Verizon-LR 990208CONCRETE COMPRESSIVE STRENGTH TEST
.8~01 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 12/09/1998
Client No.: 08644025
Client: The Beck Group
Attn: Gillett Berger
..1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Report Date
Report No.: 9833168 02/0811999
Project No.: 43-2333-98
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of flesh concrete at the placement locations, perform required field test and cast
compressive strength samples.
Cot*rRACTOR: BECK
CONCRETE SUPPLIF. R: TXI
eLA~rr: 41
SP~-CIFICATION REQmREME~rrs
STRENa'm: 5000 psi @ 28 Days
SLUMP: 6.0" Max
AIR: N/A
TV. ST METROD: ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 8208
PLACEMENT DATE: 12/09/1998 BATCII TIME: 3:54am
TIME SAMeLlO-D: 4:30am BY: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F)- AIR
TRUCKNO: 461
AIR CONTENT (%): 1.4
Fair
37 F CONCRETE: 64 F
TICKET NO: 1195830
UNIT WEIGItT (pc0: N/A
PLACEMENT LOCATION:
Building Area A (west wing), Level I!, Line I-5.7, A-D, slab
SAMPLE LOCATION:
1.5@B
REPORT OF TESTS
CYLINDER MEASURED ~,LAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
I I 5.50 12/11/1998 2 92500
I 2 5.50 12/12/1998 3 108910
I 3 5.50 12/16/1998 7 159240
I 4 5.50 12/16/1998 7 157110
Average
I 5 5.50 01/06/1999 28 171570
I 6 5.50 01/06/1999 28 178940
Average
ACCUMULATIVE YARDS: 450
COMPRESSIVE
STRENGTIt
(psi)
3270
FRACTURE
TYPE
3850
5630
5560
5600
6070
6330
6200
This report is exclusively for thc usc of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 1 of 8
·
Report No.:
CYLINDER
MARKED
SET NO.
9833168
MEASURED
SLUMP
(inch.)
I 7 5.50
DATE
TES'I~D
02/0311999
AGE
(days)
56
MAXIblUM
LOAD
(lbs. force)
192470
COMPRESSIVE
STRENGTIt
(p~i)
6810
O1LL
This reporl is exclusively for ~he use of the client indicated above and shall not bc reproduced except in full without the written approval of HBC Engineering, Inc.
Page 2 of 8
-CoNcRETE COMPRESSIVE STRENGTH TEST
.8.~1 Carpenter Frwy., Suite #100
D~lhs, Texas 7S247
Date of Service:
Client No.:
Client:
Services:
12/09/1998
08644025
The Beck Group
ARm Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Report Date
Report No.: 9833168 02/0811999
Project No.: 43-2333-98
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTgACTOR: BECK
CONCRETE SUPPLIER: TXI
PLA~r: 41
SPECIFICATION RF~UIREMENTS
STRENCXU: 5000 psi @ 28 Days
SLUMP: 6.0" Max
AIR: N/A
TEST METIIOD: ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCe~'E CLASS: 8208 .
pLACEMENT DATE: 12/0911998 BATCH TIME: 5:19am
TIME SAbIPLED: 6:00am BY: Mike Oclom
WEATI-IER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 834
AIR CONTENT (%): N/A
pLACEMENT LOCATION:
See page !
Fair
35 s CONC~-'r~: 63 S
TICKET NO: ! 195890
uNIT WE~Orrr (pcfl~ N/A
SAMPLE LOCATION:
3.5@C
REPORT OF TESTS
MAXIMUM
CYLINDER MEASURED
MA RKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
2 t 5.75 12/1111998 2 93420
2 2 5.75 12/12/1098 3 109050 3860
2 3 5.75 12/16/1998 7 162510 5750
2 4 5.75 12/16/1998 7 162120 5730
Average 5740
2 5 5.75 01/06/1999 28 205430 7270
2 6 5.75 01106/1999 28 199860 7070
Average 7170
ACCUMULATIVE YARDS: 450
COMPRESSIVE
STRENGTH FRACTURE
(psi) TYPE
33OO
OILL
This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 3 of 8
CYLINDER
MARKED
SET NO.
MEASURED MAXil~4UM COMPRESSIVE
SLUMP DATE AGE LOAD STRENGTII FRACTURE
(inches) TESTED (days) (lbs. force) (psi) TYPE
2 7 5.75 02/03/1999 56 215660 7630
OILL
This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc.
Page 4 of 8
CoNcRETE COMPRESSIVE STRENGTH TEST
8901 Carpenter Frwy., Suite #100
Dallas, T~_s 75247
Report Date
Date of Service: 12/09/1998 Report No.: 9833168 02/08/1999
Client No.: 08644025
Client:
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Project No.: 43-2333-98
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: BECK CONCRETE Ct,ASS: 8208
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 12/09/1998 BATCII TIME: 7:04am
PLANT: 41 TIME SAMPLED: 7:40am BY: Mike Odom
SPECIFICATION REQUIREMENTS WEATItER CONDITIONS: Fair
STager;Tm 5000 psi @ 28 Days TEMPERATURE (lt) - AIR 38 g CONCRETe: 66 F
SLO'M~: 6.0" Max ~UCK NO: 835 'nCKET NO: 1196017
AIR: N/A AIR CONTENT (%): 1.6 UNIT WEIGHT (pc0.; N/A
'rEST M~-'nlOO: ASTM C- 143 PLACEMENT LOCATION:
See page I
ASTM C-
ASTM C-39
SAMPLE LOCATION:
C.5 @ 4.5
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
3 I 5.25 12/11/1998
3 2 5.25 12/12/1998
3 3 5.25 12/16/1998
3 4 5.25 12/16/1998
3 5 5.25 01/06/1999
3 6 5.25 01106/1999
REPORT OF TESTS ^CCtrM~ATIVE YARDS: 450
MAX~M COMP~SSlVE
AGE LOAD STRENGTH
(days) (lbs. force) (psi)
2 92330 3270
3 108580 3840
7 160280 5670
7 161140 5700
Average 5690
28 216090 7640
28 215580 7620
Average 7630
0ILL
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 5 of 8
Repo. rt No.:
CYLINDER
SET NO.
