Loading...
Verizon-LR 990216- CONCRETE COMPRE SI STRENGTH TES'x' Date of Service: Client No.: 12/21/1998 08644025 Report No.: 9834234 Project No.: 43-2333-98 · 8901 Carpenter Frwy., Suite#100 Dnll~, Texas 75~47 Report Date 02/16/1999 Client: The Beck Group Project: Attn: Oillett Berger 1700 Pacific Ave,, Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas ServiCes: Obtain samples of fresh concrete at. the placement locations, perform required field test and cast compressive strength samples. colvraAcroa: BECK CONCI~TE SUPPLIER: TXI PLAt~r: 31 SPECIFICATION REQUIREblEaNTS STRgNGTIi: 5000 psi @ 28 Days SLUMP: 6.0" Max Am: N/A ~ ~OD: ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: N @ 10 CYLINDER MEASURED MARKED SLUMP SET NO. 0riches) 1 1 6.75 I 2 6.75 1 3 6.75 I 4 6.75 1 5 6.75 T~chnician: Mike Odom Report Distribution: (I) The Beck Group (I) Gromatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. (I) The Beck Group PROJECT DATA coNc~r~ ct. ass: 8208 PLACEMI~tT DATE: 12/21/1998 BATCH TIME: l:28pm TaStE SAMPt. ED: 2:15pm aY: Mike Odom WEATItER CONDITIONS: Cloudy ~F.,RATURE (F) - AIR 38 F CONCRETE: 58 F TRUCg NO: 905 TICgE'r NO: 1202508 A~R CO~ (%): N/A U~ WEIG~ (~: N/A P~C~ ~ON: Level H-Ill colum~ O F-O O 12. F-G · 13, F O 1 I, N,M, L,K O 9-7, N, M, L O 10 REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) 12/26/1998 5 56480 ACCUMULATIVE YARDS: 25 COMPRESSIVE STRENGTH FRACTURE (psi) TYPE 20O0 12/28/1998 7 82570 2920 01/18/1999 28 01/18/1999 28 02/15/1999 56 Started: 12:30pm (I) The Beck Group (I) D~lcan, Inc. 169640 6000 182340 6450 Average 6230 187020 6610 Finished: 4:00pm Eugene Harbour Vice President 0ILL This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 1 of I CONCRETE COMPRESSIVE STRENGTH TES'I I Date of Service: 01/18/1999 Client No.: 08644025 Report No.: 9902420 Project No.: 43-2333-98 8901 Carpenter Fr~., Suite #100 Dallas, Texas 75247 Report Date 02/16/1999 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CO~m~AC'XOR: BECK CONCRETE SUPPLIER: TXI PLAt~rr: 31 SPECIFICATION REQUIREMENTS s~u~;mml: 5000 psi @ 28 Days SLUMP: 6.0" Max AIR: N/A ~ M'~mOD: ASTM C- 143 ASTM C- 172 ASTlVi C-39 PROJECT DATA CO~C~'T~ CUASS: 8208 PLACEMENT DATE: 01/18/1999 BATCH TIME: 3:23pm TIM~ SAMPLED: 4:15pm ~,v: Mike Odom WEATIiER CONDITIONS: TI2dP~RATURE (F) - AIR T~UCKNO: 480 AIR CONTENT (%): N/A PLACEMENT LOCATION: Fair 63 s CONCRETg: 68 F TICKET NO: 1217978 UNIT WEIGHT (l~:f): N/A Level IV building columns (9) A,B, C,D ~ 6, A,B C ~7, N & M @ 9 Note: Fifteen (15) gallons of water added. SAMPLE LOCATION: A @ 7 CYLINDER MEASURED MARKED SLUMP SET NO. (inches) I 1 6.00 REPORT OF TESTS ACCuM,. mw . YAMS: MAXIblUM COMPRESSIVE DATE AGE LOAD STRENGTH TESTED (days) (ib~ force) (psi) 01/19/1999 1 32390 1150 19.5 FRACTURE TYPE I 2 6.00 I 3 6.00 I 4 6.00 1 5 6.00 I 6 6.00 TechnlOan: Mike Odom Report Distribution: (I) Tbe Beek Group (I) Gromatzky Dupfee & Assoc. (I) Brocketle Davis Drake, Inc. (l) The Beck Group 01/25/1999 7 01/25/1999 7 02/15/1999 28 02/15/1999 28 03/15/1999 56 Started: 3:00pm (I) The Beck Group (I) Dalcan, Inc. 98460 105700 Average 155320 145590 Average 3480 3740 3610 5490 5150 5320 Finished: 6:00pm ~ Engi~, Inc. Eugene Harbour Vice President This repo~ is exclusively for the usc of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. 