Loading...
ST9601-LR 990316 TEAM CONSULTANTS, INC. 2970 S. Walton Walker, Suite 101 Dallas, Texas 75211 2 14/331-4395 CONCRETE PLACEMENT REPORT Mr. Robert Caudill DATE: 03/16/1999 JOB TITLE: Wrangler Drive Tiseo Paving REPORT NO.: 51 Coppell PO Box 270040 JOB NO.: 985142 Dallas, Texas 75227 DESIGN USED: Tiseo, 5.0 sack START UP TIME: 7:30 SAMPLING METHOD: ASTM C-172 ASTM C-31 ASTM ASTM TEMPERATURE TIME TIME BEAM OR CYL. TRUCK TICKET WATER CUBIC C-143 C-231 (F°) BATCHED UNLOADED SET NOS. LOCATION NO. NO. ADDED YARDS SLUMP % AIR AMB/CONC REMARKS 7:07 7:30 30 A-D Wrangler Road, Sta. 35+50 I 2 0 10.0 2.75 6.0 -- 57 8:24 9:25 31 A-D Wrangler Road, Sta. 33+00 -- 13 10 10.0 3.00 7.0 -- 60 -- 11:15 32 A-D Wrangler Road, Sta. 31+50 -- 23 5 10.0 3.50 4.0 -- 63 -- 1:00 33 A-D Wrangler Road, Sta. 30+00 -- 35 0 10.0 4.00 7.0 -- 63 -- 2:10 34 A-D Wrangler Road, Sta. 28+60 -- 47 10 10.0 4.00 6.0 -- 64 -- 3:00 35 A-D Wrangler Road, Sta. 26+00 .... 0 10.0 3.50 6.0 -- 64 -- 4: ] 0 36 A-D Wrangler Road, Sta. 24+60 .... 0 10.0 3.75 6.0 -- 64 REMARKS: -- Time On: 6:30 Ti~ne Off: 5:30 / Tech. Time: 11.0 hrs. SIGNED: , ,~_ Trip Charge: I Jason Hooton TechnYcian Iw cc: City of Coppell/Larry Davis