Loading...
ST9601-LR 990315 TEAM CONSULTANTS, INC. 2970 S. Walton Walker, Suite 101 I)allas, Texas 75211 2 14/331-4395 CONCRETE PLACEMENT REPORT Mr. Robert Caudill DATE: 03/I 5/I 999 ,lOB IITLE: Wrangler I)rivc Tiseo Paving REPORT NO.: 50 Coppoll PO Box 270040 JOB NO.: 985142 Dallas, Texas 75227 DESIGN USED: -- START UP TIME: 3:30 SAMPLING METHOD: ASTM C-172 ASTM C-31 ASTM ASTM TEMPERATURE TIME TIME BEAM OR CYL. TRUCK TICKET WATER CUBIC C-143 C-231 fro) BATCHED UNLOADED SET NOS. LOCATION NO. NO. ADDED YARDS SLUMP % AIR AMB/CONC REMARKS -- 3:45 28 A-D Sta. 49+50, road .... 0 10.0 5.50 6.5 -- 67 -- 5:10 29 A-D Sta. 37+14 , road .... 0 10,0 6.00 9.0 -- 67 REMARKS: '- Time On: 3:00 Time Off: 6:00 Tech. Time: 3.0 hrs. SIGNED: Trip Charge: I Joel WhitIey, Technician Iw cc: City of Coppell/Larry Davis