Loading...
Verizon-LR 990211CONCRETE COMP IVE STRENGTH TEST Date of Service: 01/13/t999 Client No.: 08644025 Report No.: 9902044 Project No.: 43-2333-98 .8.901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 02/11/1999 Client: The Beck Group Attn: Gillett Bcrger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CO~aACTOa: BECK CONCRgr~sta'PLmm TXI PLANT: 41 SP~CA~ S~~: 5~ psi ~ 28 Days sc~: 6.0" M~ Am: N/A x~ ~om AS~ C- 143 AS~ C-172 AS~ C-39 SAMPLE LOCATION: Column B @ 5 CYLINDER MEASURED MARKED SLUbiP DATE SET NO. (incl~s) TESTED 1 I 6.00 01/14/1999 PROJECT DATA CONCRETE CLA~: 154 PLACEMENT DATE: 01/13/1999 BATCH TUrin: 12:27pm TIME SAMPLED: l:00pm BY: Mike Odom WEATffi~R CONI)mONS: Cloudy TEMPERATURE (F). AIR 44 F CONCRETE: 58 F MUCK NO: 474 TICKET NO: 1214143 AIR coNTEtrr (%): N/A u~rr v~m~rr (tz:0: N/A PLACEMENT LOCATION: Level IV columns (20) Lines 1-5 & A-D, west wing REPORT OF TESTS ACCUMULATIVE YARDS: 45 MAXllVlUM COMPRESSIVE AGE LOAD STRENGTH FRACTURE (days) (il~. force) (psi) TYPE 1 1240O 440 I 2 6.00 01/15/1999 '2 59640 2110 I 3 6.00 01/20/1999 7 123460 4370 1 4 6.00 01/20/1999 7 119710 4230 Average 4300 I 5 6.00 02/10/1999 28 218430 7720 1 6 6.00 02/10/1999 28 237460 8400 Average 8060 This repoa is exclusively for th~ use of the client indicated above and shall not be reproduced excePt in full without Ihe written approval of HBC Engineering, Inc. 0ILL Page I of 2 Repo. rt No.: 9902044 CYMNDER MEASURED MARKED SLUMP DATE set NO. (hw~h~) T.F~I~D 1 7 6.00 0311011999 Note: Columns Dlaced by mud bucket. (days) 56 MAXIMUM LOAD Obs. force) COMPRESSIVE STRENGTH Teehnieisn: Mike Odom Repor~ Distribution: (I) The Beck Group (I) Gromntzky Dupree & Assoc. (I) BrnckeUe Davis Drake, Inc. (I) The B~ck Group Started: 9:30am (I) The Beck Group (I) Dalcan, lac. Finished: 4:30pm ~ Eng~c. Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 2 of 2 CONCRETE COMPRESSIVE STRENGTH TEST Date of Service: 02/03/1999 Client No.: 08644025 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Report No.: Project No.: Project: 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 9903954 Report Date 02/11/1999 43-2333-98 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. coivraacTom BECK CONCl~r~SUl't~-~mm TXI r~m~: 31 SP~C~CA~nO~ REQ~m~M~n's S~NOTH: 5000 psi @ 28 Days SLUIVI~: 6.0" Max AIR: N/A TEST smrHOD: ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: @ A.5 along I.$ CYLINDER MARKED SET NO. MEASURED SLUMP DATE (inches) TESTED I 1 5.50 02/06/1999 PROJECT DATA CONCRETE CLASS: 8208 PLACEMFdqT DATE: 02/03/1999 BATCH T~m: 2:50am TIME SAMPLED: 3:30am BY: Mike Odom WEATHER CONDITIONS: TEMPERATURE (F) - AIR T~UCKNO: 725 Am coNx~rr(~): N/A PLACEMENT LOCATION: Roof slab (Area A) !-5.7, A-D Fair 46 F CONCRETE: 65 F TICKE'r NO: 1229699 t~OX w~Ic~rr (p~.~ N/A REPORT OF TESTS Acctnvm xsw. YARDS: 5 I0 MAXIMUM COMPRESSIVE AGE LOAD STRENGTH FRACTURE (days) (lbs. force) (psi) TYPE 3 103820 3670 I 2 5.50 02/1011999 7 147210 5210 1 3 5.50 02/10/1999 7 155760 55 l0 Average 5360 1 4 5.50 03/03/1999 28 I 5 5.50 03/03/1999 28 I 6 5.50 03/31/1999 56 01LL This report is exclusively for the use of the client indicated above and shall not be rcproduced except in full without the written approval of HBC Engince[ing, Inc. Page I of 10 Report No.: 9903954 Ten (10) gallons of water added. