Verizon-LR 990205CONCRETE COMPRF $$IVE STRENGTH TEST
Date of Service: 01/19/1999 Report No.: 9902556
8901 Carpenter Frwy., Suite #100
~ Texaa 75247
Report Date
02/05/1999
Client No.: 08644025 Project No.: 43-2333-98
Client: The Beck Group
Attn: Gillett Bergcr
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Project:
OTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLAIvr: 41
SPECIFICATION REQUIREMENTS
s~_~axR: 5000 psi @ 28 Days
SLU~': 6.0" Max
Aim N/A
TEST METiIOD: ASTM C- 143
ASTM C-172
ASTM C-39
SAMPLE LOCATION: A@8
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
(inches)
1 1 5.75
I 2 5.75
1 3 5.75
5.75
5.75
I 6 5.75
DATE
TES'rED ~
01/21/1999
PROJECT DATA
coNca~r~ CLASS: 8208
PLACEMENT DATE: 01/19/1999 BATCH TIME: h53pm
TIME SAMPLED: 2:30pm BY: Mike Odom
WF, A'rHI~R CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 643
Am con'r~t, rr (~): N/A
PLACEMEHT LOCATION:
Partly cloudy
71 F CONCRete: 75 F
TICKgT NO: 1219169
tn~IT WEIGHT (~f)~ N/A
Level IV building columns (16) A & B-8, K, J, L, M, N, P @ 9.3, K, J, L, M, N, P ~ 9.7, L,
K~9
REPORT OF TESTS ACCUMULATIVE YARDS: 35
MAX~IUM COMPRESSIVE
AGE LOAD STRENGTIt FRACTURE
(days) (lbs. force) (psi) TYPE
2 129460 4580
01/26/1999
01/26/1999
02/16/1999
02/16/1999
03/16/1999
7 143770 5080
7 153780 .5440
Average 5260
28
28
56
Technician: Mike Odom
Report Distribution:
(I) The Beck Group
(I) Gromatzky Dupree & Assoc.
(I) Brocketle Davis Drake, Inc.
(I) Th~ Beck Group
Started: h30pm
(1) The Beck Group
(1) Dalcan, Inc.
Finished: 5:00pm
E~gg~ne Harbour
Vice President
This report is exclusively for the usc of thc client indicat,.'d above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc.
0ILL Page l of I
CONCRETE COMPRE IVE STRENGTH TES?
Date of SerVice: 01/2511999 Report No.:
Client No.: 08644025 Project No.:
9903049
43-2333-98
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
02/05/1999
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
cot, rraamm BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMFaNTS
sTIumoTH: 5000 psi @ 28 Days
SLtma': 6.0" Max
Am: N/A
Tg.vr M~IOD: ASTM C- 143
ASTM C-172
ASTM C-39
SAMPLE LOCATION: A @ 5
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
(inches)
1 1 6.00
I 2 6.00
1 3 6.00
1 4 6.00
6.00
Technician: Mike Odom
Report Distribution:
(1) The Beck Group
(1) Gromatzky Dupree & Assoc.
(I) Brockette Davis Drake, Inc.
(I) The Beck Group
PROJECT DATA
CONCg_gTg CLASS: 8208
PLACEMENT DATE: 01/25/1999 BATCH TIME: l:30pm
~SAMPLED: 2:05pm By: Mike Odom
WEATHER CONDITIONS: Partly cloudy
TF.M~ERATURE (F). AIR 68 F CONCRETE: 70 F
TaUCKNO: 715 TICKET NO: 1224264
Am COSTgST (%): N/A uNrr WEIGItT (pc0: N/A
PLACEMENT LOCATION:
L~vei V roof columns (20) A,B,C, D Lines 1-5
REPORT OF TESTS
DATE
TESTED
02/01/1999
02/01/1999
02/22/1999
02/22/1999
AGE
(days)
28
28
MAX~IUM
LOAD
(lbs. force)
106700
116180
Average
ACCUMULATIVE YARDS: 47
COMPRF_3SIVE
STRENGTH
(psi)
3770
4110
3940
FRACTURE
TYPE
03/22/1999
56
Started: l:30pm
(I) The Beck Group
(I) Dalcan, Inc.
Finished: 4:30pm
I"]~_~~n g, Inc.
