Loading...
Verizon-LR 990209CONCRETE COMPRESSIVE STRENGTH TES .8.901 Carpenm- Frwy., Suite #100 ~ T~ms 75247 Report Date Report No.: 9903696 02/09/1999 Date of Service: 02/01/1999 Client No.: 08644025 Client: Services: Project No.: 43-2333-98 The Beck Group Attn: Gillett Berget 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRaCrroR: BECK coNc~'r~ SUtn, Lwa: TXI p~: 43 SPECie.ON ~UI~~ ~~: 5~ psi ~ 28 Days sc~: 6.0" Max niR: N/A x~ M~Om ASTM C- 143 AS~ C-172 ASTM C-39 PROJECT DATA coNcP--g~ cLAss: 8208 pLACEM~'T DATE: 02/0111999 BATCH TaYto: 'i:48pm TIME SAMPLED: 2:30pm BY: Mike Odom WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 642 AIR co~rF.2~ (~): N/A Partly cloudy 62 F coNcam~: 69 F TICKET NO: 1228679 OmT WgmHT (P~0: N/A PLACEMENT LOCATION: Building I, i.cvel V Area B roof columns (19) A,B,C,D ~ 6, ABC ~7, AB · 8, N,M,L,K ~ 9, K, J, L ~ 9.3, KJ, L ~ 9.7 SAMPLE LOCATION: A-6 CYLINDER MARKED SET NO. REPORT OF TESTS ACCUMULATivE YARD : 43.5 MEASURED MAXIMUM COMPRESSIVE SLUMP DATE AGE LOAD STRENGTH FRACTURE (inch~s) TESTED (days) Obs. force) (psi) TYPE I I 5.75 02/03/1999 2 54200 1920 5.75 02/08/1999 7 118110 4180 5.75 02/0811999 7 134840 4770 Average 4480 1 4 5.75 03/01/1999 28 1 5 5.75 03/01/1999 28 5.75 03/29/1999 56 0ILL This report is exclusively for ~hc usc of the client indicated above and shall not bc reproduced except in full without thc written approval of HBC Engineering, Inc. Page I of 2 Report No.: 9903~96 Twenty (20) gallons of water added. Technician: Mike Odom Report Distribution: (1) The Beck Grmap (1) Gromatzky Dapree & Assoc. (I) Brockette Davis Drake, Inc. (!) The Beck Group Started: h30pm (1) The Beck Group (1) Dalcan, Inc. Finished: 5:00pm Engineering, Inc. Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 2 of 2 CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 0111111999 08644025 Report No.: 9901730 Project No.: 43-2333-98 Report Date 02/09/1999 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCI~rE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STm~(;TH: 5000 psi @ 28 Days SLtrMP: 6.0" Max AIR: N/A T~vr M~mOD: ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: A.5 @ 1.5 PROJECT DATA CONCRET~ CLASS: 8208 PLACEMENT DATE: 01/11/1999 BATCH TIME: 3:46am TIME SAI~LED: 4:05am BY: Mike Odom WEATItER CONDrrlONS: TEMPERATURE (F) - AIR TRUCK NO: 470 Am CONTENT (%): N/A PLACEMENT LOCATION: Level IV, building slab 1-5.7 & A-D Fair 42 F CONCRETV.: 55 V TICKET SO: 1211055 c~rr WEXGaT (p~:. N/A REPORT OF TESTS ACC aWE YARDS: 510 C n,r ER MEASURED MAX n COMP _.SSXVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I 1 6.00 01/14/1999 3 105870 3740 I 2 6.00 01/18/1999 7 136780 4840 1 3 6.00 01 / 18/1999 7 142670 5050 Average 4950 1 4 6.00 02/08/1999 28 212870 7530 I 5 6.00 02/08/1999 28 204390 7230 Average 7380 I 6 6.00 03/08/1999 56 0ILL This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 1 of 6 1 CONCRETE COMPRESSIVE STRENGTH TEST' Date of Service: Client No.: Client: 01/11/1999 08644025 The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Report No.: Project No.: Project: 8.901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 9901730 Report Date 02/09/1999 43-2333-98 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CO~CTOm BECK CONC~rg S~PPLmR: TXI ~: 41 ~EC~I~ON ~QUI~ SL~: AIR: T~ M~IOD: 5000 psi @ 28 Days 6.0" Max N/A ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: B @ 2 PROJECT DATA CONCa~rr~ CLASS: 8208 PLACi~M~ DATE: 01/11/1999 BATCH TIM~: 5:10am T~,ESAI~LED: 5:50am BY: Mike Odom WEATI~R CoNDmONS: TEMPERATURE (1~. Am TRUCK NO: 450 AIR CONTENT (%): N/A PLACEMENT LOCATION: See page I Fair 38 F CONCa~T~: 55 v TICK~ t~O: 1211104 vNrr w~Ia~rr (pc0..' N/A CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 2 1 5.75 REPORT OF TESTS MAXn~crM DATE AGE LOAD ~D (days) (lbs. force) 01/14/1999 3 113820 ACCUMULATIVE YARD~: 5 I0 COMPRESSIVE 6~ENGTH FRACTURE (psi) TYPE 4030 2 2 5.75 2 3 5.75 2 4 5.75 2 5 5.75 2 6 5.75 01/18/1999 7 141660 01/18/1999 7 143870 Average 02/08/1999 28 226520 02/08/1999 28 236900 Average 03/08/1999 56 5010 5090 5050 8010 8380 8200 0ILL