Verizon-LR 990203CONCRF. TE COMPRESSIVE STRENGTH TEST
Date of Service: 12/0811998
Client No.: 086440~
Client: The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
8901 Carpe~er Frwy., Suite #100
Dallas, Texas 75247
Report No.: 9833081
Project No.: 43-2333-98
Report Date
02/0311999
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
co~r~'~C'TOR: BECK
CONCRg'rg SU~PLmm TXI
PLANT: 41
SPECnqCATION ~QU~
STgY. NOTa: 4000 psi @ 28 Days
SLOM~: 6.0" Max
AIR: 3-5%
~ MgTItOD: ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION:
See below
PROJECT DATA
CONCP. ZTg CLASS: 8205
PLACEMENT DATE: 12/08/1998 BATCH Tam: 5:06am
TIMgSAMPLED: 5:45am BY: Mike Odom
WEATItgR CoN~moNs:
TgMI~atATURg (F) - AIR
T~UCKNO: 450
AIR CONTENT (%): 6.8
PLACEMENT LOCATION:
Cloudy
42 F CONCRgTg: 67
TICKET NO: 1195035
uNrr wzloax (pc0: N/A
Paving slab-on-grade #2, west side of quadrant
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (Inches) TF,$TED (days) Obs. force)
I 1 4.25 12/15/1998 7 93460
1 2 4.25 12/15/1998 7 94090
Average
I 3 4.25 01/05/1999 28 117820
1 4 4.25 01/05/1999 28 106860
Average
1 5 4.25 02/02/1999 56 151790
ACCUMULATIVEYARDS: 550
COM~RESSIVg
STRgNGTH
Cpsl)
3300
3330
3320
4170
3780
3980
5370
FRACTURE
TYPE
Sample location: 50' N & 20' E from NW corner paving placement #2.
0ILL
This repotx is exclusively for the usc of the client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc.
Page 1 of 5
CONCRETE COMPRESSIVE ST NGTH TEST
Date of Service: 12/08/1998
Client No.: 08644025
Report No.: 9833081
Project No,: 43-2333-98
~901 Carpenter grwy., Sult~ #100
D~m, Tex~ 7S247
Report Date
02/03/1999
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
cowmncrom BECK CONCa~r~ c~_ss: 8205
CONCRETE SUPPLi~R: TXI P~C~ On~: 1~08/1998 BATCH X~: 6:18am
P~: 41 ~S~LED: 7:~ BY: Mike ~om
S~Cm~ON ~U~~ ~RCO~mONS: Pa~y cloudy
~~: ~ psi ~ 28 Days ~~~(~.nm 43 g co~c~: 67 ~
SL~: 6.0" Max xguc~o: 466 ~c~ ~o: 1195083
~m 3-5% ~m co~ (%): 6.6 u~ ~Ia~ (~ N/A
~ ~oo: AS~ C- 143 v~c~ ~cATio~:
Sce page 1
ASTM C- 172
ASTM C-39
See below
SAMPLE LOCATION:
REPORT OF TESTS ACCUVan,ATIVE YARDS: 550
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inch~s) TESTED (days) (lbs. force) (psi) TYPE
2 1 5.50 12/15/1998 7 86470 3060
2 2 5.50 12/15/1998 7 87100 3080
Average 3070
2 3 5.50 01/05/1999 28 121370 4290
2 4 5.50 01/05/1999 28 116490 4120
Average 4210
2 5 5.50 02/02/1999 56 130~30 4610
Sample location: NW driveway, 80' E from NW corner paving placement #1.