9833168
MEASURED MAXIMUM COMPRESSIVE
SLUMP DATE AGE LOAD STRENGTil FRACTURE
(inches) TESTED (days) (lbs. force) (p~) TYPE
3 7 5.25 02/03/1999 56 230470 8150
0ILL
This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 6 of 8
CONCRETE COMPREbsIVE STRENGTH TEST
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 12/09/1998 Report No.: 9833168 Report Date
02/08/1999
Client No.: 08644025 Project No.: 43-2333-98
Client: The Beck Oroup Project:
Attn: Oilier Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRE'rv. sUPPLmR: TXI
PLA~: 41
SPECIFiCA~ON ~QUI~~
~N~: 5~ psi ~ 28 Days
SL~P: 6.0" Max
A~m N/A
TEST M~OO: ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION:
C.7 @ 5.7
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inches)
4 1 6.25
4 2 6.25
4 3 6.25
4 4 6.25
4 5 6.25
4 6 6.25
DATE
TESTED
12/11/1998
PROJECT DATA
CONCRETE CLASS: 8208
PLACEMF_,HT DA~: 12/09/1998 BATCH TIME: 8:39am
TIME SAMPLED: 9:10am BY: Mike Odom
WEATIIER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 541
AIR CON'rENT (%): N/A
PLACEMENT LOCATION:
Sec page I
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (lbs. force)
2 98260
12/12/1998
Fair
42 F CONCRE~: 66 F
TICKET NO: 119620111
UNIT WEIGIrr (pc0: N/A
12/16/1998
12/16/1998
0110611999
01/06/1999
ACCUMULATIVE YARDS: 500
COMPRESSIVE
STRENGTIt FRACTURE
(i~i) TYPE
3470
3 104270 3690
7 158930
7 158170
Average
28 205360
28 207500
Average
5620
5590
5610
7260
7340
7300
0ILL
This report is exclusively for the use of the client indicated above and shall not b~ reproduced except in full without the written approval of HBC Engineering, Inc.
Page 7 of 8
R'epo. rt No.:
9833168
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inches)
4 7 6.25
Ail samples
DATE
TF_3TED
02/03/1999
taken from hopper.
AGE
56
MAXIMUM COMPRESSIVE
LOAD STRENGTH FRACTURE
Obs. force) (p~i) TYPE
215880
7630
Technician: Mike Odom
Report Distribution:
(I) The Beck Group
(I) Gromatzky Dupree & Assoc.
(I) Brockette Davis Drake, Inc.
(1) The Beck Group
Started: 2:30am
(I) The Beck Group
(I) Dalcan, Inc.
Finished: 1 l:00am
Vice President
0ILL
This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 8 of 8
CONCRETE COMPREo$IVE STRENGTH TES'x
8901 Carpenter Frwy- Suite #100
Dallas, Texas 75247
Date of Service: 01/28/1999 Report No.: 9903453
Client No.: 08644025 Project No.: 43-2333-98
Report Date
02/08/1999
Client: The Beck Group Project:
Atto: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
COtO'~crog'. BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPZCt~CA~ON m~QUiRz~,~s
STS~aTtI: 4000 psi @ 28 Days
SLOMY: 6.0" Max
Aim N/A
TEST M~"mOO: ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCV. ZTZ CLASS: 9508
PLACEMENT DATE: 01/28/1999 BATCll TIME: h06pm
Tn~ SAIV~LZD: l:45pm aY: Mike Odom
WEATHER CONDITIONS:
TEMPE~ (F) - AIR
TRUCK NO: 459
AIR CONTENT (~): N/A
Cloudy
72 v CON~nS.'TE: 75 v
~CKET NO: 1227852
u~rr WEiGtrr (pc0: N/A
PLACEMENT LOCATXON:
Building I, Level I, patio retaining walls west to south
SAMPLE LOCATXON:
CYLINDER
MARKED
SET NO.
See below
1W~SURED
SLUMP
0"~)
1 I 5.75
I 2 5.75
1 3 5.75
I 4 5.75
DATE
02/0411999
02/0411999
REPORT OF TESTS ACCUMULATIVE YARDS:
MAXIMUM COMPRESSIVE
AGE LOAD STRENGTH
(days) (!1~. force) (i~'i)
7 101770 3600
7 103610 3660
Average 3630
02/2511999
02/25/1999
28
28
3O
1 5 5.75
03/25/1999
56
Sample location: West
Technician: Mike Odom
Report Distribution:
(!) The Beck Group
(1) Gromatzky Dupree & Assoc.
(I) Brockette Davis Drake, Inc.
(1) The Beck Group
side wall, 20' south
Started: h30pm
(I) The Beck Group
(I) Dalcan, Inc.
from north end.
Finished: 4:30pm
Vice President
This repotl is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, inc.
01LL Page I of 1
CONCRETE COMPRESSIVE STRENGTH TEST'
8901 Carpenter Frwy., Suite #100
Dallas, Te~ms 75247
Date of Service:
Client No.:
Client:
Services:
0110811999
08644025
The Beck Gwup
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Report No.: 9901546
Project No.: 43-2333-98
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Report Date
02/08/1999
Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
cot~rio, croa: BECK
COt~CaETESm'PLm~ TXI
p~: 41
S~C~ON ~U~
S~O~: 5~ psi ~ 28 Days
sc~: 6.0" Max
n~ N/A
~ ~O~: AS~ C- 143
AS~ C-172
AS~ C-39
PROJECT DATA
CONCR~rg CLASS: 154
PLACEMENT DATE: 01/0811999 BATCH TIM~: 12:36pm
TIME SAMPLED: l:10pm BY: MikeOdom
WEATm~R coN~rrloNs: Cloudy
Tr_.M~ZgATUREig)-Am 41 g CONCRETe: 38 ~'
'r~ucKNo: 383 TICK_RT ~O: 1210825
Am com~r (~): N/A vjtvrr wg~(;irr (pet):. N/A
PLACEMENT LOCATION:
Building Columns (19) Level Iii P, N, M, & K, $ ~ 9.1, N, M, L, K ~ 10, E & F ~ 11. E.
F,G~ 12, H,G,F,E ~ 13
SAMPLE LOCATION: E @ 13
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
I I 6.00
I 2 6.00
1 3 6.00
1 4 6.00
I 5 6.00
DATE
TESTED
01/15/1999
01115/1999
02/0511999
02/0511999
REPORT OF TESTS ACCVm~AU~ YARDS: 40
MAXIWIUM COMPRESSIVE
AGE LOAD STRF~GTH
(days) (lbs. force) (psi)
7 1733OO 6130
7 163110 5770
Average 5950
28 22O96O 7810
28 22926O 8110
Average 7960
0310511999
56
Technician: Mike Odom
Report Distribution:
(I) Th~ Beck Group
(I) Gromaizky Dup~ee & Assoc.
(I) Brocketle Davis Drake, Inc.
(i) The Beck Group
Started: l:oopm
(I) The Beck Group
(!) Dalcan, Inc.
Finished: 4:00pm
EUgene Harbour
Vice President
This repo~ is exclusively for the use of the client indicated above and shall not be reproduced except in full without tbe written approval of HBC Eagincering, Inc.