This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. Page 2 of 6 CONCRETE COMPRESSIVE STRENGTH TEST Date of Service: Client No.: 01/11/1999 08644025 Report No.: 9901730 Project No.: 43-2333-98 8901 Carpenter Frwy., Suite #100 Dallas, Texas 7S247 Report Date 02/09/1999 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA co~rrRAcxox: BECK CONCU~TE C~SS: 8208 CONCRETE SUPPLIER: TXI Pcncmaravr DATE: 01/11/1~9 BATCH ~: 6:17am r~: 41 ~ SAILED: 6:50am BY: Mike Odom S~ZC~Cn~O~ ~QU~~ ~~ commons: Faff ~G~: 5~psi ~ 28Days ~z~ ~'Am 40 v co~c~: 55 v sL~: 6.0" M~ xaucg~o: 458 ~c~ ~o: 12111~ A~ N/A Am co~ (~): N/A u~ ~ (~0~ N/A ~ M~ZOO: ASTM C- 143 v~c~z~ LOCAX~O~: S~e page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: C @ 3 REPORT OF TESTS ACC~n~CA~E YARDS: 510 c~za Mp~s~u~ M~x~ co~REssrw MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 I 5.50 01 / 1411999 3 126070 4460 3 2 5.50 01/18/1999 7 192590 6810 3 3 5.50 01/18/1999 7 204100 7220 Average 7020 3 4 5.50 02/0811999 28 234570 8300 3 5 5.50 02/08/1999 28 220780 7810 Average 8060 3 6 5.50 03/0811999 56 OILL This repoa is exclusively for the use of thc client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc. Page 3 of 6 CONCRETE COMPRESSIVE STRENGTH TEST' Date of Service: 01/11/1999 Report No.: Client No.: 08644025 Project No.: 8901 Carpeuter Frwy. Suite #100 D-u~. T,~ 75247 9901730 Report Date 02/0911999 43-2333-98 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive COppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA Co~rrlO, CTOR: BECK coNcRETE SOPrUER: TXI PL~rr: 41 SPEC~CA~ON ~QU~~ ~R CO~ONS: Fair s~a~: 5~psi ~ 28Days ~g~(~.~m 41 g conch: 55 g SL~: 6.0" Max ~RocgNo: 453 TIc--No: 1211294 · m: N/A Am co~ (%): N/A ~ ~ (~ N/A ~ ~oo: AS~ C- 143 P~c~ ~CAT~ON: ~ page 1 ASTM C- 172 AS~ C-39 SAMPLE LOCATION: C @ 3.3 CONO~ET~ CLASS: 8208 . PLACEMENT DATE: 01/11/1999 BATCH TIME: 7:18am TIME SAMPLED: 8:00am BY: Mike Odom REPORT OF TESTS ACCVm n YARDS: 510 MRASVRED co ssxw MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 4 I 5.25 01 / 14/1999 3 103740 3670 4 2 5.25 01118/1999 7 147350 5210 4 3 5.25 01/18/1999 7 142720 5050 Average 5130 4 4 5.25 02/08/1999 28 223550 7910 4 5 5.25 02/0811999 28 241700 8550 Average 8230 4 6 5.25 03/08/1999 56 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0iLL Page 4 of 6 CONCRETE COMPRESSIVE STRENGTH TEST Date of Service: 01/11/1999 Report No.: Client No.: 08644025 Project No.: Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 .$901 C~t~r Frwy., Suit~ #100 Dalhm; T~ 75247 9901730 Report Date 02/09/1999 43-2333-98 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. co~rRACTOa: BECK CONCRE'r~ SUPPUEa: TXI PLANT: 41 SPECIFICATION REQU IREMF2h"rs STaXNOT~: 5000 psi @ 28 Days SLUM~: 6.0" Max Am: N/A TF. ST M~TtOD: ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: C-4 CYLINDER MEASURED MARKED SLUMP SET NO. (Inche~) 5 1 5.50 5 2 5.50 5 3 5.50 5 4 5.50 5 5 5.50 5 6 5.50 DATE TESTED 01114/1999 PROJECT DATA CONC~T~ CLASS: 8208 PLACEMENT DATE: 01/11/1999 BATCH TIME: 8:41am TIME SAMPLED: 9:25am BY: Mike Odom W~A~R CONDmONS: Partly cloudy TF~TURE (~. Am 50 F CONCRgTg: 55 F ~UC~NO: 461 T~C~ ~O: 1211437 Am co~ (%): N/A u~ ~IO~ (~: N/A P~CEM~ ~ATION: ~ge ! REPORT OF TESTS ACCUMULATIVE YARDS: MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (dnys) (lbs. force) (psi) 3 106020 3750 01118/1999 01118/1999 02/08/1999 02/0811999 03/08/1999 7 168550 5960 7 154600 5470 Average 5720 28 217620 7700 28 223890 7920 Average 7810 56 510 FRACTURE TYPE This report is exclusively for the usc of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, inc. 0ILL Page 5 of 6 Report No.: 9901730 Note: Ail samples and slumps were taken at hopper. Ten gallons of water was added for this set. Technician: Mike Odom Report Distribution: (1) TI~ Beck Group (i) Gromatzky Dupree & Assoc. (i) Brockcttc Davis Drake, Inc. (I) Thc Beck Group su~ed: 3:00am (I) The Beck Group (I) Dalcan, Inc. Finished: 10:00am Eugene Harbour Vice President This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without thc wriucn approval of HBC Engineering, Inc. 0iLL Page 6 of 6