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 2 of 10 CONCRETE COMPRESSIVE STRENGTH TEST Date of Service: 02/03/1999 Report No.: Client No.: 08644025 Project No.: Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave.., Suite 3800 Dallas TX 75201-~19 8.901 Carpenter Frwy., SuRe #100 Dallas, Texas 75247 9903954 Report Date 02/11/1999 43-2333-98 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONT~,CrOR: BECK CONCRETE SUPPLIER: TX[ rLANT: 31 SPECIFICATION REQUIREMENTS STRF~;TH: 5000 psi @ 28 Days SLU~: 6.0" Max AIR: N/A TEST METHOD: ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: Along C line @ 2 CYLINDER MEASURED MARKED SLUMP SET NO. (aw. has) 2 I 5.75 2 2 5.75 2 3 5.75 2 4 5.75 2 5 5.75 2 6 5.75 DATE TESTED 02/06/1999 PROJECT DATA CONCRETE CL,~S: 8208 PLACEMENT DATE: 02/03/1999 BATCH TIME: 4:15am T~ESAMPLRD: 4:50am aY: Mike Odom WEATHER CONDITIONS: TEMPERATURE (F) - AIR T~UCI~O: 736 Am CONTENT (~.): N/A PLACEMENT LOCATION: See page I REPORT OF TESTS AGE LOAD (days) (lbs. force) 3 82490 02/10/1999 02/10/1999 03/03/1999 03/03/1999 Fair 43 F cot~cRE~: 65 v TICKET ~0: 1229738 UNIT WEIGHT (pcf): N/A 03/31/1999 ACCUMULATIVE YARDS: 510 COMPRESSIVE STRENGTH FRACTURE (psi) TYPE 2920 7 151560 5360 7 156850 5550 Average 5460 28 28 56 This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering Inc. 0ILL Page 3 of 10 Report No.: 9903954 Twenty (20) Gallons of water added. 0ILL This report is exclusively for Ihe use of the client indicated above and shall not be reproduced except in fuel without the written approval of HBC Engineering, Inc. Page 4 of 10 . CONCRETE COMPRESSIVE STRENGTH TEST I Date of Service: 02/03/1999 Report No.: 9903954 Client No.: 086~<025 Project No.: 43-2333-98 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 I Report Date 02/11/1999 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallaz TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTg~OR: BECK CONCRETE SU~'Lmm TXI PLAlVr: 31 SPEcn~cATIO~ RZQ~mEM~.N'rS s'rn~'~(;TtX: 5000 psi @ 28 Days SLU~: 6.0" Max Am: N/A TEST ME'mOD: ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: Along A.5 @ 3 CYLINDER MARKED SET NO. MEASURED SLUMP DATE (incbss) TESTED 3 I 6.00 02/05/1999 PROJECT DATA coNc~-'r~ cLAss: 8208 PLACn~mvr DA~: 02/03/1999 BATCti TIM~.: 5:27am TIME S~LED: 6:15am BY: Mike Odom WEATHER CONDITIONS: TEMPERATURE (F) - AIR T~UCK NO: 814 Am co~rr (~): N/A PLACEMENT LOCATION: See page 1 Fair 45 v CONCReTe: 68 r TICKE'r NO: 1229813 UNiT wgmn-r (po')..' N/A REPORT OF TESTS ACCUMULATIVE YARDS: 5 I0 MAXIMUM COMPRESSIVE AGE LOAD STRENGTH FRACTURE (days) (lbs. force) (psi) TYPE 2 88450 3130 3 2 6.00 02/10/1999 7 161960 5730 3 3 6.00 02/10/1999 7 178940 6330 Average 6030 3 4 6.00 03/03/1999 28 3 5 6.00 03/03/1999 28 3 6 5.00 03/31/1999 56 0ILL This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc. Page 5 of 10 Report No.: 9903954 Ten (10) gallons of water added. OILL This repoiX is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 6 of 10 CONCRETE COMPRESSIVE STRENGTH TEST Date of Service: Client No.: 02/0311999 08644025 Report No.: 9903954 Project No.: 43-2333-98 8901 Carpenter Fr~. Suite #100 Dallas, Texas 75247 Report Date 02/1111999 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. co~rranc'roR: BECK CONCRETE SUPPLIER: TXI PLANT: 31 SPECIFICATION REQUIREMENTS STa~GTH: 5000 psi @ 28 Days SCCrsn,: 6.0" Max Am: N/A T~ M~OD: ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: 4.5 @ B CYLINDER MARKFJ) SET NO. MEASURED SLUMP (inches) 4 1 5.75 4 2 5.75 4 3 5.75 4 4 5.75 4 5 5.75 4 6 5.75 DATE TF.