Verizon-LR 9902191 CONCRETE COMPRESSIVE STRENGTH TEST eCANWIRM, M. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 02/10/1999 Report No.: 9904621 Report Date 02/19/1999 Client No.: 08644025 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201 -4619 Project No.: 43- 2333 -98 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE SUPPLIER TXI PLANT: 31 SPECIFICATION REQUIREMENTS STRENGTH: 5000 psi C@ 28 Days SLUMP: 6.0" Max AIR N/A TEST METHOD: ASTM C -143 ASTM C -172 ASTM C -39 SAMPLE LOCATION: Beam along Line 6 @ C Line CONCRETE CLASS: 8208 PLACEMENT DATE 02/10/1999 BATCH TIME: 2:40am TIME SAMPLED: 3 :30am BY: Mike Odom WEATHER CONDITIONS: Cloudy TEMPERATURE (F) - AIR 58 F CONCRETE: 79 F TRUCK NO: 484 TICKET NO 1235838 AIR CONTENT (%): N/A UNIT WEIGHT (pcf)1 N/A PLACEMENT LOCATION: Roof slab Area B 5.7 -13 Note: Five (5) gallons of water added. REPORT OF TESTS CYLINDER MARKED SET NO. 1 1 1 2 1 3 1 4 1 5 1 6 MEASURED SLUMP (incites) 5.25 5.25 5.25 5.25 5.25 5.25 DATE TESTED 02/12/1999 02/17/1999 02/17/1999 03/10/1999 03/10/1999 04/0711999 MAXIMUM LOAD (lbs. force) AGE (days) 98460 146580 130320 Average ACCUMULATIVE YARDS: 550 2 7 7 28 28 56 COMPRESSIVE STRENGTH (PA) 3480 FRACTURE TYPE 5180 4610 4900 -4 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. oILL Page 1 of 5 CONCRETE COMPRESSIVE STRENGTH TEST fBC )3v c11 IFER c, INC. 8901 Carpenter Fury., Suite #100 Dallas, Texas 75247 Date of Service: 02/1011999 Report No.: 9904621 Report Date 02/19/1999 Client No.: 08644025 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201 -4619 Project No.: 43- 2333 -98 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 31 SPECIFICATION REQUIREMENTS STRENGTH: 5000 psi @ 28 Days SLUMP: 6.0" Max AIR: N/A TEST METHOD: ASTM C -143 ASTM C -172 ASTM C -39 SAMPLE LOCATION: Along Line N 0 9.3 CONCRETE CLASS: 8208 PLACEMENT DATE: 02/10 /1999 BATCH TIME: 4:17am TIME SAMPLED: 5:00am BY: Mike Odom WEATHER CONDITIONS: Cloudy TEMPERATURE (F) - AIR 60 F CONCRETE: 78 F TRUCK NO: 541 TICKET NO: 1235918 AIR CONTENT (%): N/A UNIT WEIGHT (pcil. N/A PLACEMENT LOCATION: See page 1 Note: Fifteen (15) gallons of water added. REPORT OF TESTS CYLINDER MARKED SET NO. 2 1 2 2 2 3 2 4 2 5 2 6 MEASURED SLUMP (inches) 5.75 5.75 5.75 5.75 5.75 5.75 DATE TESTED 02/12/1999 02/17/1999 02/17/1999 03/10/1999 03/10/1999 04/07/1999 MAXIMUM LOAD (lbs.force) AGE (days) 116000 156020 152650 Average ACCUMULATIVE YARDS: 550 2 7 7 28 28 56 COMPRESSIVE STRENGTH (psi) 4100 FRACTURE TYPE 5520 5400 5460 M This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. DILL Page 2 of 5 CONCRETE COMPRESSIVE STRENGTH TEST fBC > 3 ,Dr 8901 Carpenter Frwy., Suite #100 Dallas, Texas 7S247 Date of Service: 02/1011999 Report No.: 9904621 Report Date 02/19/1999 Client No.: 08644025 