full without the written approval of IIBC Engineering. Inc. Iii LL Page I of 7 ' "Rep6rt No.: 9834785 ~ ~"=~ H~ Sample location: Level III in Beam G-4 between Line A-B This report is exclusively Ibr thc usc t,l'the clic.t indicated above and shall not be reproduced except in full without the written approval or' I{BC Engineering. Inc. 011 J, I'~'lge 2 of 7 'CONCRETE COMPR o SIVE STRENGTH TES Date of Service: 12/28/1998 Report No.: 9834785 Client No.: 08644025 Project No.: 43-2333-98 .8901 Carpenter grwy., Suite #100 Dallas, Texas 75247 Report Date 02/25/1999 Client: The Beck Group Project: Attn: Giilett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TX] PLANT: 31 SPECIFICATION REQUIREMENTS STRENGT,: 5000 psi ~ 28 Days SLUMP: 6.0" Max AIR: N/A TES~r M~rHOD: ASTM C- i 43 ASTM C- ! 72 ASTM C-39 SAMPLE LOCATION: Level 1tl slab ~ Linc C ~ 2 PROJECT DATA CONCRETE CLASS: PLACEMENT DATE: TIME SAMPLED: 9:20am WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 57 l AIR CONTENT (%): N/A PLACEMENT LOCATION: S¢¢ pagc I 8208 12/28/1998 BATCH TIME: 8:49am BY: Mike Odom Fair 48 F CONCRETE: 55 F TICKET NO: 1202713 UNIT WEIGHT (pep: N/A REPORT OF TESTS ACCUMULATIVE YARDS: 500 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 I 6.25 i 2/3 ! / 1998 3 104610 3700 2 2 6.25 01/04/1999 7 120840 4270 2 3 6.25 01/04/! 999 7 125690 4440 Average 4360 2 4 6.25 01/25/1999 28 ! 64400 5810 2 5 6.25 01/25/1999 28 148980 5270 Average 5540 2 6 6.25 02/22/1999 56 234690 8300 'lllis rcporl is cxclusivcly lbr thc usc ol*thc clicm i.dicatcd above and shall not bc reproduced except in full without thc written approval oI'IIBC Engineering, Inc. ltl I,I. Page 3 of 7 CO'NCRETE COMPRESSIVE STRENGTH TEST Date of Service: 12/28/1998 Report No.: Client No.: 08644025 Project No.: 9834785 43-2333-98 ~1901 Carpenter Frwy. Suite #100 Dallas, Texas 75247 Report Date 02/25/1999 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Project: GTE Shared Services Coppell Road & Corporate Drive Coppeli, Texas Services: Obtain samples of flesh concrete at the placement locations, perform required field test and cast · compressive strength samples. COnTRAC'rOR: BECK CONCRETE SUPPLIER: TX[ PLANT: 31 SPECIFICATION REQUIREMENTS STRENGTH: 5000 psi (~ 28 Days SLUMP: 6.0" Max AIR: N/A TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 8208 .. PLACEMENT DATE: 12/2811998 BATCH TIME: 10:00am TIME SAMPLED: 10:45am BY: Mike Odom WEATHER CONDITIONS: TEMPERATURE (F). AIR TRUCK NO: 420 AIR CONTENT (%): N/A PLACEMENT LOCATION: See page I Fair 52 F CONCRETE: 55 F TICKET NO: ] 202816 UNITWEIGItT (pcf}: N/A SAMPLE LOCATION: Along Linc B (~ 2.5 CYLINDER MARKED SET NO. 3 I 5.75 REPORT OF TESTS ACCUMULATIVE YARDS: MEASURED MAXIMUM COMPRESSIVE SLUMP DATE AGE LOAD STRENGTH (inches) 'TESTED {days) (lbs. force) (psi) i 2/31 / 1998 3 96580 3420 500 FRACTURE TYPE 3 2 5.75 01/04/1999 7 ! 