Verizon-LR 990215 .
CONCRETE COMPRESSIVE STRENGTH TEST
Date of Service: 02/0411999 Report No.:
Client No.: 08644025 Project No.:
IBC
8901 Carpenter Frwy. Suit~ #100
Dall~, Tex~ 7$247
9904095 Report Date
02/15/1999
43-2333-98
Client: The Beck Group Project:
Atto: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
COnTac'rom BECK
CONCRETE SUPPLIER: TXI
PL~rr: 41
SPECIFICATION REQUIREMENTS
STRENa~: 5000 psi @ 28 Days
SLUMP: 6.0" Max
Am: N/A
T~T M~'mOO: ASTM C- 143
ASTM C-172
ASTM C-39
PROJECT DATA
coNcg~r~ cLAss: 8208 .
PLACEMENT DATE: 02/04/1999 BATCH TrME: 2:13pm
TIM~SAMPLED: 3:00pm BY: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 712
Am CONTENT (~): N/A
PLACEMENT LOCATION:
Fair
71 F CONCRETE: 74
TICKgT NO: 123209
UNIT W'E~GHT (P~0:. N/A
Area C, Level ! building, columns O F&G @ 16, 17, 18
SAMPLE LOCATION: F @ 16
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
(inches)
1 1 5.75
1 2 5.75
1 3 5.75
I 4 5.75
REPORT OF TESTS
DATE
TESTED
02/1111999
02/1111999
0310411999
03104/1999
AGE
(days)
7
7
28
28
MAXIMUM
LOAD
(lbs. for~e)
142790
147000
Avernge
ACCUMULATIVE YARDS:
COMPRESSIVE
STRENGTH
(p~i)
5050
5200
5130
13
1 5 5.75
04/01/1999
56
Twenty (20) gallons
Technician: Mike (3dom
Report Distribution:
(1) Th~ Beck Gmap
(1) Gromatzky Dupree & Assoc.
(1) Brockeue Davis Drake, lac.
(!) Thc Beck Group
of water added.
Started: 3:00pm
(i) Th~ Beck Group
(I) Dalcan, Inc.
Finished: 4:00pm
Vice President
This repo~ is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page I of 1
CONCRETE COMPRE :SIVE STRENGTH TEST
Date of Service: 02/04/1999
Client No.: 08644025
Client:
The Beck Group
Attn: Oillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Report No.:
Project No.:
Project:
.8.901 Carpenter Frwy., Suite #100
DaHan, T~ 75247
9904094 Report Date
02/15/1999
43-2333-98
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONT~A~Om BECK
CONCI~TE SUPPLIER: TXI
PL~Wr: 41
SPECIFICATION REQUIREMENTS
STRENGTIi: 4000 psi ~ 28 Days
SL~: 6.0" Max
Am: N/A
~ M~Om ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION:
See below
PROJECT DATA
CONCg~r~ Ct. ASS: 9508
PLACEMENT DATE: 02/04/1999 BATCH TIME: h59pm
TIME SAMPLED: 2:30pm BY: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 639
Am cot~rr~t~rr (~): N/A
PLACEMENT LOCATION:
Fair
71 F CONCretE: 73
TICK~'r NO: 1232071
UNIT WEIGHT (pcf).: N/A
Loading dock outside retaining wall interior dock ramp walls @ Area A building 1
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inches)
I 1 5.50
1 2 5.50
1 3 5.50
1 4 5.50
DATE
TESTED
02/11/1999
02/11/1999
REPORT OF TESTS ACCUMCn. A VE YA U,S: 20
MAXIMUM COMPRESSIVE
AGE LOAD STRENGTH
(days) (lbs. force) (psi)
7 128150 4530
7 132020 4670
Average 4600
0310411999
0310411999
28
28
FRACTURE
TYPE
I 5 5.50
04/0111999
56
Sample location:
Technician: Mike Odom
Report Distribution:
(1) The Beck Group
(!) Gromatzky Dupree & Assoc~
(1) Brockette Davis Drake, Inc.
(1) The Beck Group
Outside
wall ~ W end S dock
Started: 2:00pm
(1) The Beck Group
(I) Dalcan, Inc.
Finished: 3:00pm
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without thc written approval of H BC Engineering, lac.
0ILL Page I of I
CONCRETE COMPRESSIVE STRENGTH TEST
Date of Service: 12/17/1998
Report No.: 9833992
Client No.: 08644025
Project No.: 43-2333-98
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
02/15/1999
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800.