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201 -4619 Project No.: 43- 2333 -98 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 31 SPECIFICATION REQUIREMENTS STRENGTH: 5000 psi @ 28 Days SLUMP: 6.0" Max AIR: N/A TEST METHOD: ASTM C -143 ASTM C -172 ASTM C -39 SAMPLE LOCATION: Along C.5 -1) @ 7 CONCRETE CLASS: 8208 PLACEMENT DATE: 02/10/1999 BATCH TIME: 4:17am TIME SAMPLED- 6:15am BY: Mike Odom WEATHERCONDITIONS: Cloudy TEMPERATURE(F) -AIR 62 F CONCRETE: 77 F TRUCK NO: 738 TICKET NO: 1236006 AIR CONTENT (%): N/A UNIT WEIGHT (pct): N/A PLACEMENT LOCATION: See page 1 Note: Ten (10) gallons of water added. REPORT OF TESTS CYLINDER MARKED SET NO. 3 1 3 2 3 3 3 4 3 5 3 6 MEASURED SLUMP (incbes) 5.50 5.50 5.50 5.50 5.50 5.50 DATE TESTED 02/12/1999 02/17/1999 02/17/1999 03/10/1999 03/10/1999 04/07/1999 MAXIMUM LOAD (lbs. force) AGE (days) 112550 156680 143320 Average ACCUMULATIVE YARDS: 550 2 7 7 28 28 56 COMPRESSIVE STRENGTH (psi) 3980 FRACTURE TYPE 5540 5070 5310 i This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. DILL Page 3 or 5 CONCRETE COMPRESSIVE STRENGTH TEST fBC RCIN . M. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 02/10 /1999 Client No.: 08644025 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201 -4619 Report No.: 9904621 Report Date 02/19/1999 Project No.: 43- 2333 -98 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 31 SPECIFICATION REQUIREMENTS STRENGTH: 5000 psi @ 28 Days SLUMP: 6.0" Max AIR: N/A TEST METHOD: ASTM C -143 ASTM C -172 ASTM C -39 SAMPLE LOCATION: Along M.5 @ 9.7 CONCRETE CLASS: 8208 PLACEMENT DATE: 02/10/1999 BATCH TIME: 6:56am TIME SAMPLED: 8:00am BY: Mike Odom WEATHER CONDITIONS: Partly cloudy TEMPERATURE (F) - AIR 64 F CONCRETE: 75 F TRUCK NO: 480 TICKET NO: 1236170 AIR CONTENT (%): N/A UNIT WEIGHT (pcf)s N/A PLACEMENT LOCATION: See page I Note: Ten (10) gallons of water added. REPORT OF TESTS CYLINDER MARKED SET NO. 4 1 4 2 4 3 4 4 4 5 4 6 MEASURED SLUMP (inches) 5.75 5.75 5.75 5.75 5.75 5.75 DATE TESTED 02/12/1999 02/17/1999 02/17/1999 03/10/1999 03/10/1999 04/07/1999 MAXIMUM LOAD (Ibs. force) 83460 120620 118740 Average ACCUMULATIVE YARDS: 550 AGE (days) 2 7 7 28 28 56 COMPRESSIVE STRENGTH (psi) 2950 FRACTURE TYPE 4270 4200 4240 hrdA' This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. O1LL Page 4 of 5 F i I CONCRETE COMPRESSIVE STRENGTH TEST fDC &"I Carpenter Fury., Suite #100 Dallas, Texas 75247 Date of Service: 02/10/1999 Report No.: 9904621 Report Date 02/19/1999 Client No.: 08644025 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201 -4619 CONCRETE CLASS: 8208 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE SUPPLIER TXI PLANT: 31 SPECIFICATION REQUIREMENTS STRENGTH: 5000 psi 0 28 Days SLUMP: 6.0" Max AIR: N/A TEST METHOD: ASTM C -143 ASTM C -172 ASTM C -39 SAMPLE