0ILL Page I of I CONCRETE COMPRESSIVE ST NGTH TEST Date of Service: 01/18/1999 Report No.: Client No.: 08644025 Project No.: Client: The Beck Group Project: Atto: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4519 8901 Carpenter Frwy., Suite #100 Dalla,, T~xa~ 7S247 9902392 Report Date 02/16/1999 43-2333-98 GTE Shared Services Coppell Road & Corporate Drive Coppell, TeXas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. cot~rranc'roR: BECK CONCR_WrE SUPPLIER: TXI Pr. ANT: 41 SPECIFICATION REQUIREMENTS STabS'm: 5000 psi @ 28 Days SLCrM~: 6.0" Max Aim N/A TEST MET~IOO: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: C.5@6 PROJECT DATA cot~cRE'rg Ct,ASS: 154 PLACEMENT OATE: 01/18/1999 BATCH TIME: 2:59am TIME SAMPLED: 3:30am BY: Mike Odom WF..ATIIER CONDITIONS: TEMPERATURg (It). AIR TRUCKNO: 715 AIR CONTENT {%}: 1.7 PLACEMENT LOCATION: Fair 41 F CONCR~E: 62 F TICKE'r NO: 1216779 uNrr ~VEIatrr (per),: N/A Level IV building slab Area B, 5.7-13 Lines CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 1 I 5.50 REPORT OF TESTS Acct TIVE YARDS: 540 MAXIbIUM COMPRESSIVE DATE AGE LOAD STRENGTtl TESTED (days) (lbs. force) (psi) 01/20/1999 2 117510 4160 FRACTURE TYPE I 2 5.50 01/21/1999 3 135720 4800 I 3 5.50 I 4 5.50 I 5 5.50 I 6 5.50 01/25/1999 7 163380 01/25/1999 7 169330 Average 02/15/1999 28 229570 02/1511999 28 242550 Average 5780 5990 5890 8120 8580 8350 01LL This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page I of 10 C~ER ~~D ~~ CO~IVE ~ SL~P DATE AGE LOAD S~ NO. (~) ~D (days) (i~ fore) (~i) ~E I 7 5.50 03/15/1999 56 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. OILL Page 2 of 10 CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpenter Frwy., Suit~ #100 Dallas, Texas 75247 Date of Service: Client No.: 01/18/1999 08644025 Report No.: 9902392 Project No.: 43-2333-98 Report Date 02/16/1999 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave,, Suite 3800 Dallas TX 75201-4619 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. COtVnO, CTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS WEATtlER CONDITIONS: Fair s'r~N(~: 5000 psi @ 28 Days T~tPEaA'ru~ (t3-AIR 38 F CONCRETE: 63 F SLUMP: 6.0" Max TRUCKNO: 716 TICKETNO: 1216814 AIR: N/A AIR CON'r~rr (~): N/A uNrr WEi(;irr (p~f: N/A TEST METIIOO: ASTM C- 143 PLACEMENT LOCATION: ASTM C-172 See page I ASTM C-39 SAMPLE LOCATION: B.5 @ 6.5 PROJECT DATA CONCRE'r~ CLASS: 154 PLACEMENT DATE: 01/18/1999 BATCH TIME: 4:19am TIME SAMPLED: 4:45am BY: Mike Odom REPORT OF TESTS ACCmXn,Am, E VAlUeS: 540 CVL',' DER