Loading...
Verizon-LR 990210( ONCRETE COMPRESSIVE STRENGTH TES£ II Date of Service: 12/15/1998 Client No,: 08644025 Report No.: 9833696 Project No.: 43-2333-98 .. 8901 Carpenter Frwy., Suite #I00 Dallas, Texas 75247 Report Date 02/10/1999 Client: The Beck Group Project: Attn: Oillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONT~CTOR: BECK CONCRETESUPPLmm TXI PLANT: 4 l SPECIFICATION REQUIREMENTS s'ra~a'rm 4000 psi @ 28 Days SLUVn': 6.0" Max AIR: 3-5% TES~ MmaIOD: ASTM C- 143 ASTM C-172 ASTM C-39 PROJECT DATA CONCP, ETE CLASS: 8205 PLACEMENT DATE: 12/15/1998 BATCIt TIME: 5:02am TIME SAMPLED: 6:10am aY: Mike Odom WEATI-i~R CONDITIONS: TEMPERA'lURE (Ir). AIR TRUCK NO: 458 AIR CONTENT (%): 4.7 PLACEMENT LOCATION: Paving slab-on-static (parking) #3 Fair 36 F CONCRETE: 55 F TIcx~r NO: 1197964 UNIT WEIGHT (i~.: N/A SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 300 MP. ASU . coMp ,a, ssrvz MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (incl~s) TESTED (days) (lbs. force) (psi) I I 6.75 12/22/1998 7 80910 2860 I 2 6.75 12/22/1998 7 82030 2900 Average 2880 I 3 6.75 01/12/1999 28 144470 5110 I 4 6.75 01/12/1999 28 138240 4890 Average 5000 I 5 6.75 02/09/1999 56 154570 5470 Sample location: 40' North from Building Line 8 & 80' west from centerline weset fire lane. FRACTURE TYPE This repo{t is exclusively foe the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page I of 3 · CONCRETE COMPRESSIVE STRENGTH TEST Date of Service: 12/15/1998 Report No.: 9833696 Client No.: 08644025 Project No,: 43-2333-98 · .8901 Carpenter Frwy., Suite #100 Dallas, Texa_s 75247 Report Date 02/10/1999 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRm~SUPPLmR: TXI PL~Wr: 4 t SPECnnCATtO~ REQUIREMENTS STR~(;T~: 4000 psi @ 28 Days SLUMP: 6.0" Max Aim 3-5% TEST MET~OO: ASTM C- 143 ASTM C-172 ASTM C-39 PROJECT DATA CONCR~m CLASS: 8205 PLACEMENT DATE: 12/15/1998 BATCH TmlZ: 6:36am TIM~ SAMPLED: 7:10am BY: Mike Odom WEATHER CONDITIONS: TF~MPERATURE (F) - AIR TRUCK NO: 470 Am co~rEwr (%): 4.8 PLACEMENT LOCATION: $cc page 1 Fair 38 F CONCa~-'r~: 57 v x~ci~'r NO: 1198062 vNrr wEIG~rr (pc-O: N/A SAMPLE LOCATION: See below CYLINDER MARKED SET NO. REPORT OF TESTS ACCUMULATIVE YARDS: 300 MEASURED MAXIMUM COMPRESSIVE SLUMP DATE AGE LOAD STRENGTH FRACTURE (inches) TESTED (days) (Ib~. force) (psO TYPE 2 I 6.00 12/22/1998 7 98720 3490 2 2 6.00 12/22/1998 7 101010 3570 Average 3530 2 3 6.00 01112/1999 28 135160 4780 2 4 6.00 01/12/1999 28 144450 5110 Average 4950 2 5 6.00 02/09/1999 56 146900 5200 Sample Location:Directly in Line W/Bldg Line E, 100° west from centerline west fire lane. 0ILL This repo~ is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 2 of 3 ONCRETE COMPRESSIVE STRENGTH TEST Date of Service: 12/15/1998 Client No.: 08644025 Report No.: 9833696 Project No.: 43-2333-98 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 02/10/1999 Client: The Beck Group Project: Attn: Oilier Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-~619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. cor, nuO, CTOm BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION RF.,QUIREWIEN~ s'rwNo~mt: 4000 psi @ 28 Days st,twn,: 6.0" Max Am: 3-5% TF~vr M~'mOO:. ASTM C- 143 ASTM C-172 ASTM C-39 PROJECT DATA CONCR~r~ CLASS: 8205 1,LAc~ OAT~: 12/15/1998 BATCll TIM~: 7:45am