Page I of 1
0ILL
CONCRETE COMPRESSIVE STRENGTH TEST
8901 Carpenter Frwy., Suite #100
Dallas, Texas 7S247
Date of Service: 01/28/1999
Client No.: 08644025
Report No.: 9903452 Report Date
02/0811999
Project No.: 43-2333-98
Client:
The Beck Group
Attn: Oillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
cot, rrRAcxoR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFIC. AXION REQUIREMENTS
STREN(;Tm 5000 psi @ 28 Days
SLb~P: 6.0" Max
AIR: N/A
Tg.Vr MrmOD: ASTM C- 143
ASTM C-172
ASTM C-39
SAMPLE LOCATION: Beam along midway line
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
I I 5.75 01/31/1999
PROJECT DATA
CONCRETE CLASS: 8208
PLACEME~ DATE: 01/28/1999 BATCH TIME: 6:47am
TIME SAMPLED: 7:15am BY: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 457
AIR co~rmNT 1~): N/A
PLACEMENT LOCATION:
Cloudy
61 F CONCPA'T~: 72 F
TICKm'NO: 1227414
UNIT WEIGHT (pcf~ N/A
Building shb Level V (SB) 5.7-B, A-D & E-H
REPORT OF TESTS ACCt V A VE YARDS: 530
COMPRESSIVE
AGE LOAD STRENGTtl FRACTURE
(days) (lbs. force) (psi) TYPE
3 1071 lO 3790
I 2 5.75 02/04/1999 7 130570 4620
I 3 5.75 02/0411999 7 134800 4770
Average 4700
5.75 02125/1999 28
5.75 02/2511999 28
I 6 5.75 03/25/1999 56
OILL
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page I of 8
CONCRETE COMPRESSIVE STRENGTH TEST
8901 Carpente~ Frwy., Suite #100
Dallas, T~ 75247
Date of Service:
Client No.:
Client:
01/28/1999
08644025
The Beck Group
ARm Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Report No.: 9903452
Report Date
02/08/1999
Project No.: 43-2333-98
Project:
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
co~rrRAc'rom BECK
coNcRE'r~ SUPPLmm TXI
pLA~: 41
svzc~cn~o~ ~QO~~
~a~: 5~ psi ~ 28 Days
sL~: 6.0" Max
nm: N/A
~ ~om ASTM C- 143
ASTM C-172
ASTM C-39
PROJECT DATA
cobicggTE cLASS: 8208
pLAczMgt,rr OATE: 01/28/1999 BATCH TIME: 7:55am
TIME SAMPLED: 8:55am BY: Mike Odom
WEATII~R CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK biO: 462
AIR cot, erfurt (~): N/A
PLACEMENT LOCATION:
Sec page I
Cloudy
63 v coscREaag: 76 v
XlCr~V NO: 1227529
UNIT WEIGHT (pc2)3 N/A
SAMPLE LOCATION:
CYLINDER
MARKED
SET NO.
Along Line C & 6.5
MF, ASURED
SLUMP
(inch.)
2 1 5.25
2 2 5.25
2 3 5.25
2 4 5.25
2 5 5.25
2 6 5.25
REPORT OF TESTS
DATE AGE
TESTED (days)
01/3111999 3
02/04/I999 7
02/04/1999 7
02/25/1999 28
02/25/1999 28
03/25/1999 56
ACCUMULATIVE YARDS: 530
MAXIbIUM COMPRESSIVE
LOAD STRENGTII
(Ib~. force) (psi)
FRACTURE
TYPE
106530 3770
126470 4470
I30610 4620
Average 4550
OILL
This rcpotl is exclusively for thc usc of the client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc.
Page 2 of 8
Re.port No.: 9903452
Ten (10) gallons of water added.
OILL
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 3 of 8
CONCRETE COMPRESSIVE STRENGTH TEST
8901 Carpenter Frwy., Suite #100
Dallas, Texas 7S247
Date of Service: 01/28/1999 Report No.: 9903452 Report Date
02/08/1999
Client No.: 08644025 Project No.: 43-2333-98
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTm~CTOm BECK
CONCRetE SUPPLIER: TXI
PCAh'r: 41
SPECIFICATION REQUIREMENTS
SXaZNt;Ttt: 5000 psi @ 28 Days
SLUMV: 6.0" Max
Aim N/A
TEST METIIOD: ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: Along K & 9.3
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inches)
3 1 5.75
3 2 5.75
3 3 5.75
3 4 5.75
3 5 5.75
3 6 5.75
DATE
TESTED
01/31/1999
PROJECT DATA
CONCm~T~ CLASS: 8208
PLACI,~VIEHT DAT~-: 01/2811999 BATCH TIME: 8:41am
TIME SAMPLED: 9:55am BY: Mike Odom
WEATIIER CONDITIONS:
TEMPERATURE (1;3 - AIR
TRUCK NO: 360
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
See page I
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (lbs. force)
3 90130
02/0411999
02/0411999
02/2511999
02/2511999
Cloudy
65 F CONCmgTg: 73 F
TICr~'rNO: 1227584
UNITWEIGtIT(pc~ N/A
03/25/1999
7 120460
7 118460
Average
28
28
ACCUMULATIVE YARDS: 530
COMPRESSI~
STRENGTH FRACTURE
(psi) TYPE
3190
4260
4190
4230
56
0ILL
This repo~ is exclusively for the usc of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. inc.
Page 4 of 8
Report No.: 9903452
Twenty (20) gallons of water added.
OILL
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 5 of 8
CONCRETE COMPRESSIVE STRENGTH TEST
· 8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
Date of Service: 01/28/1999 Report No.: 9903452 02/08/1999
Client No.: 08644025 Project No.: 43-2333-98
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOm BECK
COnCRETESm'PLmR: TXI
PLANT: 4 l
SPECIFICATION REQUIREMENTS
s~Gxm 5000 psi @ 28 Days
SLUM~: 6.0" Max
AIR: N/A
TFZT M~"nIOm ASTM C- 143
ASTM C-172
ASTM C-39
PROJECT DATA
CO~CR~r~ CLASS: 8208
pLACZMZNT DATZ: 01/28/1999 BATCH TIME: 9:39am
TIME SAMPLED: 10:45am BY: Mike Odom
WEATHER CONDITIONS:
TElVlPERATURE (F) - AIR
TRUCK NO: 414
Am cot,vrgNT (%): N/A
PLACEMENT LOCATION:
See page 1
Cloudy
66 F CONCRETe: 73 V
TICr~T NO: 1227664
UNIT WEIGHT (pcB: N/A
SAMPLE LOCATION:
CYLINDER
MARKED
SET NO.
Along G & 11.5
MEASURED
SLUMP
(tnch~s)
4 I 6.00
4 2 6.00
4 3 6.00
4 4 6.00
4 5 6.00
DATE
T~VI~D
01/30/1999
REPORT OF TESTS
AGE LOAD
(days) (lbs. force)
2 65040
02/04/1999
02/04/1999
02/25/1999
02/25/1999
7 118460
7 124150
Average
28
28
ACCUMULATIVE YARDS: 530
COMPRESSIVE
STRENGTH FRACTURE
(psi) TYPE
2300
4190
4390
4290
4 6 6.00
03/25/1999
56
0ILL
This repotl is exclusively for the usc of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, lac.
Page 6 of 8
Report No.:
9903452
Twenty (20) gallons of water added.