Eugene Harbour
Vice President
0ILL
This report is exclusively for the usc of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page I of I
CONCRETE COMPRESSIVE STRENGTH TEST
Date of Service: 01/22/1999
Client No.: 08644025
Client: The Beck Group
Attn: Gillctt Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Report No.: 9902865
Project No.: 43-2333-98
8901 Carpente~ Frwy., Suite #100
Dallas, Texas 75247
Report Date
02/0511999
Project:
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
COm~O, CTOa: BECK CONCR~rE c~ss: 8208
CONCRETE SUPPLIER: TXI PLACEMENT OATE: 01/22/1999 BATCH TIME: 3:17am
PLANT: 41 TIMESAMPLEO: 3:41am BY: Darrin Phillips
SPECIFICATION REQUIREMEHTS WEATHERCOt~rOmONS: Early morning, clear
sTI,y.~TII: 5000 psi @ 28 Days x~rr-r, nxuRE (F) - AIR (:~ r CONCRETE: 70 r
SLt~P: 6.0" Max ?aU¢~NO: 471 TIC~ET NO: 1222033
AIR: 3-6% AIR Co,trENT (%): N/A O~T WEIGHT (pc0t N/A
TE,vr METnOO: ASTM C- 143 PLACEMENT LOCATION:
Elevated slab $~h floor, from A to DI I to 6 Line
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: A/I.S
REPORT OF TESTS ACCUMULATIVE YAm)S: 40
CYLINDER MF. ASURED MAXRVIUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 I 5.75 01/23/1999 1 75680 2680
I 2 5.75 01/2511999 3 100260 3550
I 3 5.75 01/29/1999 7 153420 5430
! 4 5.75 01/29/1999 7 152840 5410
Average 5420
I 5 5.75 02/19/1999 28
I 6 5.75 02/19/1999 28
This report is exclusively for thc use of thc client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc.
0ILL Page 1 of 10
?
R~ el~.rt,No.: 9902865
CYLINDER ME~URED
IVIA~ SLI~¥1P DATE AGE
SET NO. ('roches) TESTED (days)
1 7 5.75 03/19/1999 56
MAXIMUM COMPRESSIVE
LOAD STRF~. GTH FRACTURE
(lbs. force) (psi) TYPE
This report is exclusively for thc use of thc client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, inc.
0ILL Page 2 of 10
CONCRETE COMPRESSIVE STRENGTH TEST
Date of Service: Report No.:
Client No.: Project No.:
Client: Project:
01/22/1999
08644025
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
8~01 Carpenter Frwy., Suite #100
Dallas, Texas 75247
9902865 Report Date
02/05/1999
43-2333-98
GTE Shared Services
Coppeil Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
cot, rrRACXOR: BECK -
CONCRETE SUPPLIER: TXI
PLA~Cr: 41
SPECIFICATION REQUIREMKN'I~
sxn~G~: 5000 psi @ 28 Days
SLUMP: 6.0" Max
AXR: 3-6%
TEST METIIOD: ASTM C- 143
ASTM C-172
ASTM C-39
SAMPLE LOCATION: BI3
PROJECT DATA
CONCRE'rE CLASS: 8208
PLACEblENT DATE: 01/22/1999 BATCll TIME: 4:32am
TIM~SAMPLED: 5:00am BY: Darrin Phillips
WEATHER CONDITIONS: Early morning, clear
TEMPERATURE (F). AIR 63 g coNcRE'r~: 72 F
TRUCKNO: 7! 1 TICKET NO: 1222100
Am COt~'ENT (%): N/A UNIT WEIalrr (p~0= N/A
PLACEMENT LOCATION:
Sec page 1
REPORT OF TESTS ACCt , LATIVE YA . S:
COMP S,V
~D SL~P DATE AGE LOAD ST~G~i
S~ NO. (~h~) T~ED (days) (1~ fo~) (~i)
2 I 6.~ 01~3/1999 I 1~ 1~ 3540
140
FRACTURE
TYPE
2 2 6.00 01/25/1999 3 112360 3970
2 3 6.00 01/29/1999 7 155370 5490
2 4 6.00 01/29/1999 7 151670 5360
Average 5430
2 5 6.00 02/19/1999 28
2 6 6.00 02/19/1999 28
0ILL
This repent is exclusively for the use of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 3 of 10
Relx~,rt No.: 9902865
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
2 7 6.00 0311911999 56
(~i)
This report is exclusively for the usc of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
OILL Page 4 of 10
CONCRETE COMPRESSIVE STRENGTH TEST
Date of Service: 01/22/1999 Report No.:
Client No.: 08644025 Project No.:
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800 -,
Dallas TX 75201-4619
8901 Carpenter Frwy., SuRe #100
Dallas, Texas 7~247
9902865 Report Date
02/05/1999
43-2333-98
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
COr~.~,CTOR: BECK
CONCRETE SUPPLIER: TXI
et. Ar~r: 41
SrEClrlCATION REQUiaWME~rS
STRE~OTH: 5~ psi ~ 28 Days
sc~: 6.0" Max
Am: 3-6%
T~ M~Om ASTM C- 143
ASTM C- 172
AS~ C-39
SAMPLE LOCATION: BI5
PRO ECT DATA
CONCRET~ Ct,ASS: 8208 .