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOm BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
STRENGTh: 5000 psi @ 28 Days
SLUMP: 6.0" Max
AIR: N/A
TE~ ME'niOO: ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: Beam G-8 on Linc 6 @ B.5
PROJECT DATA
CONCRETE CLASS: 8208
PLACEMENT DATE: 12/17/1998 aATCI-i T~E: 2:16am
TIME SAMPLED: 3:25am aY: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 456
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
Level Il bide slab, Lines 5-10, A-D &
N-K, 9-10, E-H, 11-13
Fair
38 F CONCRETE: 63 F
TICKET NO: 1199903
UNIT WEIGIIT (pcf}.; N/A
REPORT OF TESTS ACCUMULATIVE YARDS: 500
CYLINOER MeASUREO MAXrMOM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inch.) TESTED (days) (lbs. force) (psi) TYPE
I 1 5.75 12/19/1998 2 79060 2800
I 2 5.75 12/20/1998 3 114570 4050
1 3 5.75 12/24/1998 7 155880 5510
I 4 5.75 12/24/1998 7 154200 5450
Average 5480
I 5 5.75 01/14/1999 28 194840 6890
I 6 5.75 01 / 14/! 999 28 186750 6600
Average 6750
IIILL
This reporl is exclusively for the use of the client indicated above and shall not b~ reproduced except in full without the written approval of HBC Engineering, Inc.
Page 1 of 10
Report No.: 9833992 ~-]~
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRF~. GTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 7 5.75 02/11 / 1999 56 226180 8000
0ILL
This repo~ is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 2 of 10
ONCRETE COMPRESSIVE STRENGTH TEST
Date of Service: 12/17/1998 Report No.:
Client No.: 08644025 Project No.:
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
9833992 Report Date
02/15/1999
43-2333-98
Client:
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas '
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
STRENGTll: 5000 psi @ 28 Days
SLtnViP: 6.0" Max
AIR: N/A
TEST METIIOD: ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION:
A.5 to 6.5
PROJECT DATA
CONCggTg cLAss: 8208
PLACEMENT DATE: 12/17/1998 BATCH TIME: 4:33an
TIME SAMPLED: 5:10am BY: Mike Odom
WEATItER CONDITIONS:
'rgMPERATURE (F)- AIR
T~UCKNO: 837
AIR CONTENT (%): !.6
PLACEMENT LOCATION:
Ste placement location
Fair
37 F CONCRETE: 67 F
TICKET NO: 1199969
UNIT WEIGItT (pcf)j N/A
REPORT OF TESTS ACCUMULATIVE YARDS: 500
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MA RKED SLUMP DATE A G E LOAD STRENGTH FRA CTU RE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
2 1 5.50 12/19/1998 2 75080 2650
2 2 5.50 12/20/1998 3 104040 3680
2 3 5.50 12/24/1998 7 151670 5360
2 4 5.50 12/24/1998 7 146510 5180
Average 5270
2 5 5.50 01/14/1999 28 186400 6590
2 6 5.50 01/14/1999 28 179030 6330
Average 6460
0iLl.
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc,
Page 3 of 10
CYLINDER MEASURED MAXI341YM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTII FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (p~i) TYPE
2 7 5.50 02/11/1999 56 216120 7640
OILL
This report is exclusively for ~be usc of thc client indicated above and shall not be reproduced except in full witbout the written approval of HBC Engineering, inc.
Page 4 of 10
ONC TE COMPRESSIVE STRENGTH TEST
Date of Service:
Client No.:
12/17/1998
08644025
{I
Report No.: 9833992
Project No.: 43-2333-98
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
02/15/1999
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
comRAcroR: BECK CONCaE'rE cr~ss: 8208
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 12/17/1998 BATCH T~ME: 5:32am
p~: 41 T~ESAMPLED: 6:30am BY: Mike Odom
SPECIFI~TION ~QUI~ME~ W~IER COme,ONS: Fair
ST~GTH: 5~ psi ~ 28 Days T~E~TU~ (~ - AIR 37 V CONC~: ~ V
SL~: 6.0" Max TRUCK NO: 383 T~CK~ NO: 12~8
AIR: N/A Am CO~ (%): 1.5 UN~ WEIGIIT (poD; N/A
~ ~oD: ASTM C- 143 P~CEME~ LOCATION:
See page 1
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: Line C @ 7.8
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inche~) TESTED
3 1 5.75 12/19/1998
REPORT OF TESTS ACCtm u 'nv YARI)S: 500
MAXE~,IUM COMPRESSIVE
AGE LOAD STRENGTH FRACTURE
(days) (11~. force) (psi) TYPE
2 75210 2660
3 2 5.75 12/20/1998 3 97200 3440
3 3 5.75 12/24/1998 7 135560 4790