~TED 02/0511999 PROJECT DATA cot~cRE'r~ cLAss: 8208 pLAC~Mga~tT DAT~: 02/0311999 BATCH'mYra: 6:43am ~ SAMPLED: 7:40am BY: Mike Odom WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 565 AIR CONTENT (qb): N/A PLACEMENT LOCATION: Sce page I Fair 47 F CONCRETE: 65 V TlCr, z'r No: 1229918 Ut~Tr w~mwr (~c~:~ N/A REPORT OF'TESTS ACCUMULATIVZ YARDS: 510 MAXIMUM COMPRE..qSIVE AGE LOAD STRENGTH FRACTURE (days) (lbs. force) (psO TYPE 2 110340 3900 02/10/1999 02/10/1999 03/03/1999 03/03/1999 03~31/1999 7 155810 7 147560 Average 28 28 5510 5220 5370 56 0iLL This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 7 of 10 l~epg, rt No.: 9903954 Ten (10) gallons of water added. OILL This report is exclusively for tl~ use of ~h¢ client indicated above and shall not be reproduced except in full without the written approval of HBC Engincedng, Inc. Page 8 of 10 CONCRETE COMPRE SSIVE STRENGTH TEST 8.901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 02/0311999 Report No.: 9903954 Report Date · 02/11/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dalla~ TX 75201-4619 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. co~,crom BECK CONCI~TE SUPPLff, R: TXI PLANT: 31 SPECIFICATION REQUIREMENTS s'm~<rm: 5000 psi @ 28 Days SLUMP: 6.0" Max Am: N/A xgs'r Mg'mOD: ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: Along C.5 @ 5 CYLRqDER MEASURED MARKED SLUMP SET NO. (inches) 5 I 5.50 5 2 5.50 5 3 5.50 5 4 5.50 5 5 5.50 5 6 5.50 DATE TESTED 02/0511999 PROJECT DATA CONCaET~ CLASS: 8208 PLACF. MFaNT DATE: 02/0311999 BATCH TIME: 8:21am ~aV~E SAMPLED: 9:10am BY: Mike Odom WEATHER CONDITIONS: TEMPERATURE (lr) - AIR TRUCK NO: 54 Am CONTENT (~): N/A PLACEMENT LOCATION: See page 1 REPORT OF TESTS MAXIbIUM AGE LOAD (days) (lbs. force) 2 91360 02/10/1999 02/10/1999 03/0311999 03/03/1999 Fair 54 s coNcaET~: 68 F TIc~'rNo: 1230123 UNITWEIGHT(~0~ N/A 03/3111999 ACCUMULATIVE YARDS: 540 COMPRESSlVg STRENGTH FRACTURE (~D TYPE 3230 7 150060 5310 7 160000 5660 Average 5490 28 28 56 OILL This report is exclusively for the use of the client indica~d above and shall no~ be reproduced except in full without the written approval of HBC Engineering. Inc. Page 9 of 10 l~el~.rt No.: 9903954 Twenty (20) gallons of wa~er added. Technician: Mike Odom Report Distribution: (I) The Beck Group (I) Gromatzky Dupree & Assoc. (I) Btocket~,' Davis Drake, Inc. ( 1 ) The Beck Group StartS: 2:00am (1) The Bcck Group (1) Dalcan, Inc. Finished: 1 h00am Eugene Harbour Vice President OILL This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 10 of 10 · CONCRETE COMPRESSIVE STRENGTH TEST Date of Service: Client No.: [ I I 01/12/1999 Report No.: 9901858 08644025 Project No.: 43-2333-98 · 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 02/11/1999 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 01 / 12/1999 hATE. TIME: 3:01 am PLANT: 4 ] TIME SAMPLED: 3:20am nv: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Fair STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (F)-nlR 55 F CONCRETE: 63 r SLUMP: 6.0" Max TRUCK NO: 455 TICKET NO: 1212129 AIR: 3-6% AIR CONTENT (%): 4.2 UNIT WE[GItT (per).: N/A TEST METHOD: ASTM C- i 43 PLACEMENT LOCATION: ASTM C- 172 Noah paving slab-on-grade Bay 7 south I/2, entire bay 6 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMt LAT,VE YARDS: CYL,NDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) 'rESTED (days) (lbs. force) (psi) ! ! 