Loading...
Verizon-LR 990224CONCRETE COMPREhenSIVE STRENGTH TES Date of Service: Client No.: Client: 12/19/1998 08644025 The Beck Group ARm Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Report No.: Project No.: Project: 9834168 43-2333-98 .8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 02/24/1999 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOm BECK CONCRETE SUPPLIER: TXI PLANT: 31 SPECn'ICAT~ON REQUtREMr_~rs ~C, Tm 5~ psi O 28 Days SLUr: 6.0" Max nl~ N/A T~T M~On: ASTM C- 143 ASTM C- 172 ' ASTM C-39 SAMPLE LOCATION: E- 11 PROJECT DATA CONCRETE CLASS: 8208 PLACEMENT DATE: 12/19/1998 BATCH X~nE: 10:53am TIME SAMPLED: 12:00pm BY: Mike Odom WEATIIER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 563 AIR CONTENT (%): 1.6 PLACEMENT LOCATION: Cloudy 53 l~ CONCRETe: 62 F 'nCKET NO: 1202182 UNIT WEIGItT (pel).: N/A L~vel I!-ill Columns ~ E, I I, 12, 13, K-10, H-13 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 6.75 6.75 6.75 6.75 6.75 REPORT OF TESTS ACCUMULATIVE YARDS: 12.5 MAXIMUM COMPRESSIVE DATE AGE LOAD STRENGTH FRACTURE TESTED (days) (1~. force) (psi) TYPE 12/'26/1998 7 104310 3690 1212611998 7 105160 3720 Average 3710 01/16/1999 28 132060 4670 01/16/1999 28 133890 4730 Average 4700 02/13/1999 56 149070 5270 Technician: Mike Odom Report Distribution: ( I ) The Beck Group ( I ) Gromatzky Dupree & Assoc. (I) Brocketle Davis Drake, Inc. (i) The Beck Group Started: h00pm (I) The Beck Group (I) Dalcan, lac. Finished: 2:30pm Eugene Harbour Vice President This report is exclusively for thc use oflh~ client indicated above and shall no~ I~ reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of I