PLACEMENT DATE: 01/22/1999 BATCIt TIME: 5:42am
TIME SAMPLED: 6:32am nY: Darrin Phillips
WEATI~R CONDITIONS:
TEMPERATURE (Ir). AIR
TRUCK NO: 836
An{ co~TE~rr (%): N/A
PLACEMENT LOCATION:
See page I
Clear, cool
59 r CONCRETe: 66 r
TICKET NO: 1222181
UNrr WEIGHT (pc0: N/A
REPORT OF TESTS ACCUMULATIVE YARDS: 240
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
3 I 7.00 01/23/1999 I 98940 3500
3 2 7.00 01/25/1999 3 100290 3550
3 3 7.00 01/29/1999 7 128290 4540
3 4 7.00 01/29/1999 7 124110 4390
Average 4470
3 5 7.00 02/19/1999 28
3 6 7.00 02/1911999 28
0ILL
This report is exclusively for thc use of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 5 of 10
Report No.: 990286S H~
CYLil~ER l~4F~ ~~ CO~~
~ SL~ DA~ AGE LOAD S~G~ ~~
S~ NO. (~) ~D (days) (1~ f~ce) (~) ~PE
3 7 7.00 03/19/1999 56
OILL
This report is exclusively for the use oflhe client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc.
Page 6 of 10
CONCRETE COMPRESSIVE STRENGTH TEST
I I
Date of Service: 01/22/1999 Report No.:
Client No.: 08644025 Project No.:
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
9902865 Report Date
02/0511999
43-2333-98
GTE Shared Services
COppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
cotcranc'roR: BECK
CONCit_k'3~ SUPPLIER: TXI
PLANT: 41
SPECIfiCATION REQUIREMENTS
sx~G~I.. 5000 psi @ 28 Days
SLUMP: 6.0" Max
AIR: 3-6%
TEST MmniOD: ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: C/2
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
(inches)
4 I 6.25
4 2 6.25
4 3 6.25
4 4 6.25
4 5 6.25
4 6 6.25
DATE
TESTED
01/23/1999
01/25/1999
01/29/1999
01/29/1999
02/19/1999
02/19/1999
PROJECT DATA
cot~cRE~z crass: 8208
PLACF, ME2~rF DATE: 01/22/1999 BATCH TIME: 6:30am
~ SAM~LVO: 7:15am BY: Darrin Phillips
WEATFI~R CONDITIONS:
TEMPERATURE (F). AIR
TRUCK NO: 716
Am COnTEnT (%): N/A
PLACEMEnT LOCATION:
Sce page I
Clear, cool
59 v CONCRETg: 67 F
TiCK.mo: 1222281
L~trrwEIGRT(~O~ N/A
REPORT OF TESTS
MAXI31UM
AGE LOAD
(days) (lbs. force)
I 69460
ACCUMULATIVE YARDS: 340
COMPRESSIVE
STRENGTH FRACTURE
(psi) TYPE
2460
3 78350 2770
7 117890 4170
7 120840 4270
Average 4220
28
28
0ILL
This repo~ is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 7 of 10
Report No.: 9902865
CYLINDER MEASURED
MARKED, , SLUMP DATE AGE
SET NO. (inches) TESTED
4 7 6.25 03/19/1999 56
MAXIMUM COMPRESSIVE
LOAD STREW. GTH FRACTURE
Obs. force) (psi) TYPE
OILL
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc.