LOCATION: Along 12, Lien E.5 - Project No.: 43- 2333 -98 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas PLACEMENT DATE 02/10/1999 BATCH TIME 8:39am TIME SAMPLED N/A BY: Mike Odom WEATHER CONDITIONS: Cloudy TEMPERATURE (F) - AIR 70 F CONCRETE: 75 F TRUCK NO: 428 TICKET NO: 1236405 AIR CONTENT (%): N/A UNIT WEIGHT (pcn: N/A PLACEMENT LOCATION: See page l Note: Ten (10) gallons of water added. REPORT OF TESTS CYLINDER MARKED SET NO. 5 1 5 2 5 3 5 4 5 5 5 6 5.50 5.50 5.50 5.50 5.50 5.50 DATE TESTED 02/12/1999 02/17/1999 02/17/1999 03/10/1999 03/10/1999 04/07/1999 AGE (days) 2 7 7 28 28 56 MAXDvIUM LOAD (ibs.force) 92640 127750 121840 Average ACCUMULATIVE YARDS 530 COMPRESSIVE STRENGTH (psi) 3280 FRACTURE TYPE 4520 4310 4420 Technician: Mike Odom Started: 2:00am Finished: 12:00pm � Engine nC. Report Distribution: (1) The Beck Group (1) The Beck Group (t) Gromatzky Dupree & Assoc. (1) Dalcan, Inc. Eugene Harbour (1) Brockette Davis Drake, Inc. Vice President (1) The Beck Group This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. MEASURED SLUMP (inches) u1LL Page 5 of 5 CONCRETE COMPRESSIVE STRENGTH TEST' fBC ENGIIV FP 111G, INC. 8,901 Carpenter Fury., Suite #100 Dallas, Taw 75247 Date of Service: 01/20/1999 Report No.: 9902678 Report Date 02/19/1999 Client No.: 08644025 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201 -4619 CONCRETE CLASS: 8208 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE SUPPLIER TXI PLANT: 41 SPECIFICATION STRENGTH: SLUMP: AIR: TEST METHOD: REQUIREMENTS 5000 psi @ 28 Days 5.0" Max N/A ASTM C -143 ASTM C -172 ASTM C -39 SAMPLE LOCATION: 10 L, M, N & l l - E PLACEMENT DATE: 01/20/1999 BATCH TIME 1:51pm TIME SAMPLED: 3 :00pm BY: Ervin Farris WEATHER CONDITIONS: Cloudy TEMPERATURE (F) - AIR 72 F CONCRETE: 74 F TRUCK NO: 456 TICKET NO: 1220454 AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A PLACEMENT LOCATION: Columns Level tats Area 4B Vs 10 -K, L, M, N, I I -E & F, 12 -E & F, 13 -E, F, G, H & 12 -G REPORT OF TESTS CYLINDER MARKED SET NO. I I 1 2 MEASURED SLUMP (inches) c PI` II 1 3 3.00 1 4 3.00 1 5 3.00 1 6 3.00 Technician Ervin Farris Report Distribution: (1) The Beck Group (l) Gromatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. (1) The Beck Group DATE TESTED 01/23/1999 01/23/1999 01/27/1999 01/27/1999 02/17/1999 02/17/1999 AGE (days) 3 3 Started: 3:00pm (1) The Beck Group (1) Dalcan, Inc. g g� Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 7 7 28 28 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas MAXIMUM LOAD (Ibs. force) 141020 132230 Average 147240 151320 Average 207080 214000 Average ACCUMULATIVE YARDS: 10 COMPRESSIVE STRENGTH (psi) FRACTURE TYPE 4990 4680 4840 5210 5350 5280 7320 7570 7450 Finished: 5:00pm � En i Inc Project No.: 43- 2333 -98 O1LL Page 1 of 1