M SUl m, xnvnen ~D SL~ DA~ AGE LOAD ~G~ F~~ S~ NO. (~) ~D (~ys) (1~ for~) (~i) ~PE 2 t 5.50 01~0/1999 2 121610 43~ 2 2 5.50 01/21/1999 3 143700 5080 2 3 5.50 01/25/1999 7 155590 5500 2 4 5.50 01/25/1999 7 158590 5610 Average 5560 2 5 5.50 02/15/I999 28 224290 7930 2 6 5.50 02/15/1999 28 218520 7730 Average 7830 0ILL This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc. Page 3 of 10 CYLINDER MEASURED MA~ COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRI~. GTH FRACTURE SET NO. (inches) TESTED (days) (lb~. force) (psi) TYPE 2 7 5.50 03/15/1999 Ten (10) gallons of water added. 56 OILL This report is exclusively for thc usc of Ihe client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 4 of 10 CONCRETE COMPRESSIVE STRENGTH TEST Date of Service: 0111811999 Client No.: 08644025 Client: The Beck Group Attn: Oillett Berger ..1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Report No.: Project No.: Project: 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 9902392 Report Date 02/16/1999 43-2333-98 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. con'rgacrom BECK CONCRETE SUPPLIER: TXI PL.~Vr: 41 SPECIFICATION m?X/UnU~,MEnTS grmg,~x~: 5000 psi @ 28 Days SLUMP: 6.0" Max A~ N/A ~ MmniOO: ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: M,5 @ 9.3 PROJECT DATA CONCaETE CLASS: 154 PLACEMENT DATE: 01/18/1999 BATCH TIME: 5:31am TIME SAMPLED: 6:00am BY: Mike Odom WEATHER CONDrrloNS: TEMPERATURE (F). AIR TRUCK NO: 45 1 AIR CO~ (%): N/A PLACEMENT LOCATION: See page 1 Fair 41 g CONCRWrE: 59 F Ticr~-'r No: 1216878 uNrr wE~Gtrr (pm: N/A REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 3 1 5.75 01/20/1999 2 119380 ACCUMULATIVE YARDS: 540 COMPRF. SSIVI~ STRENGTH FRACTURE (psi) TYPE 4220 3 2 5.75 01/21/1999 3 137730 4870 3 3 5.75 01/25/1999 7 167940 5940 3 4 5.75 01/25/1999 7 178940 6330 Average 6140 3 5 5.75 02/1511999 28 224460 7940 3 6 5.75 02/15/1999 28 217840 7700 Average 7820 OILL This vcpott is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, inc. Page 5 of 10 CYLINDER MEASURED MAXlbP, JM 'COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (ia~es) TESTED (days) 0b~ force) (pd) TYPE 3 7 5.75 03/15/1999 56 This repo~ is exclusively for the use of the client indicated above and shall not In reproduced except in full without ~he written approval of HBC Engineering, Inc. OILL Page 6 of 10 CONCRETE COMPRESSIVE STRENGTH TEST Date of Service: Client No.: Client: 01/18/1999 08644025 The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Report No.: Project No.: Project: 8901 Carpenter Frwy., Suite #100 Dalla~ T~m 75247 9902392 Report Date 02/16/1999 43-2333-98 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. cot, tractoR: BECK CONCR~FE SUPPLIER: TXI PLAl~rr: 41 S~Cn~CAT~ON ~o~: 5~ psi ~ 28 Days SL~: 6.0" Max ~ N/A ~ ~iOD: ASTM C- t43 AS~ C-t72 AS~ C-39 SAMPLE LOCATION: G.5 @ 10 CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 4 1 6.00 4 