Page 8 of 10
. ·
CONCRETE COMPRESSIVE STRENGTH TEST
Date of Service: 01/22/1999 Report No.: 9902865
Client No.: 08644025 Project No.: 43-2333-98
8901 Carpenter Frwy., Suite #I00
Dallas, Texas 75247
Report Date
02/05/1999
Client:
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CO~Ta~croa: BECK CONCaETE CLASS: 8208
CONCR~'r~stn'~wa: TXI PLACEMENT DATE: 01/22/1999 BATCHTIME: 7:36am
PLAt~rr: 41 TIME SAMPLED: 8:40am BY: Dan'in Phillips
SPEC~ICATION REQU~t~'TS W~T~aCONDmONS: Cloudy, cool
STREnGTh: 5000 psi @ 28 Days 'r~am'ElmTU~.~(~. AIR 56 g CONCaET~: 63 F
SLUM~: 6.0" Max ~uc~:~o: 837 TICKETNO: 1222438
Am: 3-6% AIR cot~rE~,rr ¢~): N/A uNrr w~ia~rr (pc0.; N/A
TEST M~rHOD: ASTM C- 143 PLACEMENT LOCATION:
See page i
^$TM C- 172
SAMPLE LOCATION: A/6
REPORT OF TESTS ACCVm~VE YARDS: 440
CYLINDER MEASURED MAXI~IUM COMPRESSIV~
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
5 I 5.50 01/23/1999 I 95440 3370
5 2 5.50 01/25/1999 3 107130 3790
5 3 5.50 01/29/1999 7 126410 4470
5 4 5.50 01/29/1999 7 128730 4550
Average 4510
5 5 5.50 02/1911999 28
5 6 5.50 02/19/1999 28
0ILL
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc.
Page 9 of 10
5 7 5.50
DATE
TESTED
03/19/1999
,AGK
(da~)
56
(!~)
Technician: Dan'in Phillips
Report Distribution:
(i) Thc B~ck Group
( 1 ) Gromatzky Dupree ,t, Assoc.
(1) Brockettc Davis D~ke, lac.
(I) The Beck Group
Started: 2:3Oam
(1) The Beck Group
(1) Dalcan, Inc.
Finished: lO:30am
~'uge~Harbour
Vice President
OILL
This repo~ is exclusively for the use of the client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc.
Page 10 of 10
CONCRETE COMP SIVE STRENGTH TE
Date of Service: 01/18/1999
Client No.: 08644025
Client: The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Report No.: 9902392
Project No.: 43-2333-98
Project: GTE Shared Services
.8901 Carpenter Frwy., Suite,9100
Dallas, Texas 75247
I
Report Date
02/05/1999
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at thc placement locations, perform required field test and cast
compressive strength samples.
coNT~croa: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
S~CnnCA~ON ~uIREM.vavrs
~~: 5~ psi ~ 28 Days
SL~P: 6.0" M~
n~ N/A
T~ M~OD: AS~ C-143
ASTM C-172
ASTM C-39
SAMPLE LOCATION:
C.5@6
PROJECT DATA
CONC~T~ CLASS: 154 .
PLACWMgNT DA'I~: 01/18/1999 BATCH T~Mw: 2:59am
TIMES AMPLED: 3:30am BY: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 715
Am CONTENT ('~): 1.7
PLACEMENT LOCATION:
Fair
41 ~' CONCP~rv.: 62 F
TICKET NO: 1216779
UNIT WEIGtIT (pef).: N/A
Level IV building slab Area B, 5.7-13 Lines
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
I I 5.50 01/20/1999 2 117510
ACCUMULATIVE YARDS: 540
COMPRESSIVE
STRENGTH FRACTURE
(psi) TYPE
4160
I 2 5.50 01/21/1999 3 135720 4800
1 3 5.50 01/25/1999 7 163380 5780
1 4 5.50 01/25/1999 7 169330 5990
Average 5890
I 5 5.50 02/15/1999 28
I 6 5.50 02/15/1999 28
0iLL
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 1 of 10
Report No.: 9902392 ~.--.x.~
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTtl FRACTURE
SET NO. (incl.) TESTED (days) (lbs. force) (psi) TYPE
I 7 5.50 03/15/1999 56
0ILL
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 2 of 10
CONCRETE COMP IVE STRENGTH TEST
Date of Service: 01/18/1999 Report No.:
Client No.: 08644025 Project No.:
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
9902392 Report Date
02/05/1999
43-2333-98
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
COt~"nO, CXOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECWlCATION REQUIRgMFAVI'S
S~,gNO~q~: 5~ psi ~ 28 Days
SL~: 6.0" M~
~m: N/A
~ ~oo: ASTM C-14~
ASTM C- 172
ASTM C-~9
SAMPLE LOCATION:
B.5 @ 6.5
PROJECT DATA
CONCR~ CLASS: 154
PLACI~IF2qT DATE: 01/18/1999 aATCH T~ME: 4: 19am
T~ZSnM~O: 4:45am aY: Mike Odom
WEATHER CONDITIONS:
TEbl~ERATUR~ (!t) - AIR
TRUCKNO: 716
Am coNTE~r (%): N/A
PLACEMENT LOCATION:
See page !