5.25 01 / ! 9/1999 7 i 07290 3790 I 2 5.25 01/19/1999 7 117880 4170 Aver'age 3980 I 3 5.25 02/09/1999 28 141910 5020 I 4 5.25 02/09/1999 28 151410 5350 Average 5190 ! 5 5.25 03/09/1999 56 550 FRACTURE TYPE Sample location: Bay 6, between third southern island bull nose Fifteen (15) gallons of water added. 0ILL 'Fhis report is exclusively for the usc ol'tbe client indicated above and shall not be reproduced except in full without thc written approval o1' HBC Engineering, Inc. Page I of 6 CONCRETE COMPRESSIVE STRENGTH TEST Date of Service: 01 / 12/1999 Report No.: Client No.: 08644025 Project No.: 9901858 43-2333-98 · 891)1 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 02/I 1/1999 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppeil, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 4 I SPV~Cl~lCATION rEQUIrEMENTS STRENGTH: 4000 psi @ 28 Days SLUMP: 6.0" Max Am: 3-6% TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 2 I 5.50 01/19/1999 2 2 5.50 01/19/1999 2 3 5.50 02/09/1999 2 4 5.50 02/09/! 999 PROJECT DATA CONCRETE CLASS: 8205 PLACEMENT DATE: 01/12/1999 aATCH TIME: 4:49am TIME SAMPLED: 5:20am RV: Mike Odom WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 450 AIR CONTENT (%): 4.4 PLACEMENT LOCATION: See page I Fair 55 F CONCRETE: 63 F TICKET NO: 1212170 UNIT WEIGltT (OEO: N/A REPORT OF TESTS ACCUMULATIVE YARDS: MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (Ibs.~rce) (psi) 7 116030 4100 7 107420 3800 · '' Average 3950 28 160480 5680 28 156610 5540 Average 5610 2 5 5.50 03/09/1999 56 550 FRACTURE TYPE Five (5) gallons of water added. Sample location: Centerline area Bay 7 between 3rd & 4th southward islands. This rcporl is cxclusivcly lbr thc usc of thc client indicatcd above and shall not bc rcproduccd cxccpt in full without thc written approval of I IBC Ei~ginccring, lnc, OI I.L Page 2 of 6 CONCRETE COMPRESSIVE STRENGTH TEsT Date of Service: Client No.: 01/12/1999 08644025 Report No.: 9901858 Project No.: 43-2333-98 .8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 02/11/1999 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-46 ! 9 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. cowr~croR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi (~ 28 Days SLUMP: 6.0" Max AIR: 3-6% TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 8205 PLACEMENT DATE: 01/12/1999 BATCIt TIME: 5:47am TIME SAMPLED: 6:20am aY: Mike Odom WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 462 AIR CONTENT (%): 4.1 PLACEMENT LOCATION: Sec page I Cloudy 54 F CONCRETE: 60 TICKETNO: 1212211 UNITWEIGHT(peg: N/A SAMPLE LOCATION: See below REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) 'rESTED (days) (lbs. force) 3 I 5.75 01/19/1999 7 119520 3 2 5.75 01/19/1999 7 123310 Average 3 3 5.75 02/09/1999 28 143170 3 4 5.75 02/09/1999 28 156050 Average 3 5 5.75 03/09/1999 56 ACCUMULATIVE YARDS: 550 COMPRESSIVE STRENGTlt (psi) 4230 4360 4300 5060 5520 5290 FRACTURE TYPE Technician time: 2:00am-12:00pm Five (5) gallons of water added. Sample location: Bay 6, between first and second end islands northward' from 0ILL This report is exclusively Ibr thc usc of thc client indicated above and shall not lac reproduced