2 6.00 4 3 6.00 4 4 6.00 4 5 6.00 4 6 6.00 DATE TESTED 01/20/1999 01/21/1999 01/25/1999 01/25/1999 02/15/1999 02/15/1999 PROJECT DATA CONCRETE CLASS: 154 PLACEMENT DATE: 01118/1999 BATCH TIME: 6:41am TIME SAMPLED: 7:05am BY: Mike Odom WEATItER CoNDmoNs: TEMPERATUI~ (F). AIR ~UCKNO: 803 Am CO~ (~): N/A P~C~ LOCATION: S~ ~ge I Fair 39 F CONCRE'~: 61 F TICK~ NO: 1216946 tmrr w~ion'r (pa):. N/A REPORT OF TESTS AGE LOAD (days) (lbs. force) 2 122120 ACCUMULATIVE YARDS: 540 COMPRESSIVE STRENGTH FRACTURE (~i) TYPE 4320 3 130050 4600 7 170860 6040 7 184000 6510 Average 6280 28 215500 7620 28 240860 8520 Average 8070 0ILL This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc. Page 7 of 10 l~ep~r~ No.: 9902392 MARKED SLUMP DATE AGE SET NO. ¢~s) TESTED (days) 4 7 6.00 03/15/1999 56 No water added. MAXIMUM ' COMPRESSIVE LOAD STRENGTH FRACTURE Obs. force) (pM) TYPE This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 8 of 10 C ONCRF. TE COMPRESSIVE STRENGTH TESrl Date of Service: 01/18/1999 Report No.: Client No.: 08644025 Project No.: Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 9902392 43-2333-98 8901 Carpenter Frwy., Suite #100 Dairy_; T,~*~ 75247 Report Date 02/16/1999 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. con'rRAcroa: BECK CONCRETE SUPPLIER: TXI P~nivr: 41 SPECnVCAT~On REQUlm~ ~a~: 5~ psi ~ 28 Days sc~: 6.0" M~ AIR: N/A ~ ~o~: ASTM C- 143 AS~ C-172 ASTM C-39 SAMPLE LOCATION: E.5 ~ 12 PROJECT DATA CONCRETE CLASS: 154 PLACEMENT DATE: 01/18/1999 BATCH TIME: 8:09am TZM~SAMPL~: 8:35am BY: Mike Odom WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK~O: 802 AIR co~rrgN'r (~): N/A PLACF, MF.,NT LOCATION: See page I Fair 41 v CONCh: 61 v Ticr~r No: 1217130 t~rr WEZGtrr (p--0: N/A CYLINDER MEASURED MARKED SLUMP SET NO. 0aches) 5 1 5.75 5 2 5.75 5 3 5.75 5 4 5.75 5 5 5.75 5 6 5.75 REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (ll~. force) 01/2011999 2 118610 01/2111999 3 137060 01/25/1999 7 158430 01/25/1999 7 161470 Average 02/15/1999 28 230760 02/15/1999 28 219450 Average ACCUMULATIVE YARDS: 540 COMPRESSIVE STRENGTH FRACTURE (l~i) TYPE 4190 4850 5600 5710 5660 8160 7760 7960 This report is exclusively for thc use of thc client indicated abovc and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc. OILL Page 9 of 10 Report No.: 9902392 CYLINDER MEASURED MARKED SLUMP DATE SET NO. (h~he~) TESTED 5 7 5.75 03/15/1999 Ten (10) gallons of water added. AGE (dm) 56 MAXIMUM LOAD (ll~. force) · COMPRESSIVE STRENGTH Technician: Mike Odom Report Distribution: (1) Tbe Beck Group (1) Gromatzky Duple & Assoc. (!) Brockette Davis Drake, inc. (I) The Beck Group Started: 2:00am (1) The Beck Group (1) Dalcan, Inc. Finished: lO:OOam Engineering, Inc. Eugene Harbour Vice President This report is exclusively for the use of tbe client indicated above and shall not be reproduced except in full without lhe written approval of HBC Engineering, Inc. OILL Page 10 of 10