Tn~SAtOLF. D: 8:25am BY: Mike Odom WF_,ATH~R CONOmONS: Fair TEM~E~(F)-Am 40 F CONCRETg: 58 F mUCKNO: 802 TIcr,~r NO: 1198189 am co~ (~): 4.6 ~ ~m~ (~: N/A P~C~ ~ATION: ~ ~ge 1 SAMPLE LOCATION: Sec below CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inch~s) TESTED 3 1 6.50 12/22/1998 3 2 6.50 12/22/1998 3 3 6.50 01/12/1999 3 4 6.50 01/12/1999 3 5 6.50 02/09/1999 REPORT OF TESTS AC XXVE YAm)S: 330 MAXIMUM COMPRF_SSIVE AGE LOAD sTRENGTH (days) (lb~ force) (psi) 7 8OOO0 2830 7 75840 2680 Average 2760 28 116760 4130 28 121560 4300 Average 4220 56 130420 4610 Sample location: Along centerline north (W) fire lane. All slumps were taken at Technician: Mike Odom Report Distribution: (1) The Beck Group (I) Oromatzky Duprce & Assoc. (1) Brockctte Davis Drnke, Inc. (1) The Beck Group side fire lane, 60' west of centerline hopper. Started: 5:00am (I) The Beck Group (I) Dalcan, Inc. Finished: 9:30am Eugene Harbour Vice President This repotm is exclusively for the usc of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 3 of 3 CONCRETE COMPRESSIVE STRENGTH TEST Date of Service: 12/15/1998 Client No.: 08644025 Report No.: 9833695 Project No.: 43-2333-98 .. 8901 Carpenter Frwy., SuRe #100 Dallas, Tex~ 75247 Report Date 02/10/1999 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of.fresh concrete at the placement locations, perform required field test and cast compressive strength samples. COrO'R~CTOR: BECK CONCRETE SUPPLIER: TXI PLA~rr: 41 SPECIFICATION REQUIREMENTS s~aTH: 3000 psi @ 28 Days SLUMP: 6.0" Max Am: NA xv~vr M~nIOO: ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: G.5 @ 16 PROJECT DATA CONCRgTg CLASS: 9506 PLACEMENT DATE: 12/15/1998 BATCH TIME: 3:05am TIME SAMPLED: 3:40am BY: Mike Odom WF, A~I~ CoNorrIONS: Fair to partly cloudy TEMPERATURE (F). Am 37 F CONCRETg: 57 F ~OCKNO: 470 ~gC~: 1197892 Am CO~ (~): 1.7 o~ ~G~ (~: N/A P~C~ L~ATION: East wing building slab on grade (Level I) 15-18, E-H Lines REPORT OF TESTS CYLINDER MEASURED MAXXMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) I 1 5.75 12/22/1998 7 92410 I 2 5.75 12/22/1998 7 94380 Average I 3 5.75 01/12/1999 28 141470 I 4 5.75 01/12/1999 28 158870 Average I 5 5.75 02/09/1999 56 165150 ACCUMULATIVE YARDS: 170 COMPRESSIVE STRENGTH (psi) 3270 3340 3310 5000 5620 5310 5840 This report is exclusively for the usc of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of 2 CONCRETE COMPRESSIVE STRENGTH TE II Date of Service: 12/15/1998 Client No.: 08644025 .. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report No.: 9833695 Report Date 02/1011999 Project No.: 43-2333-98 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppetl, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA cowrg~crom BECK coNcR~r~ CLASS: 9506 coN.c~'r~ stun, Lmm ~I P~C~ oa~: 1~15/1998 ~nTC~ ~: 4:12~ p~: 41 ~ S~LED: 4:~ sv: Mike Odom S~C~CATION ~UI~ ~R CO~fflONS: Fa~ ~~: 3~psi ~ 28Days ~~~.Am 38 F CONCh: 58 F SL~: 6.0" M~ ~UCg~O: 474 TIC~O: 1197924 A~m NA nm co~ (~): N/A u~ WE~ (~9: N/A T~ ~lOm AS~ C- 143 P~C~ LOCATION: ~ ~gc 1 AS~ C-172 AS~ C-39 SAMIq, E LOCATION': E.