3 4 5.75 12/24/1998 7 136680 4830
Average 4810
3 5 5.75 01/14/1999 28 171840 6080
3 6 5.75 01/14/1999 28 161930 5730
Average 5910
0ILL
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 5 of 10
· . ~
Repor~ No.: 9833992 ~
CYLINDER MEASURED
MARKED SLUMP DATE AGE
SET NO. (inches) TESTED (days)
MAXIMUM COMPRESSIVE
LOAD STRENGTIt FRACTURE
(lbs. force) (psi) TYPE
3 7 5.75 02/11/1999 56 203540 7200
This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
OILL Page 6 of 10
CONCRETE COMP IVE STRENGTH TES'
Date of Service:
Client No.:
12/17/1998
08644025
I
Report No.: 9833992
Project No.: 43-2333-98
8901 Carpenter Frwy., Suite #100
" Dallas, Texas 75247
Report Date
02/15/1999
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-~619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
COt,rrRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
s'ra~G~: 5000 psi @ 28 Days
SLtnVa': 6.0" Max
AIR: N/A
TEST M~rHOO: ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: ~ M.5 @ 9.5
PROJECT DATA
CONCRETE CLASS: 8208
PLACEMENT DATE: 12/1711998 BATCIt TLME: 6:33am
TIME SAMPLED: 7:30am BY: Mike Odom
WEATIIER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 834
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
See page I
Fair
37 F CONCRm~: 66 g
TICKer NO: 1200105
UNIT WEIGHT (pcf~: N/A
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
4 1 5.50 12/19/1998 2 65350
4 2 5.50 12/20/1998 3 98240 3470
4 3 5.50 12/24/1998 7 142840 5050
4 4 5.50 12/24/1998 7 144220 5100
Average 5080
4 5 5.50 01/14/1999 28 202480 7160
4 6 5.50 01/14/1999 28 194720 6890
Average 7030
ACCUMULATIVE YARDS: 500
COMPRESSIVE
STRENGTH FRACTURE
(psi) TYPE
~ · 2310
0ILL
This report is exclusively for tim use of thc client indicated ahovc and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 7 of 10
· kepo~'t No.:
CYLINDER
MARKED
SET NO.
4 7
9833992
MEASURED
SLUMP
(inches)
5.50
DATE
TESTED
02/11/1999
AGE
(days)
56
MAXIMUM
LOAD
(lbs. force)
218660
COMPRESSIVE
STRENGTH
7730
FRACTURE
TYPE
This report is exclusively for the use of the client indicated above and shall not be reproduced except in fall without the written approval of HBC Engineering, Inc.
OILL Page 8 of 10
C'oNCRETE COMPRESSIVE STRENGTH TEST
8901 Carpenter Frwy., Suite #100
" Dallas, Texas 75247
Date of Service: 12/17/1998 Report No.: 9833992 Report Date
02/15/1999
Client No.: 08644025 Project No.: 43-2333-98
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
coNTRAc'rom BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
STRENGTH: 5000 psi @ 28 Days
SLtrM~: 6.0" Max
AIR: N/A
TEST METIIOO: ASTM C- 143
ASTM C-172
ASTM C-39
SAMPLE LOCATION:
E.5 @ 12 (G-25)
PROJECT DATA
CONCRETE CLASS: 8208
PLACEMF.2qT DATE: 12/17/1998 BATCH TIME: 8:22am
TIME SAMPLED: 8:50am BY: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F). AIR
TRUCK NO: 642
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
See page I
Fair
45 F CONCRETE: 61 F
TICKET NO: 1200268
UNIT WEIGHT (pcf): N/A
REPORT OF TESTS ACCUMULA V YARDS: 500
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTtl FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
5 I 5.25 12/19/1998 2 70290 2490
5 2 5.25 12/20/1998 3 86110 3050
5 3 5.25 12/24/1998 7 144740 5120
5 4 5.25 12/24/1998 7 146640 5190
Average 5160
5 5 5.25 01/14/1999 28 189040 6690
5 6 5.25 01/14/1999 28 185340 6550
Average 6620
This report is exclusively for the use of the client indicated above and shall not be I~produeed except in full without the written approval of HBC Engineering. Inc.
0ILL Page 9 of 10
,pe, d o.:
CYLINDER
MARKED
SET NO.
9833992
MEASURED
SLUMP
5 7 5.25
DATE
TESTED
02/11/1999
AGE
(days)
56
MAXIMUM COMPRESSIVE
LOAD STRENGTH FRACTURE
(lbs. force) (p~i) TYPE
190970
6750
Technician: Mike (3dom
Report Distribution:
(1) The Beck Group
(1) Gromatzky Duprec & Assoc.
(I) Brockcttc Davis Drake, Inc.
(I) The Beck Group
Started: 2:00am
(I) Thc Beck Groop
(i) Dalcan, lac.
Finished: 10:00am
~ Engin g~,Inc.
Eugene Harbour
Vice President
This report is exclusively for thc use of thc client indica~d above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc.