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 7 of 8
CONCRETE COMPRESSIVE STRENGTH TEST
ENGINEERI~, INC.
8901 Carpenter Fray., Suite #100
Dallas, Texas 7S247
Date of Service: 01/28/1999 Report No.: 9903452 Report Date
02/08/1999
Client No.: 08644025 P£oject No.: 43-2333-98
Client:
The Beck Group
Atto: Gillett Berger
1700 Pacific Ave.. Suite 3800
Dallas TX 75201-4619
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell. Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
co~crom BECK
CONCRE'r~surrLma: TXI
PLA~rr: 41
SPECIFICATION REQUIREMENTS
sTiu~Na~: 5000 psi @ 28 Days
SLUM~: 6.0" Max
Am: N/A
TEST MZ-nlOO: ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRE~r~ CLASS: 8208
PLACEMENT DATE: 01/2811999 BATCH T~M~: 11:12am
T~SAMPLED: 12:lSpm BY: Mike Odom
WEATI~R COHDITIONS:
TEMPERATURE (V) - AIR
TRUCK NO: (~0
Am CO~NT (~,): N/A
PLACEMENT LOCATION:
Sec page I
Cloudy
69 r CONCRm~: 76 r
aaClCZ~r NO: 1227767
uNrr w~mtrr (pet)..- N/A
SAMPLE LOCATION: E.5 & 11.5
CYLINDER MEASURED
MARKED SLUMP
SET NO.
5 I 5.50
REPORT OF TESTS
DATE AGE LOAD
TESTED (days) Obs. force)
01/30/1999 2 69150
ACCUMULATIVE YARDS: 520
COMPRESSIVE
STRENGTH FRACTURE
(l~t) TYPE
245O
5 2 5.50
5 3 5.50
5 4 5.50
5 5 5.50
02/0411999 7 122860
02/04/1999 7 126720
Average
02/2511999 28
02/25/1999 28
4340
4480
4410
5 6 5.50
Technician: Mike Odom
Report Distribution:
(1) Tbe Beck Group
(1) Gromatzky Dupree & Assoc.
(I) Brockette Davis Drake, Inc.
(I) The Beck Group
03/2511999 56
Started: 6:00am
(I) The Beck Group
(I) Dalcan, Inc.
Finished: l:30pm
~ Engl~
Eugene Harbour
Vice President
This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 8 of 8
coNcRETE ,
· ' COMPRESSIVE STRENGTH TES I'
8..901 Carpenter Frwy., Suite #100
Dallas, T~xa~ 75247
Date of Service: 01/06/1999
Client No.: 08644025
Client: The Beck Group
Services:
Report No,: 9901295
Report Date
02/08/1999
Project No.: 43-2333-98
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Projec~ GT~S~
Coppell Road & Corporate Drive
Coppell, Texas
Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples·
PROJECT DATA
coterRAcToa: BECK CONCRETE Ct. ASS: 8208
CONC~ SUPPLIEg: TXI PL~,CF, MENT DAT~: 01/~/I999 BATCIt T~E: 2:52pm
p~: 41 Tree SAMPLED: 3:45pm BY: Mike Odom
SPECIFICA~ON ~QUI~M~ WEAT~R CO~IONS: Fair
S~GTm 5~ psi ~ 28 Days ~E~(~-Am 38 g CONC~TE: ~ F
SC~: 6.0" Max xa~C~O: 803 ~C~ ~o: 1207387
AIR: N/A AIR CO~ (%): N/A UNIT WEIGHT (~O:. N/A
P~CEME~ ~CATION:
T~ M~IIOD: ASTM C- 143 ~vel Iii building s~b A-d, 5.7-8. N-Jg-10, E-H, 11-13
ASTM C- 172
ASTM C-39
SAMPLE LOCATION:
A.5 @ 6.5
REPORT OF TESTS ACCtn CATIVE YARDS: 550
CYLINDER MEASURED MAXIblUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTIt FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
I I 6.25 01/08/1999 2 73660 2600
I 2 6.25 01/13/1999 7 161290 5700
1 3 6.25 01/13/1999 7 156890 5550
Average 5630
I 4 6.25 02/03/1999 28 206380 7300
I 5 6.25 02/03/1999 28 203710 7200
Average 7250
I 6 6.25 03/03/1999 56
0ILL
This report is exclusively for the use of ~he client indicated above and shall not be reproduced except in full wilhout the written approval of HBC Engineering, Inc.
· Page I of 6
Report No.:
9901295
Note: Ail slumps taken at hopper.
OILL
This report is exclusively for thc usc of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 2 of 6
CONCRETE COMPRESSIVE STRENGTH TEST
8901 Carpenter FrwY., Suite #100
Dallas, Texas 75247
Date of Service:
Client No.:
01/06/1999
08644025
Report No.: 9901295
Project No,: 43-2333-98
Report Date
02/08/1999
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCR_~I'~ SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
S~(;TH: 5000 psi @ 28 Days
SLUMP: 6.0" Max
AIR: N/A
TEST ME~IOD: ASTM C- 143
ASTM C-172
ASTM C-39
SAMPLE LOCATION:
Level I11 @ Lines C @ 6
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inches)
2 1 6.50
2 2 6.50
2 3 6.50
2 4 6.50
2 5 6.50
2 6 6.50
DATE
TESTED
01/08/1999
PROJECT DATA
CONCgZTE CLASS: 8208
PLACEMENT DATE: 01/06/1999 BATCH'rn~dg: 4:36am
TIME SAMPLED: 5:00am BY: Mike Odom
WEATItER CONDITIONS:
TEMPERATURE {F) - AIR
TRUCK NO: 711
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
See page I
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (lbs. force)
2 76480
01/13/1999
01/13/1999
02/03/1999
02/03/1999
Foggy
37 F CONCRETE: 55 F
TICKET NO: 1207469
u~Tr WEIGHT (p~0:. N/A
03/03/1999
7 158550
7 168770
Average
28 211080
28 216960
Average
56
ACCUMULATIVE YARDS: 550
COMPRESSIVE
STRENGTtl FRACTURE
(psi) TYPE
27OO
5610
5970
5790
7460
7670
7570
0ILL
This report is exclusively for ~he use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 3 of 6
CONCRETE COMPRESSIVE STRENGTH TEST
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 01/06/1999
Client No.: 08644025
Report No.: 9901295 Report Date
02/08/1999
Project No.: 43-2333-98
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
coNTRAcrom BECK
CONCRETE SUPPLIER: TXI
rLAt~rr: 41
SPECIFICATION REQUIREMENTS
STRENGTH: 5000 psi @ 28 Days
SLUMP: 6.0" Max
AIR: N/A
T~"r ME~IOD: ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: @ N-9