$ 0 17.5 REPORT OF TESTS ACC X VE YARDS: CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 2 1 6.25 12/22/1998 7 92160 3260 2 2 6.25 12/22/1998 7 92390 3270 Average 3270 2 3 6.25 01/12/1999 28 145010 5130 2 4 6.25 01/12/1999 28 154910 5480 Average 5310 2 5 6.25 02/09/1999 56 156890 5550 170 FRACTURE TYPE Samples were taken from hopper. Technician: Mike Odom Report Distribution: (I) Thc Beck Group (1) Gromatzky Duprce & Assoc. (i) Breckett~ Davis Drake, Inc. (I) Th~ Beck Group Started: 2:00am (I) The Beck Group (I) Dalcan, Inc. Finished: 5:00pm H~ Engin ,I~nc. Eugene Harbour Vice President This repo~ is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 2 of 2 , CONCRETE COMPRESSIVE STRENGTH TEST Date of Service: 12/17/1998 Client No.: 08644025 ENG~,~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report No.: 9833993 Report Date 02/10/1999 Project No.: 43-2333-98 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. cowr~m BECK CONCa~r~ StriCt, mR: TXI Pt..~rr: 41 SPECIFICATION REQUIREMENTS STm~aTm 5000 psi ~ 28 Days sn~: 6.0" M~ A~ N/A ~ ~om AS~ C-143 ASTM C-172 AS~ C-39 PROJECT DATA .CONCRgr~ Ct. ASS: 8208 PLACla~il2qr DATE: 12/17/1998 BATCH TIM~: 2:llpm XnVmSAM~LED: 2:50pm aY: Mike Odom Building columns Level 2 & 3 0 9.3, P & L, 9-7, P & L SAMPLE LOCATION: See placement location CYLINDER MARKED SET NO, MEASURED SLUMP I 1 6.00 I 2 6.00 I 3 6.00 1 4 6.00 I 5 6.00 REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) 12/24/1998 7 139420 12/24/1998 7 138950 Average 01/14/1999 28 187780 01/14/1999 28 177900 Average 02/05/1999 50 204100 ACCUMULATIVE YARDS: COMPRESSIVE STRENGTH 4930 4910 4920 6640 6290 6470 7220 10 FRACTURE TYPE Note: These four Technician: Mike Odom Report Distribution: (i) Tbe Beck Group (1) Gromatzky Dupree & Assoc. (I) Brockette Davis Drake, Inc. (I) The Beck Group (4) columns previously inspected (rebar). Started: 2:30pm Finished: 4:30pm (1) TI~ Beck Group (1) Dalcan, Inc. Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page I of I CONCRETE COMPRESSIVE STRENGTH TEST Date of Service: Client No.: 02/02/1999 08644025 I I I Report No.: 9903835 Project No.: 43-2333-98 ~901 Carpenter Frwy., Suite #100 Dall~, T_~ta$ 75247 Report Date 02/10/1999 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. cot~no, cxom BECK CONCR~'r~ SLq'PLmR: TXI PLA~: 41 SPECIFICATION REQUI~ STg~G'm: 5000 psi @ 28 Days SLt~a': 6.0" Max nlm N/?.A TgST M~"mOO: ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: PO9.3 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 1 1 6.00 I 2 6.00 1 3 6.00 1 4 6.00 I 5 6.00 Technician: Mike Odom Report Distribution: (1) The Beck Group (1) Gromatzky Duprec & Assoc. (1) Brockette Dav~s Drake, Inc. (1) The Beck Group PROJECT DATA coNcv,~r~ c~,ss: 8208 ~n.~c~ DaX~: 02/02/1999 BATCH Tll~IE: l:56pm TIME,~,MPLED: 2:25pm BY: Mike Odom WEATIiKR CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 460 Am CONTEt~rr (%): N/A PLACEMEI~ LOCATION: Fair 62 F coNcRE~: 68 F TIcggr No: 1229576 U~aT wEx(;ffr (pc0:' N/A Building L~vel V, Ar~a B column~ (19) O M, N, P @ 9.3, M, N, P @ 9.7, K, J, M, N @ 10, E,F,G,H O B,F~FO 11, E,F,G O 12 DA'rE TF~TED 02/09/1999 02/09/1999 REPORT OF TESTS ACCUMULATIVE YARDS: 43.5 MAXIMUM COMPRESSIVE AGE LOAD STRENGTH FRACTURE (days) 0b~. force) (psi) TYPE 7 151550 536O 7 142760 5050 Average 5210 03/02/1999 03/02/1999 28 28 03/30/1999 56 Started: 2:30pm (I) The Beck Group (I) Dalcan, Inc. Finished: 5:30pm I'-I~ E nc Eugene Harbour Vice President This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page I of 1