0ILL Page 10 of 10
C'O CRETE COMPRE IVE STRENGTH TES'I'
8901 Carpenter Frwy., Suite #100
Dall~, Texas 752.47
Date of Service: 01/15/1999 Report No.: 9902254 Report Date
02/15/1999
Client No.: 08644025
Project No.: 43-2333-98
Client:
The Beck Group
Attn: Oilier Berger
1700 Pacific Ave., Suite 3800
Dallas 'TX 75201-4619
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain .samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
co~xnc'm~: BECK
coNcP, gTE SOPrLmR: TXI
pLANT: 41
s~c~cnx~o~
s~a~: 4~ psi ~ 28 Days
SL~P: 6.0" Max
Am: 3~%
~ ~ov: ASTM C-143
AS~ C-172
AS~ C-39
PROJECT DATA
coNcazTE cLAss: 8205
PLACEMENT DATE: 01/15/1999 BATCH TIME: 3:21am
TIME SAMPLED: 3:45am BY: Mike Odom
WEATm~R CONDmONS:
TEMPERATURE (F). AIR
TRUCK NO: 714
AIR CONTENT (%): 5.8
PLACEMENT LOCATION:
Fair
32 r CONCRETE: 57 r
TICKET NO: 1215486
UNIT WEIGHT (pc0: N/A
East side paving quadrant along outside east side fire lane
SAMPLE LOCATION: See below
REPORT OF TESTS
CYLINDER MEASURED MAXIblUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inch.) TESTED (days) (lbs. force)
I I 5.25 01122/1999 7 104890
I 2 5.25 01/22/1999 7 96310
Average
I 3 5.25 02/12/1999 28 148940
1 4 5.25 02/12/1999 28 155200
Average
1 5 5.25 03/12/1999 56
ACCUMULATIVE YARDS: 440
COMPRESSIVE
STRENGTH
(psi)
3710
3410
3560
5270
5490
5380
FRACTURE
TYPE
Sample location: Entrance lane, between 2nd and 3rd bullnose from south end.
OILL
This rcpofl is exclusively for the use of the client indicated ahovc and shall not bc reproduced except in full without thc written approval of HBC Engineering, Inc.
Page I of 4
CONCRETE COMPRESSIVE STRENGTH TES'I*
Date of Service: 01/15/1999
Client No.: 08644025
Client: The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Report No.:
Project No.:
Project:
8.901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
9902254 Report Date
02/15/1999
43-2333-98
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
com'ancrom BECK
CONCRETE SUPPLIER: TXI
P~'r: 41
SPECIFICATION REQUIREMENTS
STRgl~TIt: 4000 psi @ 28 Days
SLU~P: 6.0" Max
Aim 3-6%
Tg~r M~mOD: ASTM C-143
ASTM C-172
ASTM C-39
SAMPLE LOCATION:
See below
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inebs$)
2 I 6.00
2 2 6.00
2 3 6.00
2 4 6.00
PROJECT DATA
CONCggTg CLASS: 8205
PLACEMENT DATE: 01/15/1999 BATCH TIME: 4:47am
TIMES/tM. PLED: 5:15am BY: Mike Odom
WEATHER COHDITIONS:
TEMPERATURE (F) - AIR
'mUCK NO: 714
Am cowr~lvr (~): 4.9
PLACEMENT LOCATION:
See page I
REPORT OF TESTS
MAXIMUM
DATE AGE LOAD
TESTED (days) (lbs. force)
01/22/1999 7 100100
01/22/1999 7 105440
Average
02/12/1999 28 159720
02/12/1999 28 153780
Average
Fair
32 F CONCRETE: 55 F
TICKET NO: 1215571
UNIT WEIGHT (pc.O: N/A
2 5 6.00 03112/1999 56
ACCUMULATIVE YARDS: 440
COMPRESSIVE
STRENGTH
(psi)
3540
3730
3640
5650
5440
5550
Sample location: Exit lane and 5th north, ward bull nose from south end
FRACTURE
TYPE
OILL
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without thc wriaen approval of HBC Engineering, inc.