PROJECT DATA
CONCP, m~ CLASS: 8208
rLAc~rr on~: 01/06/1999 BATCH TIME: 5:52am
TnviE SAMPLED: 6:15am BY: Mike Odom
WEArIER COt~OmONS: Foggy
TEMPERATURE (F). AIR 34 F CONCRETE: 59 F
TRUCKNO: 805 TICKET NO: 1207562
AIR CONTENT (%): N/A UNIT WEIGHT (pc0:. N/A
PLACEMENT LOCATION:
See page I
REPORT OF TESTS ACCUMULATIVE YARDS: 550
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTII FRACTURE
SET NO. (inches) T~ESTED (days) (lbs. force) (psi) TYPE
3 I 5.25 01/09/1999 3 123560 4370
3 2 5.25 01/13/1999 7 165230 5840
3 3 5.25 01/13/1999 7 175830 6220
Average 6030
3 4 5.25 02/03/1999 28 214280 7580
3 5 5.25 02/03/1999 28 216240 7650
Average 7620
3 6 5.25 03/03/1999 56
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0iLL Page 4 of 6
CONCRETE COMPRESSIVE STRENGTH TESqt'
Date of Service: 01/06/1999 Report No.:
Client No.: 08644025 Project No.:
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
.8.901 Carpenter Frwy., Suite #100
DalI~; T,~p_~ 75247
9901295 Report Date
02/08/1999
43-2333-98
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
COn~atCTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
STR~GTm 5000 psi @ 28 Days
SLU~P: 6.0" Max
AIR: N/A
TEST METIIOD: ASTM C- 143
ASTM C-172
ASTM C-39
SAMPLE LOCATION:
Along Line M @ 9.7
PROJECT DATA
COt~CRE'TE CLASS: 8208
PLACI~IENT DATE: 01/06/1999 BATCH TIME: 7:30am
TIME SAMPLED: 8:00am BY: Mike Odom
W~TmgR CONDrnONS: Foggy
TEMPERATURE (F) - AIR 37 v CONCRETe: 61 F
TRUCK NO: 711 TICKET NO: 1207717
AIR cot~rr~NT (%): N/A um'r WEIGHT (pc0: N/A
PLACEMENT LOCATION:
See page I
REPORT OF TESTS ACCUMULATIVE YARDS: 540
CYLINDER MEASURED MAXIMUM. COMPRESSIVE
MA RKED SLUMP DATE AGE LOAD STRENGTH FRA C'I~RE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
4 I 6.75 0 !/09/1999 3 102530 3630
4 2 6.75 0 l/l 3/1999 7 167960 5940
4 3 6.75 01/13/1999 7 158590 .5610
Average 5780
4 4 6.75 02/03/1999 28 209840 7420
4 5 6.75 02/03/1999 28 214390 7580
Average 7500
4 6 6.75 03/03/1999 56
This repofl is exclusively for the usc of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 5 of 6
CONCRETE COMPRESSIVE STRENGTH
Date of Service: 01/06/1999 Report No.:
Client No.: 08644025 Project No.:
Client: The Beck Group Project:
Attn: Oillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 752014619
8.~1 Cgp~t~- ['rwy., Suit~
Dallas, T~a, 7S247
9901295 Report Date
02/08/1999
43-2333-98
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRAcroR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
STRE~OXm 5000 psi @ 28 Days
SLUm': 6.0" Max
AIR: N/A
TEST MmnIOD: ASTM C-143
ASTM C-172
ASTM C-39
PROJECT DATA
CONCRETE ct~,ss: 8208
PLACEMENT DATE: 01106/1999 aATCH T~m~: 9:00am
TIME SAMPLED: 9:30am aY: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
T~UCK NO: 715
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
Sec page I
Foggy
43 F CONCRm~: 63 ~
TXCKETNO: 1207930
uNrr WEIGHT (pc0:. N/A
SAMPLE LOCATION: Along F.5 @ 12.5
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inches)
5 I 6.00
REPORT OF TESTS
DATE AGE LOAD
TESTED (days) (lbs. force)
01/09/1999 3 106360
ACCUMULATIVE YARDS: 540
COMPRESSIVE
STRENGTH FRACTURE
(psi) TYPE
3760
5 2 6.00
5 3 6.00
5 4 6.00
5 5 6.00
5 6 6.00
Technician: Mike Odom
Report Distribution:
(1) The Beck Group
(I) Gromatzky Dupree & Assoc.
(I) Brockette Davis Drake, Inc.
(1) The Beck Group
01/13/1999 7 188810
01/13/1999 7 178660
Average
02/03/1999 28 225460
02/03/1999 28 225480
Average
03/03/1999 56
Started: 2:00am
(1) The Beck Group
(I) Dalcan, Inc.
Finished: 10:30am
6680
.6320
6500
7970
7970
7970
H~~u~~~~Inc'
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of H BC Engineering, Inc.
0ILL Page 6 of 6
CONCRETE COMPRESSIVE STRENGTH TEST
8~01 Carpenter Frwy., Suite #100
Dallas, Texas 7S247
Date of Service: 01/0811999
Client No.: 08644025
Report No.: 9901545
Project No.: 43-2333-98
Report Date
02/0811999
Client: The Beck Group Project:
Attn: Oillett Berger
1700 Pacific Ave., Suit~ 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CO~raACrOa: BECK CONCaET~ CLASS: 8205
CONCRETE SUPPLIER: TXI PLACEMFANT DATE: 01/08/1999 BATCH TUV~: 2:57am
PLANT: 41 TIME SAMPLED: 3:30am BY: Mike Odom
SPECIFICATION REQUIREMENTS WEATI~R COMMONS: Foggy
STa~OTm 4000psi @ 28Days TEMI'ERAXU~(g)-Am 46 F coNcg~-r~: 61 F
SLUM~: 6.0" Max TgUCK NO: 474 TICKET NO: 1209931
AIR: 3-6% AIR CONTENT (~): 4.8 uNrr w~iG~rr (~0.: N/A
TEST METHOO: ASTM C- 143 PLACEMENT LOCATION:
Ho~h paving limits ~o bay 4.5& 6
ASTM C- 172 N limits bay ? to 50' south of third island
ASTM C-39
SAMPLE LOCATION: See Below
CYLINDER MEASURED
MARKED SLUMP
SET NO. (h~h~)
1
1 2
I 3
I 4
REPORT OF TESTS ACC OLATrV YARDS: 450
MAXIMUM COMPRESSIVE
DATE AGE LOAD STRENGTH
TESTED (days) (lbs. force) (psi)
6.00 01/15/1999 7 114020 4030
6.00 01/15/1999 7 1235:30 4370
Average 4200
6.00 02/05/1999 28 153280 5420
6.00 02/05/1999 28 133150 4710
Average 5070
1 5 6.00 03/0511999 56
FRACTURE
TYPE
Sample location: Bay 5, inside 31D island bullnose west from east limits. Ten
gallons of water added.