except in lull without thc written approval of ItBC Engineering, Inc. Page 3 of 6 Report No.: 9901858 northside fire lane. This report is exclusively for thc usc of thc client indicated above and shall .ol be reproduced except in full without thc written approval of HBC Engineering, Inc. 0ILL Page 4 of 6 CONCRETE COMPRi ;SSIVE STRENGTH TEST Date of Service: Client No.: Client: 01/12/1999 08644025 The Beck Group Attn: Giilett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 · -8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report No.: 9901858 Report Date 02/11/1999 Project No.: 43-2333-98 Project: GTE Shared Services Coppeil Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8205 . CONCRETE SUPPLIER: TXI PLACEMENT DATE: 01/12/1999 BATCtITIME: 7:05am PLANT: 41 TiME SAMPLED: 7:30am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F} - AIR 54 F CONCRETE: 63 SLtJMP: 6.0" Max TRUCKNO: 464 TICKETNO: 1212323 AIR: 3-6% AIR CONTENT (%): 4.4 UNIT WEIGllT (pc.f): N/A TEb~ METIIOD: ASTM C- 143' PLACEMENT LOCATION: S¢¢ pagc I ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Sec below REPORT OF TESTS ACCUMULATIVE YARDS: 550 CYLINDER MEASURED ~ MAXIMUM COMPRESSIVE MARKED SLUMP DATE AG E LOAD STRENGTll SET NO. (inches) TESTED (days) (lbs. force) (psi) 4 I 6.00 01 / 19/1999 7 120470 4260 4 2 6.00 01/19/1999 7 119010 4210 Average 4240 4 3 6.00 02/09/1999 28 ! 52190 5380 4 4 6.00 02/09/1999 28 158440 5600 Average 5490 4 5 6.00 03/09/1999 56 FRACTURE TYPE Ten (10) gallons of water added. This report is cxclusivcly IbP thc usc of thc client indicated above and shall not hc reproduced except in full without thc written approv:d of I IBC Enginccring, Inc. 0ILl. Page 5 of 6 CONCRETE COMPRESSIVE STRENGTH TEST Date of Service: Client No.: 01/12/1999 Report No.: 9901858 08644025 Project No.: 43-2333-98 8901 Carpenter Frwy., Suite #100 Dallas, Texas 7-n247 Report Date 02/11/1999 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. co~rRACTOR: BECK CONCRETE SUPPLIER: TX[ PLANT: 4 i SPECIFICATION REQUIREMENTS STRENGTt4: 4000 psi ~ 28 Days SLUMP: 6.0" Max AIR: 3-6% TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA · CONCRETE CLASS: 8205 PLACEMENT DATE: 01/12/I 999 BATCH TIME: 8:55am 'I'IMESAMPLED: 9:50am BY: Mike Odom WEATHER CONDITIONS: TEMPERATURE {F) - AIR TaUCKNO: 802 AIR CONTENT (%): 4.4 PLACEMENT LOCATION: See page I Cloudy 60 v CONCRETE: 63 TICKETNO: 1212471 UNITWEIGIIT(pc0j N/A SAMPLE LOCATION: Sc¢ below CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 5 I 6.00 5 2 6.00 5 3 6.00 5 4 6.00 5 5 6.00 DATE 'VESTED 01/19/1999 01/19/1999 02/09/1999 02/09/1999 REPORT OF TESTS ACCUMULATIVE YARDS: MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (lbs. force) (psi) 7 ! 00980 3570 7 107990 3820 Average 3700 28 146320 5170 28 132860 4700 Average 4940 03/09/1999 56 550 FRACTURE TYPE Sample location: lane. Technician: Mike Odom Report Distribution: ( I ) Thc Beck Group (I) Gromalzky Duprcc & Assoc. ( 1 ) Brockcttc Davis Drake, inc. (I) Thc Bcck Group Centerline area Bay 7, 40' Started: 2:00am ( I ) 'Fhe Bcck Group ( I ) D:dcnn, Inc. north from centerline north fire Finished: 12:00pm ~ Engineeri~~~' Eugene Harbour Vice Prcsideqt This report is exclusively for thc usc of thc clicm i.dicatcd above and shall not bc reproduced cxccpt i,~ full without thc written approval of ItBC Engineering. Inc. 0ILL Page 6 of 6