Loading...
Verizon-LR 990218CONCRETE COMPRESSIVE STRENGTH TES3" Date of Service: 01/19/1999 Client No.: 08644025 8901 Carpenter Frwy., Suite #100 Dallas, Texas 7~247 Report No.: 9902556 Report Date 02/1811999 Project No.: 43-2333-98 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & COrporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: ' TXI PLA~r: 41 SPECIFICATION REQUIREMENTS STREN(;Tm 5000 psi @ 28 Days SLUMP: 6.0" Max AIR: N/A TES'r ME'r~loo: ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRE'r~ CLASS: 8208 PLACEM~ DA't~: 01/19/1999 aATCtl TIME: l:53pm Tn~SAMPLED: 2:30pm aY: Mike Odom WEATHER CONDITIONS: TEMPERA~RE (Ir) - AIR TRUCK NO: 643 AIR CONTENT ('~): N/A Partly cloudy 71 ~' CONCRETE: 75 F TXCKET NO: 1219169 UNIT WEIGIIT (pcf):. N/A PLACEMENT LOCATION: Level IV building columns (16) A & B-8, K, J, L, M, N, P @ 9.3, K, J, L, M, N, P @ 9.7, L, K@9 Note:Fifteen (15) gallons of water added. SAMPLE LOCATION: A@8 CYLINDER MEASURED MARKED SLUMP SET NO. (inches) I I 5.75 REPORT OF TESTS DATE AGE TESTED (days) 01/21/1999 2 ACCUMULATIVE YARDS: 35 MAXI~IUM COMPRESSIVE LOAD STRENGTII FRACTURE (Ib~. force) (psi) TYPE 129460 4580 5.75 5.75 5.75 5.75 I 6 5.75 Technician: Mike Odom Report Distribution: (I) The Beck Group (I) Gromatzky Dupree & Assoc. (I) Brockctte Davis Drake, Inc. (I) The Beck Group 01/26/1999 7 01/26/1999 7 02/16/1999 28 02/16/1999 28 03/16/1999 56 Started: l:30pm (I) The Beck Group (I) Dalcan. Inc. 143770 5080 153780 5440 Average 5260 177110 6260 178100 6300 Average 6280 Finished: 5:00pm Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of I