0ILL
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page I of 5
CONCRETE COMPRESSIVE STRENGTH TEST
~901 Carpenter Frwy., Suite #100
Dallas, Tex~s 75247
Report Date
Date of Service: 01/08/1999 Report No.: 9901545 02/08/1999
Client No.: 08644025 Project No.: 43-2333-98
Client: The Beck Group Project:
Atto: Oilier Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONT~.S. CTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECWlCATION REQUIREMENTS
STRENaTm 4000 psi @ 28 Days
SLUM~: 6.0" Max
AIR: 3-6%
TEST Sm'mOD: ASTM C- 143
ASTM C-172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 8205
~..ACEIVW.=wr DATE: 01/08/1999 aATCH TISm: 4:08am
TIME SAMI~ED: 4:35am aY: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F). AIR
TRUCK NO: 389
AlE cowrie' (~): 4.7
PLAC~ LOCATION:
See page 1
Foggy
46 F CONCRETE: 58 F
TICKETNO: 1209979
uNrr WEi~rr (p~0..' N/A
SAMPLE LOCATION:
See below
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inehes) TESTED (days) (lbs. force)
2 1 6.25 01/15/1999 7 102250
2 2 6.25 01/15/1999 7 96040
Average
2 3 6.25 02/05/1999 28 128430
2 4 6.25 02/05/1999 28 143400
Average
2 5 6.25 03/05/1999 56
ACCUMULATIVE YARDS: 450
COMPRESSIVE
STRENGTH
(psO
3620
3400
3510
4540
5070
4810
FRACTURE
TYPE
Sample location: Bay 7, 20' south from centerline northeast driveway.
Slump taken at hopper.
0ILL
This repot~ is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 2 of $
· CONCRETE COMPRESSIVE STRENGTH TEST
Date of Service:
Client No.:
0110811999
08644025
Report No.: 9901545
Project No.: 43-2333-98
Carpenter Frwy. Suite #100
Dallas, Tm~ 75247
Report Date
02/0811999
Client:
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of flesh concrete at the placement locations, perform required field test and cast
compressive strength samples.
cor~RAcroR: BECK
CONCRET~ SUPPLmR: TXI
e~: 41
SP~C~ICA~ON ~QUI~~
~Na~: ~ psi ~ 28 Days
SL~: 6.0" M~
Am: 3~%
~ ~O~: ASTM C-143
AS~ C-172
ASTM C-39
PROJECT DATA
CONCRET~ CLASS: 8205
PLACEMENT DATE: 01/0811999 BATCH Tn~: 5:08am
TI~SAMPLED: 5:45am BY~ Mike Odom
WEATHER CONDITIONS: Foggy
TEMPERATURE (F). Am 46 F CONCRETE: 63 P
TRUCKNO: 802 ~Cg~TNO: 12110033
Am Cotvr~NT (~): 5.0 uNrr w~iGtrr (oct): N/A
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: See below
REPORT OF TESTS ACCtrm~X~VE YARDS: 450
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH
SET NO. (Inches) TESTED (days) (lbs. force) (psi)
3 1 6.00 01/15/1999 7 107030 3780
3 2 6.00 01/15/1999 7 100920 3570
Average 3680
3 3 6.00 02/05/1999 28 162200 5740
3 4 6.00 02/05/1999 28 159860 5650
Average 5700
3 5 6.00 03/05/1999 56
FRACTURE
TYPE
Sample location: Bay 6 centerline area, 20' south from northern islands. Ten
gallons of water added.
0ILL
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 3 of 5
CONCRETE COMPRESSIVE STRENGTH TEST
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75:/47
Date of Service: 01/08/1999
Client No.: 08644025
Client: The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Report No.: 9901545
Project No.: 43-2333-98
Report Date
02/08/1999
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
COt~rrRACTOR: BECK
CO~CU'r~soPPLmR: TXI
Pur~rr: 41
SPEC~I~ON ~UI~~
S~G~: 4~ psi ~ 28 Days
SL~: 6.0" M~
~ 3~%
~ M~oo: AS~ C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONC~ CUSS: 8205
r~c~w~rr DA~: 01/08/1999 BATCH Tram: 6:12am
Tn~E SA~'LED: 7:10am BY: Mike (Mom
W~R cotgnmoNs: Light fog
~as~ERA~Ut~.Am 45 V CONC~ 63 r
~UCK ~O: 474 T~C~NO: 1210112
Am co~ (%): 5.2 ~ ~tG~ (~0~ N/A
P~C~ L~A~ON:
page I
SAMPLE LOCATION: Bay 4 centerpoint a~ea
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inch~s)
4 I 6.00
4 2 6.00
4 3 6.00
4 4 6.00
4 5 6.00
DATE
TESTED
01/15/1999
01/15/1999
02/05/1999
02/05/1999
REPORT OF TESTS ACCtn XUX v VAI S: 450
MAXIMUM COMPRESSIVE
AGE LOAD STRENGTH
(d~ys) Olin force)
7 114320 4040
7 122400 4330
Average 4190
28 155570 5500
28 152090 5380
Average 5440
03/05/1999
56
FRACTURE
TYPE
Ten gallons of water added.
0ILL
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wriuen approval of HBC Engineedng, Inc.
Page 4 of $
CONCRETE COMPRESSIVE STRENGTH TEST'
8901 Carpenter Frwy. Suite #I00
l~lt~; Texas 75247
Report Date
Date of Service: 01/08/1999 Report No.: 9901545 02/08/1999
Client No.: 08644025 Project No.: 43-2333-98
Client: The Beck Group Project:
Atto: Oillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
coto'a~R: BECK
CONCRETE SUPPLIER: TXI
PLA~: 41
SP~-Cn~CATXON m~UI~
~a~: ~ psi ~ 28 Days
SL~: 6.0" M~
n~ 3~%
~x ~oo: ASTM C-143
ASTM C- ~72
AS~ C-39
PROJECT DATA
CONCRE'r~ CLASS: 8205
PLACE~ DATE: 01/08/1999 BATCH TIME: 8:01am
Tnvms,*mn'LED: 8:30am BY: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F). AIR
TRUCK NO: 802
AIR COt, n'ENT (~): 5.0
PLACEMENT LOCATION:
Sec page !
Cloudy
43 w CONCit~'TE: 60 F
TICKETNO: 1210298
UmTWgXG~rr(p~); N/A
SAMPLE LOCATION: See below
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
5 I 6.25 01/15/1999
5 2 6.25 01/15/1999
5 3 6.25 02/05/1999
5 4 6.25 02/05/1999
REPORT OF TESTS ACCUMULATIVE YARDS: 500
MAXIMUM COMPRESSIVE
AGE LOAD STRENGTH
(days) (lbs. force) (psi)
7 130550 4620
7 131110 4640
Average 4630
28 173500 6140
28 194780 6890
Average 6520
5 5 6.25 03/05/1999
Sample location: Bay 7 centerpoint area 20'
bullnose. Ten gallons of water added.