Fair
38 r coNcaz~z: 63 r
TICKET NO: 1216814
UNIT W~IG~T (p~.: N/A
REPORT OF TESTS
CYLINDER MEASURED MAXLMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inch~s) TESTED (days) (lbs. force)
2 I 5.50 01/20/1999 2 121610
ACCUMULATIVE YARDS: 540
COMPRESSIVE
STRENGTH FRACTURE
(psi) TYPE
4300
2 2 5.50 01/21/1999 3 143700 5080
2 3 5.50 01/25/1999 7 155590 5500
2 4 5.50 01/25/1999 7 158590 5610
Average 5560
2 5 5.50 02/15/1999 28
2 6 5.50 02/15/1999 28
0ILL
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 3 of 10
I
Report No.: 9902392
CYLINDER MEASURED MAX1MUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (ihs. force) (psi) TYPE
2 7 5.50 0311511999
Ten (10) ~;allons of water added.
56
0ILL
This report is exclusively for the us~ of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, lac.
Page 4 of 10
CONCRETE COMPRESSIVE ST NGTH TEST
II I I
Date of Service: 01/18/1999
Client No.: 08644025
Client: The Beck Group
Atto: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report No.: 9902392 Report Date
02/05/1999
Project No.: 43-2333-98
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONT~OR: BECK
CONCRL~r~ SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
STg~OT~: 5000 psi @ 28 Days
SLUMP: 6.0" Max
Am: N/A
TEST METtlOD: ASTM C- 143
ASTM C-172
ASTM C-39
SAMPLE LOCATION:
M,5 @ 9.3
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
(inches)
3 I 5.75
3 2 5.75
3 3 5.75
3 4 5.75
3 5 5.75
3 6 5.75
DATE
TESTED
01/20/1999
PROJECT DATA
CONCRET~ CLASS: 154
~'t.~C~ENT DAT~: 01/18/1999 BATCH TIME: 5:31am
TIME SAMPLED: 6:00am EY: Mike Odom
WEATHER CONDITIONS:
TI~VIPERATURE (F) - AIR
TRUCK NO: 451
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
~ page I
REPORT OF TESTS
AGE LOAD
(days) (ibs.~rc~
2 119380
01/21/1999
01/25/1999
01/25/I999
Fair
41 F CONCRE'r~: 59 F
Ticg~-'r ~o: 1216878
UNIT WEIGIIT (l~'):. N/A
02/15/1999
02/15/1999
ACCUMULATIVE YARDS: 540
COMPRESSIVE
STRENGTI! FRACTURE
(psi) TYPE
4220
3 137730 4870
7 167940 5940
7 178940 6330
Average 6140
28
28
OILL
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 5 of 10
Report No.: 9902392
CYLil~ER MF. ASURF~ MAXIMUM CO~~
~ SL~P DA~ AGE ~AD S~G~ F~~
S~ NO. (~h~) ~D (~) (1~ force) ~) ~PE
3 7 5.75 03/15/1999 56
0ILL
This report is exclusively for the use of the client indicated above and shall not lac reproduced except in full without the written approval of HBC Engineering, Inc.
Page 6 of 10
CONCRETE COMPRESSIVE STRENGTH TEST
Date of Service:
Client No.:
Client:
01/18/1999
Report No.: 9902392
08644025
The Beck Group
ACm: Oilier Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
02/05/1999
Project No.: 43-2333-98
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CO~'T~CTOR: BECK
CONCRETE SUPPLIER: TXI
PLATO': 41
SPECIFICATION REQUIREMENTS
S~aTm 5000 psi @ 28 Days
SLUMP: 6.0" Max
AIR: N/A
TF, ST METItOD: ASTM C-143
ASTM C-172
ASTM C-39
SAMPLE LOCATION:
G.5 @ 10
PROJECT DATA
CONC~TE CLASS: 154.