Page 2 of 4
CONCRETE COMPRESSIVE STRENGTH TES r
Date of Service: 01/15/1999 Report No.:
Client No.: 08644025 Project No.:
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
8.901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
9902254 Report Date
02/15/1999
43-2333-98
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
COt~RACTOR: BECK
CONCRETE SUPPLIER: TXI
PLAWr: 41
SPECIFICATION REQUI~
SXaZNG'm: 4000 psi @ 28 Days
SLUMV: 6.0" Max
AIR: 3-6%
TZST t, ma~OD: ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: See below
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (laclm) TESTED
3 1 5.00 01/22/1999
3 2 5.00 01/22/1999
3 3 5.00 02/12/1999
3 4 5.00 02/12/1999
PROJECT DATA
CONCREaX Ct.ASS: 8205
PLACl~IENT DATE: 01/15/1999 BATCH TIME: 5:40am
TIME SAMPLED: 6:20am BY: Mike Odom
WEATImR CONDrrlONS: Fair
TEMPERATURE (F) - AIR 34 F CONCRETE: 57 F
TRUCKNO: 806 TICKETNO: 1215633
Am cOWrENT (%): 4.8 uNrr WEIGHT (pcf).~ N/A
PLACEMENT LOCATION:
See page I
REPORT OF TESTS acct e, LaTIvE YARDS: 440
MAXIMUM COMPRESSIVE
AGE LOAD STRENGTH
(days) (ll~. force) (psi)
7 123350 4360
7 118730 4200
Average 4280
28 144280 5100
28 150670 5330
Average 5220
3 5 5.00 03112/1999
Sample location: Between 7th and 8th
56
FRAC~SRE
TYPE
bull nose northward from south end
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 3 of 4
CONCRETE COMPRESSIVE STRENGTH TESI''
Date of Service: 01/15/1999
Client No.: 08644025
I I ·
Report No.: 9902254
Project No.: 43-2333-98
8901 Carp~nte~ Frwy., Suite #I00
Dallas, Texas 75247
Report Date
02/15/1999
Client: The Beck Group
Atto: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Project:
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, p~rform required field test and cast
compressive strength samples.
COnTaACXOR: BECK
CONCa~'r~stU'PLmR: TXI
rL~rr: 41
SPEC~CA~ON ~Q~~
s~a~: 4~ psi ~ 28 Days
SL~: 6.0" Max
~Im 3~%
~~oo: AS~ C-143
AS~ C-172
AS~ C-39
PROJECT DATA
CONCRg'r~ ct.ass: 8205
rt~cnz~vr Da~: 01/15/1999 BATCH TIME: N/A
'rn~SA~'L~O: 7:25am BY: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F). AIR
TRUCK NO: 450
Am CONTENT (~): N/A
PLACI~iENT LOCATION:
Fair
34 r CONC~r~: 55 V
TIcKer NO: 1215718
Unit w~la~rr (~0.~ N/A
SAMPLE LOCATION: See below
CYLINDER MEASURED
MARKED SLUMP
SET NO. (Inch.)
4 1 5.75
4 2 5.75
4 3 5.75
4 4 5.75
4 5 5.75
DATE
TESTED
01/22/1999
01/22/1999
02/12/1999
02/12/1999
REPORT OF TESTS ACCU T VZ YARDS: 440
MutXIlVlUM COMPRESSIVE
AGE LOAD STRENGTH
(days) (lbs. force) (psi)
7 91170 3220
7 89680 3170
Average :3200
28 167710 5930
28 163110 5770
Average 5850
03/12/1999
56
Five (5) gallons of
Technician: Mike Odom
Report Distribution:
(1) The Beck Group
(i) Gromatzky Duprec & ASSOC.
(I) Brockette Davis Drake, Inc.
(I) The Beck Group
water added.
Started: 2:00am
(1) Thc Beck Group
(i) Dalcan, Inc.
Finished: 8:30am
H~ Enginee ,~Inc.
Eugene Harbour
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 4 of 4
CONCRETE COMPRESSIVE STRENGTH TEST
Date of Service: 12/18/1998
Client No.: 08644025
Report No.:
Project No.:
8901 Carpenter Frwy., Suite #100
Dallas, Texa~ 75247
I
9834074 Report Date
02/15/1999
43-2333-98
Client: The B~k Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONT~CTOm BECK
CONCRETE ~PPLIEIta TXI
PLA~: 41
S~C~ON ~UI~
~sa~: 5~ psi ~ 28 Days
SL~: 6.0" Max
A~ N/A
~ ~OD: AS~ C- 1~
ASTM C-172
ASTM C-39
SAMPLg LOCATION: A @ 7
CYLRqDER
MARKED
SET NO.
MF..ASURED
SLUMP
(inches)
1 1 9.00
I 2 9.00
I 3 9.00
1 4 9.00
I 5 9.00
DATE
~D
12/2111998
PROJECT DATA
CONCP. m~ CLASS.', 8208
PLACEMENT DATE: 12/18/1998 BATCH TIME: l:27pm
TUVIESAMI'LED: 2:30pm aY: Mike Odom
WEATHER CONDITIONS: Rain
TEMPE~TURE~-AIR 49 g CONCRETE: 58 F
TgUCIC NO: 471 TICKET NO: 1202068
AIR CONTENT (%): 1.9 UNrr WEIGHT (pcO:. N/A
PLACEMENT LOCATION:
I.~vel II.11I- 13 Columns A, B & C @ 7, N-9, 9.3, M-9, 9.3, A, B @ 8, L-9, 9.3, K-9, K-9.3
REPORT OF TESTS ACCUMULATIVE YARDS: 36
MAXIMUM COMPRESSIVE
AGE LOAD STRENGTH FRACTURE
(days) (lbs. force) (psi) TYPE
3 63980 2260
12/2511998
01/15/1999
01/15/1999
02/12/1999
7 152670 5400
28 191810 6780
28 186860 6610
Average 6700
56 202890 7180
OILL
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wriuen approval of HBC Engineering, Inc.