Technician: Mike Odom
Report Distribution:
(I) Thc l~ck Group
(I) Gromatzky Duprce & Assoc.
(1) Brocket~c Davis Drake, Inc.
(1) The Beck Group
56
FRACTURE
TYPE
south of third
Started: 2:00am Finished: 9:30am
(1) The Beck Group
(1) Dalcan, Inc.
southern island
~ Engine.
Eugene Harbour
Vice President
This report is exclusively for thc use of thc client indicated above and shall not be reproduced except in full without the writ~n approval of HBC Engineering, Inc.
0tLL Page 5 of 5
CONCRETE COMPRESSIVE STRENGTH TEST
.. 8901 Carpenter Frwy., Suite #100
Dallas, T~,as 75247
Report No.: 9901423 Report Date
02/0811999
Date of Service: 01/07/1999
Client No.: 08644025
Client: The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Project No.: 43-2333-98
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
coma~cxoa: BECK CONCgETg Ct, ASS: 8208
CONCRg'm strePLrga: TXI P~c~ one: 01/07/1999 BATCH T~E: l:48pm
P~: 31 T~E SAMPLED: 2:30pm BY: Mike Odom
SPEC~ICA~ON ~QUI~M~ WEAT~R commons: PaRly cloudy
~NG~: 5~ psi ~ 28 Days
sc~: 6.0" M~ TaUCg ~O: 482 ~C~NO: 12~677
AIR: N/A Am CO~ (~): N/A ~ ~xG~ (~: N/A
TEST ~OD: AS~ C-143 P~C~ ~CATION:
~vel IV ~i~ing c~ums 19 9 A, B, C, D-6, A, B, C ~ 7, AB & 8,N, M, ~ K ~ 9, P, N,
AS~ C-t72 M.
ASTM C-39
SAMPLE LOCATION: A@ 6
REPORT OF TESTS Acc t XIVE YARD : 40
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
I I 6.50 01/08/1999 I 46870 1660
1 2 6.50 01/09/1999 2 57350 2030
1 3 6.50 01/14/1999 7 112220 3970
1 4 6.50 01/14/1999 7 118060 4180
Average 4080
I 5 6.50 02/0411999 28 145940 5160
I 6 6.50 02/04/1999 28 149460 5290
Average 5230
OILL
This report is exclusively for the use of the client indicated above nnd shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 1 of 2
Report No.: 9901423 - H~
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 ? 6.50 03/04/1999 56
Technician: Mike Odom
Report Distribution:
(I) The Beck Group
(1) Oromatzky Dupree & Assoc.
(1) Brockeue Davis Drake, Inc.
(I) The Beck Group
Started: 2:00pm
(1) The Beck Group
(!) Dalcan, Inc.
Finished: 5:30pm
~ Engineer~n c~.
Eugene Harbour
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 2 of 2
'CONCRETE COMPRESSIVE STRENGTH TEST
.. 8901 Carpenter Fray., Suite #100
Datlas, Texas 7S247
Date of Service: 01/07/1999 Report No.: 9901422 Report Date
02/0811999
Client No.: 08644025
Project No.: 43-2333-98
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of flesh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACrOR: BECK
CONCRE:I~ SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi @ 28 Days
SLC~a': 6.0" Max
AiR: 3-6%
TEST ~-'rHoo: ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRE'rE CLASS: 8205
PLACEMENT DATE: 01/07/1999 BATCH TXM~: 3:17am
TIME SAMPLED: 3:55pm BY: Mike Odom
W~,TItER CONDrrloNs: foggy
TEMPERATURE (F). AIR 47 g CONCRE~r~: 61 g
T~UCK NO: 451 tlCg,~'r NO: 1208709
Am coro'gNT Os): 5.9 ~ w~i(;trr (L~:0: N/A
PLACEMENT LOCATION:
Paving Bay I & nor'd~.ast drive,
Bay 4-7
SAMPLE LOCATION:
See below
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
1 I 5.50 01114/1999
I 2 5.50 01/1411999
I 3 5.50 02/0411999
1 4 5.50 02/04/1999
REPORT OF TESTS ACCUMULATIVE YARDS: 590
MAXIMUM COMPRESSIVE
AGE LOAD STRENGTII
(days) (lbs. force) (psi)
7 106180 3750
7 96170 3400
Average 3580
28 128760 4550
28 142760 5050
Average 4800
I 5 5.50 03/04/1999 56
Sample location: Centerline area Bay 1
bullnose. Slump taken at truck hopper.
between west inside eastern third island
FRACTURE
TYPE
This report is exclusively for the use of the client indicated above and shall not I~ reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page I of 5
CONCRETE COMPRESSIVE STRENGTH TEST
Date of Service: 01/07/1999
Client No.: 08644025
.. 8901 Carpenter Frwy., Suite #10C
Dallas, Texas 7524~
Report No.: 9901422 Report Date
02/0811999
Project No.: 43-2333-98
Client: The Beck Group Project:
Attn: Gillctt Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTR~,CTOm BECK
CONCRETE SUPPLIER: TXI
PLAWr: 41
SPECIFICATION REQUIREMENTS
STREN(;Tn: 4000 psi @ 28 Days
SLUMP: 6.0" Max
AIR: 3-6%
TEST ME'mOD: ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION:
See below
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
(ineh~s)
2 I 6.50
2 2 6.50
2 3 6.50
2 4 6.50
2 5 6.50
Sample location: Bay (W)
(N) lane
PROJECT DATA
CONCRETE CLASS: 8205
PLACF, MENT DATE: 01/07/1999 BATCH TIME: 5:08am
TIME SAMPLED: 6:00am BY: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUC~:NO: 712
Am CONTENT (%): 5.8
PLACEMENT LOCATION:
See page I
cloudy
47 F CONCggTE: 59 F
TicicEr NO: 1208736
uNrr WEIGHT (pe~: N/A
REPORT OF TESTS
MAXIMUM
DATE AGE LOAD
TESTED (days) (lb~ force)
01/14/1999 7 95660
01/14/1999 7 102850
Average
02/04/1999 28 134190
02/0411999 28 129280
Average
03/04/1999 56
ACCUMULATIVE YARDS:
COMPRESSIVE
STRENGTH
(psi)
3380
3640
3510
4750
4570
466O
1/2, 70' (N) from centerline
560
FRACTURE
TYPE
This repor~ is exclusively for ~he use of the client indicated above and shall no~ be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 2 of 5
CONCRETE COMPRESSIVE STRENGTH TEST
I~GINi~P~, l~.