PLAC~Vr DA'r~: 01/18/1999 BATC~ TreE: 6:41am
TllVmSAMPLgD: 7:05am BY: Mike Odom
WEATI~R CONDITIONS:
TEMPERATURE (F) - AIR
T~UCKNO: 803
Am CONTENT (~): N/A
PLACEMENT LOCATION:
See page I
Fair
39~ F coNcRETE: 61 F
TICKgT NO: 1216946
tmrr w~olrr (pc0; N/A
REPORT OF TESTS
CYLINDER MEASURED MAXIML~
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TF.~TED (days) (lbs. force)
4 I 6.00 01/20/1999 2 122120
ACCUMULATIVE YARDS: 540
COMPRESSIVE
STRENGTH FRACTURE
(psi) TYPE
4320
4 2 6.00 01/21/1999 3 130050 4600
4 3 6.00 01/25/1999 7 170860 6040
4 4 6.00 01/25/1999 7 184000 6510
Average 6280
4 5 6.00 02/15/1999 28
4 6 6.00 02/15/1999 28
0ILL
This repo~ is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 7 of 10
ge rt
CYLINDER ~S~D ~~ COMP~
~ SL~ DATE AGE ~AD S~G~
S~ NO. (~) T~D (~) (!~ force) (~0 ~PE
4 7 6.00 03/15/1999 56
NO water added.
OILL
This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 8 of 10
( ONCRETE COMPRE SI STRENGTH TEST
Date of Service:
Client No.:
01/18/1999
08644025
Report No.:
Project No.:
9902392
43-2333-98
$901 Carpenter Frwy., Suite #100
D~llm"; T~'m~ 75247
Report Date
02/0511999
Client: The Beck Group Project:
Attn: Oillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
Co~'r~OR: BECK
CONCRETE SUPPLIER: TXI
PL~t~rr: 41
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Fair
ST~a~: 5000 psi @ 28 Days TEMPERATURE (F) . AIR 41 F CONCRErrv.: 61 F
SLtnVn': 6.0" Max TaOC~:NO: 802 TICKETNO: 1217130
AIR: N/A Am cot~rr~Ivr (~): N/A t0t~r w~i(~wr (p~0:. N/A
T~T M~"mOO: ASTM C- 143 PL~Cg.M~rr LOCATION:
ASTM C-172 s~e pa~ t
ASTM C-39
SAMPLE LOCATION: E.5 @ 12
PROJECT DATA
CONCRE'r~ CLASS: 154
PLACEIVIENT DATE: 01/18/1999 BATCH TflX: 8:09am
T~S,~n~ZD: 8:35am BY: Mike Odom
REPORT OF TESTS Acctnvro~r~vz YARDS: 540
c~R Musu~s~ MSXr~ coMP~s~sslw.
MARKED SLUMP DATE AGE LOAD STRENGTI! FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
5 1 5.75 01/20/1999 2 118610 4190
5 2 5.75 01/2111999 3 137060 4850
5 3 5.75 01/2511999 7 158430 5600
5 4 5.75 01/25/1999 7 161470 5710
Average 5660
5 5 5.75 02/15/1999 28
5 6 5.75 02/15/1999 28
0ILL
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without Ibc written approval of HBC Engineering, Inc.
Page 9 of 10
,l~el~,rt No.:
SET NO.
5 7
Ten (10)
9902392
WIEASURED
SL~ DATE
(inches) TESTED
5.75 03/15/1999
gallons of water 'added.
AGE
(days)
56
MAXIMUM
LOAD
(lbs. force)
COMPRESSIVE
STRENGTH FRACTURE
(p~) TYPE
Technician: Mike Odom
Report Distribution:
(i) The Beck Group
(1) Gromntzky Dupree & Assoc.
(!) Brockette Davis Drake, Inc.
(I) The Beck Group
Started: 2:00am
(1) The Beck Group
(1) Dalcan, Inc.
Finished: 10:00am
Eugene Harbour
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
01LL Page I0 of 10