Page I of 2
9834074
Note: Raining in pump hopper in mixer
physically slumped ~ 9, 8 1/2 inches.
trucks
at site,
all three loads
Technician: Mike Odom
Report Distribution:
(1) The Beck Group
(I) Gromatzky Dupree & Assoc.
(I) Brockette Davis Drake, Inc.
(I) The Beck Group
SU-,r~: l:OOpm
(!) The Beck Group
(I) Dalcan, Inc.
Finished: 6:00pm
~ Engin~c.
Eugene Harbour
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 2 of 2
CONCRETE COMPRESSIVE STRENGTH TEST'
8901 Carpenter Frwy., Suite #100
Dallas, Texas 7S247
Date of Service: 12/1811998 Report No.: 9834073 Report Date
02/1511999
Client No.: 08644025 Project No.: 43-2333-98
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
cot~rrancToa: BECK
CONCRETE SUPPLIER: TXI
PLAwr: 41
SPECIFICATION REQUIREMENTS
STRENaTm 4000 psi @ 28 Days
SLUMP: 6.0" Max
AIR: 3-5%
TEST M~IOO: ASTM C- 143
ASTM C-172
ASTM C-39
SAMPLE LOCATION:
Sec below
CYLINDER
MARKED
SET NO.
I 1
1 2
MEASURED
SLUblP
(inches)
6.25
6.25
6.25
6.25
6.25
1 3
I 4
I 5
Sample location: Bay 3,
PROJECT DATA
CONCRETE CLASS: 8205
PLACEMENT DATE: 12/1811998 BATCH TIME: 3:07am
TIME SAMPLED: 3:5am BY: Mike Odom
WEATImR CONDmONS: Cloudy
TEblPERATURE (~ - AIR 47 g CONC~TE: 67 g
TRUCK NO: 834 TICKET NO: 1201177
Am CONTENT (%): 4.6 uNrr WEIGHT (pcf~ N/A
PLACEMENT LOCATION:
No~h paving quadrant slab-on-grade bay 2 & 3, 4 & 5
REPORT OF TESTS ACCUMULATIVE YARDS: 600
MAXIMUM COMPRESSIVE
DATE AGE LOAD STRENGTH
TESTED (days) Obs. force) (psO
12/25/1998 7 78880 2790
12/25/1998 7 79240 2800
Average 2800
01/15/1999 28 109780 3880
01/15/1999 28 102330 3620
Average 3750
02/12/1999 56 171780 6070
50' South from centerline north driveway.
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc.
0ILL Page 1 of 7
ONCRETE COMPRESSIVE STRENGTH TEST
8901 Carpenter Frwy., Suite #100
Dallas, T~n~ 75247
Date of Service: 12/18/1998 Report No.: 9834073 Report Date
02/15/1999
Client No.: 08644025 Project No.: 43-2333-98
Client:
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONT~CTOm BECK
CONC~ETESUPPLXER: TXI
PLANT: 41
SPECWm~O~
~~: 4~ psi ~ 28 Days
SL~P: 6.0" Max
~l~ 3-5%
~ ~oo: ASTM C- 143
ASTM C-172
ASTM C-39
PROJECT DATA
CONC~'r~ C~SS: 8205
PLACEMENT DATE: 12/18/1998 BATCH TIME: 4:25am
TIME SAMPLED: 4:45am BY: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE CF) - AIR
TaUCK No: 463
AIR CONTENT (%): 4.5
PLACEMENT LOCATION:
5ce page I
Cloudy
47 }' CONCRETE: 66 F
TXC~CET NO: 1201214
UNIT WEIOirr (pc0s N/A
SAMPLE LOCATION: See below
REPORT OF TESTS ACCUMULATIVE YARDS: 600
c-a. E Mp. su coMPzzssrvE
MARKED SLUMP ' DATE AGE LOAD STRENGTH
SET NO. (inches) TF, STED (days) (lbs. force) (psi)
2 1 5.75 12/25/1998 7 102400 3620
2 2 5.75 12/25/t998 7 99880 3530
Average 3580
2 3 5.75 01/15/1999 28 111540 3940
2 4 5.75 01/15/t999 28 120710 4270
Average 4110
2 5 5.75 02/12/1999 56 167510 5920
FRACTURE
TYPE
Sample location: Bay 2, 35' South from centerline north driveway and 40' west
from centerline bay 2.