890! Carpenter Frwy., Suite #100
Dallas, Tens 75247
Date of Service:
Client No.:
Client:
01/0711999
0864.4025
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 752014619
Report No.: 9901422
Project No.: 43-2333-98
Report Date
02/08/1999
Project:
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRt, CTOR: BECK
CONCRE'I'E SUPPLIER: TXI
PLAwr: 41
SPECIFICATION REQUIREMENTS
STlUgNGTH: 4000 psi @ 28 Days
SLUMP: 6.0" Max
AIR: 3-6%
TEST METHOD: ASTM C- 143
ASTM C-172
ASTM C-39
SAMPLE LOCATION:
See below
PROJECT DATA
CONCRETE CLASS: . 8205
PLACFaMENT DATE: 01/07/1999 BATCH TIME: 6:57am
TIME SAMPLED: 8:00am sv: Mike Odom
WEATtmR CoN~mONS: Foggy
T~M~V.n.~-~JlUg (~.AIR 49 F CONCaZ"r~: 61 F
TRUCgNO: 451 'rlC~mTNO: 1208709
AIR cot, rr~NT (,~): 4.7 tn, aT W~I(;ItT (t~: N/A
PLACEMENT LOCATION:
See page !
REPORT OF TESTS ACCUMULATIVE YARDS: 560
CYLINDER MEASURED MAXIMUM COMPRE~IVE
MARKED SLUMP DATE AGE LOAD STRF_...NGTH
SET NO. (inches) TESTED (days) (lbs. force) (psi)
3 I 6.75 01 / 14/1999 7 100940 3570
3 2 6.75 01/14/1999 7 107170 3790
Average 3680
3 3 6.75 02/04/1999 28 124120 4390
3 4 6.75 02/04/1999 28 134750 4770
Average 4580
3 5 6.75 03/04/1999 56
FRACTURE
TYPE
Sample location: Centerline area northeast driveway thru centerline of Bay 4.
Slump was taken at truck hopper.
0ILL
This rep4:nl is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 3 of 5
CONCRETE COMPRESSIVE STRENGTH TEST
.. 8901 Carpenter Frwy., Suite #I00
Dallas, Taas 75247
Date of Service:
Client No.:
01/07/1999
08~.025
Report No.: 9901422
Project No.: 43-2333-98
Report Date
02/08/1999
Client:
The Beck Group
Attn: Oillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
coNTRAcroR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECn~ICAT~ON REQUXR.V~
STRENOTH: 4000 psi @ 28 Days
SLUMI,: 6.0" Max
AIR: 3-6%
TEST MgmOD: ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 8205
PLACElVlF.~ DATE: 01/07/1999 BATCXt TIME: 8:50am
TIME SAMPLED: 9:30am BY: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F). AIR
TRUCKNO: 715
Am CotcrENT (%): 4.6
PLACEMENT LOCATION:
See page 1
Foggy
54 F CONCRETE: 64 F
TICKET NO: 1209112
vt~rr w~m~rr ( .p~-0: N/A
SAMPLE LOCATION: Northeast drive @ centerline Bay 6
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
0n~hes)
4 1 6.00
4 2 6.00
4 3 6.00
4 4 6.00
4 5 6.00
REPORT OF TESTS
DATE
TESTED
01/14/1999
01/14/1999
AGE
(days)
7
7
28
28
02/04/1999
02/04/1999
03/04/1999
56
MAXIMUM
LOAD
(lbs. force)
118520
114860
Average
159920
140190
Average
ACCUMULATIVE YARDS: 560
COMPRESSIVE
STRENGTH
(psi)
4190
4060
4130
5660
4960
5310
FRACTURE
TYPE
Slump taken at truck hopper.
0ILL
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 4 of 5
CONCRETE COMPRESSIVE STRENGTH TEST
.. 8901 Carpenter Frwy., Suite #100
Dallas, T~ts 7S247
Date of Service: 01/07/1999
Client No.: 08644025
Report No.: 9901422 Report Date
02/08/1999
Project No.: 43-2333-98
Client:
The Bock Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
COt~aAcrom BECK
CONCRETE SUPPLIER: TXI
PLANT: .41
SPECIFICATION REQUIREMENTS
SXg~OXH: 4000 psi @ 28 Days
SLt~Vn': 6.0" Max
AIR: 3-6%
T~T M~mOD: ASTM C- 143
ASTM C-172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 8205
tn.~,C,WM~vr DATE: 01/07/1999 EATCtl xn~m: 10:54am
XtM~ SAMPLV-D: l 1:35am ax': Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (Ir). AIR
TRUCK NO: 420
AIR CONTENT(%): 5.0
PLACEMENT LOCATION:
See pagc 1
Cloudy
56 F CONCRETE: 59
~cr~-'r NO: 120935
uNrr W~IGtiT (090: N/A
SAMPLE LOCATION: See below
REPORT OF TESTS ACCUm T YARD : 560
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH
SET NO. (inches) TESTED (days) (lbs. force) (psi)
5 1 6.50 01/14/1999 7 119320 4220
5 2 6.50 01/14/1999 7 113470 4010
Average 4120
5 3 6.50 02/04/1999 28 149650 5290
5 4 6.50 02/04/1999 28 147110 5200
Average 5250
5 5 6.50 03/04/1999 56
FRACTURE
TYPE
Sample location: East end (NE) driveway inside and between last eastern island at
centerline Bay 7. Slump was taken at truck hopper.
Technician: Mike Odom Started: 2:00am Finished: 12:00pm H~ Engin~
Report Distribution:
(1) The Beck Group ( 1 ) Thc Beck Group
(1) Gromatzky Dupree & Assoc. (1) Dalcan, Inc.
(I) Brockette Davis Drake, Inc.
(I) Thc Beck Group
Eugene Harbour
Vice President
This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc.
0ILL Page 5 of $
IN-PLACE DENSITY ESTING
Date of Service:
Client No.:
Client:
01/19/1999
08644025
The Beck Group
Atto: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
..8901 Carpenter Frwy., Suite#100
Dallas, Texas 75247
Report No.: 9902555
Project No.: 43-2333-98
Report Date
02/08/1999
Project:
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: In-place density testing.
cotcrgACTOm BECK
PROJECT DATA
Laboratory Test Method: ASTM D-698
Field Test Method:
ASTM D-2922
ASTM D-3017
MOISTURE DENSITY RELATIONS:
MA) No.
Maximum
Description Moisture % Density pcf
Project l~equirements
Moisture Density
I See below
12.5 116.5
FIELD DENSITY TESTS
- 1/+3 % 95 %
TEST M/D MOISTURE
NO TEST LOCATION No. (%)
DRY DENSITY DENSITY
(~0 (% max)
Subgrade
339 Patio wall slab footing, west wall, N end at grade I 12.9
340 West wall, south end, at grade I 13.4
341 Generator pad, at grade I 11.8
Test results on this report meet project specification.
114.1 98
112.0 96
112.1 96
M/D No. 1 - Light brown and light gray silty sand with dark gray clay balls
Technician: Mike Odom
Report Distribution:
( I ) The Beck Group
( I ) Gromatzky Dupree & Assoc.
(I) Brockette Davis Drake, Inc.
(1) The Beck Group
(I) The Beck Group
~ Engi~~a¢~
Eugene Harbour
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
07CR Page I of I