15490 4080 3 3 5.75 01/04/1999 7 121740 4310 Average 4200 3 4 5.75 01/25/1999 28 157700 5580 3 5 5.75 01/25/1999 28 145410 5140 Average 5360 3 6 5.75 02/22/1999 56 206640 7310 OILI. This rcporl is exclusively lbr thc usc ol'lhc client i,dicatcd above and shall BDt bc reproduced except in tull without the written approval of l IBC Engineering, Inc. PaRe 4 of 7 8901 Carpenter Frwy., Suite #100 Dallas, Terdm 75247 Date of Service: Client No.: 12/28/1998 08644025 Report No.: 9834785 Project No.: 43-2333-98 Report Date 02/25/1999 Client: The Be~k Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 3 1 SPECIFICATION REQUIREMENTS STRENGTH: 5000 psi (~ 28 Days SLUMP: 6.0" Max AIR: N/A TEST METHOD: ASTM C- i 43 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Along 3.5 (t~ C PROJECT DATA CONCRETE CLASS: 8208 PLACP-MENT DATE: 12/28/1998 BATCI! TIME: TIME SAMPLED: 12:00pm ay: Mike Odo*n WEATHER CONDITIONS: Partly cloudy TEMPERATURE (F)-AIR 54 F CONCRETE: 56 TRUCK NO: 389 AIR CONTENT (%): N/A PLACEMENT LOCATION: See page ! F TICKET NO: 1202935 UNITWEIGIlT (pc0: N/A 1 l:19am REPORT OF TESTS ACCUMULATIVE YARDS: 500 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AG E LOAD STRENGTtl FRACTURE SET NO. (inchea) TESTED (days) (lbs. force) (psi) TYPE 4 ! 5.50 12/31/1998 3 98510 3480 4 2 5.50 01/04/1999 7 130540 4620 4 3 5.50 01/04/1999 7 134970 4770 Average 4700 4 4 5.50 01/25/1999 28 195570 6920 4 5 5.50 01/25/I 999 28 204670 7240 Average 7080 4 6 5.50 02/22/1999 56 221760 7840 I!1 I.I. This report is exclusively tbr the usc Gl*thc client indicated above and shall not bc reproduced except in lull without thc written approval of l IBC Engineering, Inc. I'a~e 5 of 7 'CONCRETE COMPR o'SIVE Date of Service: Client No.: Client: 12/28/1998 08644025 The Beck Group Attn: Gillett Berger 1700 PaciHc Ave., Suite 3800 Dallas TX 75201-4619 STRENGTH TES .8901 Carpenter Frwy., Suite #100 Dallaa, Tezn 75247 Report No.: 9834785 Project No.: 43-2333-98 Report Date 02/25/1999 Project: GTE Shared Services Coppell Road & Corporate Drive Coppeli, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE Ct,ASS: 8208 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 12/28/1998 BATCH TIME: I 1:58am P~A~rr: 31 TIME SAMPLED: 1:05pm aY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy STRENGTH: 5000 psi(~ 28 Days TEMPERATURE (F) - AIR 57 F CONCRETE: 57 F SLUMP: 6.0" Max TRUCK NO: 562 TICKET NO: 1202994 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pc0: N/A TEST METHOD: ASTM C- 143 PI.ACEMENT LOCATION: ASTM C- ! 72 Page 1 ASTM C-39 SAMPLE LOCATION: Along B.5 ~ 5.3 REPORT OF TESTS ACCUMULATIVE YARDS: CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED {days) (lbs. force) (psi) 5 I 6.50 12/3 !/1998 3 71600 2530 5 2 6.50 0 i/04/1999 7 126740 4480 5 3 6.50 01/04/1999 7 123440 4370 Average 4430 5 4 6.50 01/25/I 999 28 184470 6520 5 5 6.50 01/25/1999 28 180360 6380 Average 6450 5 6 6.50 02/22/1999 56 ! 96470 6950 500 FRACTURE TYPE This report is exclusively Ibr the usc of the client indicated above and shall not be reproduced except in full without the written approval of l IBC Engineering. Inc. 01LI. Page 6 of 7 9834785 All samples from pump hopper. Technician: Mike Odom Report Distribution: ( I ) The Beck Group (I) Gromatzky Dupree & Assoc. (I) Brockctte Davis Drake, Inc. ( I ) Thc Beck Group Started: 6:00am Finished: 2:30pm H~ ~ ( I ) Thc Beck Group ( I ) Dalcan, lqc. Eugene~naroour Vice President This reporl is exclusively Ibr thc usc of thc clicut iudicatcd above and shall not b~ reproduced except in full witbout Ibc written approval of I IBC E,gin¢criug, Inc. OI 1.1. Page 7 of 7