0ILL
This report is exclusively for ~e use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 2 of 7
CONCRETE COMPRESSIVE ST NGTH TEST
Date of Service: 12/18/1998
Client No.: 08644025
Client: The Beck Group
Attn: Gillett Berger
· 1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report No.: 9834073 Report Date
02/15/1999
Project No.: 43-2333-98
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONT~Crom BECK
CONCRETgSUln'LmR: TXI
~LA~r: 41
SPECIFICATION REQUIREMENTS
ST~NOTm 4000 psi @ 28 Days
SLUM~: 6.0" Max
Am: 3-5%
TEST ME'rHOD: ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION:
See below
PROJECT DATA
CONCgETv- CLASS: 8205
PLACEMENT DATE: 12/1811998 BATCH TIME: 5:38am
TIME SAMPLED: 6:35am aY: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F). AIR
TRUCKNO: 461
AIR CONTENT (~): 4.8
PLACEMENT LOCATION:
See page I
Cloudy
47 F CONC~-'rE: 63 F
TICKETNO: 1201267
UNIT WEIGIIT(~0~N/A
REPORT OF TESTS ACCUMULATIVE YARDS: 600
CYLINDER MEASURED MAKLMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH
SET NO. (inches) TESTED (days) (lbs. force) (psi)
3 1 6.50 12/25/1998 7 103080 3650
3 2 6.50 12/25/1998 7 101840 3600
Average 3630
3 3 6.50 01/15/1999 28 140160 4960
3 4 6.50 01/15/1999 28 133990 4740
Average 4850
3 5 6.50 02/12/1999 56 148300 5240
FRACTURE
TYPE
Sample location: Bay 3- 15' West from east edge and 120' north from centerline
north fire lane.
0ILL
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 3 of 7
CONCRETE COMPRESSIVE STRENGTH TEST'
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
Date of Service: 12/18/1998 Report No.: 9834073 02/15/1999
Client No.: 08644025 Project No.: 43-2333-98
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
cot~rnO, CTOR: BECK CONCRETE CLASS: 8205
CONCRETE SUPPLIER: TXI PLACEMENT DAT~: 12/18/1998 BATCH TIME: 7:10am
PLANT: 41 TIME SAMPLED: 7:40am BY: Mike Odom
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy
ST~t~GXH: 4000 psi @ 28 Days T~rm,~l~nTtn~ (~3- AlS 48 F cot~cRE-r~: 62 F
SLtmn,: 6.0" Max TaUCK NO: 462 aUCK~'r ~o: 1201364
AIR: 3-5% AIa cot~wr (~): 4.9 UNIT WEIGHT (pcf):. N/A
PLACEMENT LOCATION:
TF~r M~'r~oo: ASTM C- 143 see page I
ASTM C- 172
ASTM C-39
SAMPLE LOCATION:
See below
REPORT OF TESTS ACCUMULATIVE YARDS: 750
CY~ZR M~SURED M~.X~ co~PRE.ss~w
MARKED SL~P DA~ AGE LOAD S~G~
S~ NO. (~) ~D (days) (1~ force) (~)
4 I 6.~ 1~5/1998 7 103890 3670
4 2 6.~ 1~5/1998 7 99340 3510
Avenge 3590
4 3 6.~ 01/15/1999 28 133430 4720
4 4 6.~ 01/15/1999 28 129470 4580
Avenge 4650
4 5 6.~ 0~I~1999 56 149560 5290
FRACTURE
TYPE
Sample location: Bay 3- 25' west from east edge and 100' north from centerline
north fire lane.
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 4 of 7
ONCRETE COMPRES SIVE STRENGTH TEST
8~01 Carpenter Frwy., Suite #100
Dallas, Texas 7~247
Report
Date
Date of Service: 12/18/1998 Report No.: 9834073
02/1511999
Client No.: 08644025 Project No.: 43-2333-98
Client: The Beck Group Project:
Attn: Gillett Better
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
co.mAcros: BECK
CONCRETE SUPPLIER: TXI
e~,rrr: .41
SPgCIFICATION REQUIREMF, N'~
s~.~'m: 4000 psi @ 28 Days
SLtrMV: 6.0" Max
AIR: 3-5%
T~qT M'a~IOD: ASTM C- 143
ASTM C-172
ASTM C-39
PROJECT DATA
coNca~r~ CLASS: 8205
PLACEMENT DATE: 12/1811998 BATCH TIME: 8:24am
TIME SAMPLED: 8:50am BY: Mike Odom
WEATI~R CONDITIONS:
TEMPFAL~TUR~ (F) - AIR
TaUCKNO: 466
AIR CONTE2fr (%): 4.4
PLACEMENT LOCATION:
See page 1
Cloudy
50 g CONCRETE: 62 F
TICKET NO: 1201524
UNIT WEIGHT (pcf).~ N/A
SAMPLE LOCATION: See below
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inches)
5 1 5.50
5 2 5.50
5.50
5.50
5.50
5 3
5 4
5 5
Sample location: Bay 3,
north fire lane.
REPORT OF TESTS
MAXIMUM
DATE AGE LOAD
TESTED (days) (lbs. force)
1212511998 7 118790
12/25/1998 7 115140
Average
01/15/1999 28 153690
01/15/1999 28 147560
Average
02/12/1999 56 164650
ACCUM-t/LATIVE YARDS: 750
COMPRESSIVE
STRENGTH
4200
4070
4140
5440
5220
5330
5820
FRACTURE
TYPE
30' west from east edge and 55'north from centerline
This report is exclusively for the use of the client indicated above and shall not be tz~produced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 5 of 7
CONCRETE COMPRESSIVE STRENGTH TEST
Date of Service:
Client No.:
12/1811998
08644025
I
Report No.: 9834073
Project No.: 43-2333-98
.8.901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
O2/1511999
Client:
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CO~CTOR: BECK
CONCRETE SUPPLIER: TXI
PL.4d~: 41
SPECIFICATION REQUIREMENTS
STg~GTH: 4000 psi @ 28 Days
SLUMP: 6.0" Max
Am: 3-5%
TEST METHOD: ASTM C- 143
ASTM C-172
ASTM C-39
PROJECT DATA
CONCREXv. CLASS: 8205
PLACEMENT DATE: 12/1811998 BATCH TIME: 10:08am
TO/mSAMrLr. O: 10:45am aY: MikeOdom
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCKNO: 653
AIR CONTENT (~): 4.7
PLACEMENT LOCATION:
See page ·
Cloudy
50 v coNcRete: 68 v
TICKETNO: 1201737
UNFf WEIGHT (poD: N/A
SAMPLE LOCATION: See below
REPORT OF TESTS ACCUMULATIVE YARDS:
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH
SET NO. (inches) TF~TED (days) (lbs. force) (pa'i)
6 1 5.75 12/25/1998 7 93940 3320
6 2 5.75 12/25/1998 7 102640 3630
Average 3480
6 3 5.75 01/15/1999 28 138880 4910
6 4 5.75 01/15/1999 28 138960 4910
Average 4910
6 5 5.75 02/12/1999 56 141600 5010
750
FRACTURE
TYPE
Sample location: Bay 4, 40' from north edge at cenCerline Bay 4.
This report is exclusively for the use of the client indicated above and shall nol be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 6 of 7
CONCRETE COMPRESSIVE STRENGTH TEST
Date of Service:
Client No.:
12/18/1998
08644O25
I
Report No.: 9834073
Project No.: 43-2333-98
.~901 Carpenter Frwy. Suite #100
Dallas, Texas 75247
Report Date
02115/1999
Client:
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
cowrR~Oa: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECn~ICATION g~QUI~
STa~aXH: 4000 psi @ 28 Days
SLUMP: 6.0" Max
Am: 3-5%
~ ~Om AS~ C- 143
AS~ C- 172
AS~ C-39
PROJECT DATA CONCg~'E C~SS: 8205
PCXCmvmwr DATE: 12118/1998 BATCH TIME: 1 l:30am
TIME SAMPLED: 12:00pm BY: Mike Odom
wg_~Tmmco~romoNs: Drizzle, cloudy
TEM~ER~TURZ(F)-Am 51 g CONCh: 63 F
~CKNO: 835 ~C~O: 1201877
Am co~ (~): 4.9 ~ w~G~ (~: N/A
P~C~ ~CA~ON:
SAMPLE LOCATION: See below
CYLINDER MEASURED
MARKED SLUMP
SET NO. (~nchea)
7
7 2
7 3
7 4
7 5
REPORT OF TESTS ACC~aWE YARDS: 830
MAXIMUM COMPRESSIVE
DATE AGE LOAD STRENGTH
TESTED (days) (lbs. force) (psi)
6.25 12f25/1998 7 96340 3410
6.25 12125/1998 7 98120 3470
Average 3440
6.25 01 / 15/1999 28 129120 4570
6.25 01 / 15/1999 28 133490 4720
Average 4650
6.25 02112/1999 56 141240 4990
FRACTURE
TYPE
Sample location: Bay 5, 10' from east edge
All samples obtained from pump hopper.
Technician: Mike Odom
Report Distribution:
(I) The Beck Group
(I) Gromatzky Duprcc & Assoc.
(1) Brocke~e Davis Drake, lac.
(1) The Beck Group
Started: 2:00am
(I) The Beck Group
(i) Daican, Inc.
and 50'
from north edge.
Finished: 12:30pm
Eugene Harbour
Vice President
This report is exclusively for the use of the client indicated above and shall not b~ reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 7 of 7