0ILL
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 2 of 5
CONCRETE COMPRESSIVE STRENGTH TEST
Date of Service: 12/08/1998
Client No.: 08644025
Report No.: 9833081
Project No.: 43-2333-98
S901 Catl~nttr 1~'~. Suite #100
Dallas, Texas 75247
Report Date
02/03/1999
Client:
The Beck Group
Attn: Oillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
COt~'TRnCTOR: BECK
CONCRETE SUPPLIER: TXI
PLA~: 41
SPZCn~CATION ltEOUm~MEt~rs
s~o~: ~ psi ~ 28 Days
sc~: 6.0" M~
· m: 3-5%
~ ~o~: ASTM C- 143
ASTM C-172
ASTM C-39
SAMPLE LOCATION:
PROJECT DATA
coNcaET~ crass: 8205
PLACEMENT DATE: 12/08/1998 BATCH T~m: 7:57am
TIME SAMPLED: 8:50am BY: Mike Odom
w~Tmmcon~mo~: Partly cloudy
TEM~'~.RnT~Jm~. fi). am 43 r CONCh: 71 F
TaVCK~O: 463 ~C~NO: 1195207
Am co~ (~): 6.7 ~ ~ (~ N/A
P~C~ ~CA~ON:
See ~ge I
REPORT OF TESTS ACCUm Tiv YARDS:
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH
SET NO. (inches) TESTED (days) (ll~. force) (psi)
3 1 6.00 12/15/1998 7 83310 2950
3 2 6.00 12/15/1998 7 82140 2900
Average 2930
3 3 6.00 01/05/1999 28 116620 4120
3 4 6.00 01/05/1999 28 109680 3880
Average 4000
3 5 6.00 02/02/1999 56 128220 4530
Sample location: Along Building Line 7, 175' W from centerline W fire lane.
0ILL
This repo~ is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 3 of 5
CONCRETE COMPRESSIVE STRENGTH TEST'
Date of Service: 12/08/1998 Report No.:
Client No.: 08644025 Project No.:
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
8901 Carpeat~r Fr~., Suit~ #100
Dallas, Texas 75247
9833081 Report Date
02/03/1999
43-2333-98
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
co~rr~,croa: BECK
CONCRETE SUPPLIER: TXI
rLA~T: 41
Sr~CU~CA~O~ ~.Qomm~wrs
STR~OTH: 4000 psi @ 28 Days
SLVM~: 6.0" Max
Am: 3-5%
~ Mg'mOO: ASTM C- 143
ASTM C-172
ASTM C-39
SAMPLE LOCATION:
See below
PROJECT DATA
CONC~"r~ CLASS: 8205
PLACEMI2qT DATE: 12/08/1998 BATCH TM: 8:59am
TIME SAMPLED: 9:50am BY: Mike Odom
WKATI~R CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 454
Am CO~T~rr ¢~): 6.4
PLACEMENT LOCATION:
See page 1
Fair
47 r CONCRETg: 71 r
TIcker No: 1195296
um'r w~o~-rr (po'): N/A
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inch.)
4 I 6.50
4 2 6.50
4 3 6.50
4 4 6.50
4 5 6.50
SamDie location: Along
REPORT OF TESTS ACCUMt TIW VAt. DS:
MAXIMUM COMPRESSIVE
DATE AGE LOAD STRENGTH
TESTED (days) (lb~. fore) (psi)
12/15/1998 7 70470 2490
12/15/1998 7 70150 2480
Average 2490
01/05/1999 28 100180 3540
01/05/1999 28 91290 3230
Average 3390
02/02/1999 56 134790 4770
Building Line 6, 120' W from centerline W fire lane.
550
0ILL
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 4 of 5
CONCRETE COMPRESSIVE STRENGTH TEST
Date of Service: 12/08/1998 Report No.:
Client No.: 08644025 Project No.:
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
8901 Carpen~ Frwy., Suite #100
Dallu, Tm-~ 75247
9833081
43-2333-98
RepOrt Date
02/03/1999
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CO~mACTOm BECK
CONCRETE SUP~Lmm TXI
PLATO': 41
SPECIFICATION REQUIREblEN'rs
STRENGTH:
SLUMI~:
AIR:
TEST METHOD:
SAMPLE LOCATION:
4000 psi @ 28 Days
6.0" Max
3-5%
ASTM C-143
ASTM C-172
ASTM C-39
See below
PROJECT DATA
coNcemrz c~ss: 8205
PLACZM~Vr OAT~: 12/08/1998 BATCH TIME: lO:23am
T~SAM~O: 10:50am BY: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F). AIR
TRUCKNO: 461
Am cowxxwr (~): 6.5%
PLACEMENT LOCATION:
See page I
Fair
48 F CONCRZ-~ng: 76 ~
TIcg~rNo: I195435
uivrrv,,~ioirr(~m')~ N/A
REPORT OF TESTS ACCt nna, Tivz YAm S: 630
c ro .a COMV asn
MARKED SLUMP DATE AGE LOAD STRENGTH
SET NO. (ine. h~) TI~'TED (days) (Ibm. for~e) ({~i)
5 I 6.50 12/15/1998 7 71940 2540
5 2 6.50 12/15/1998 7 73120 2590
Average 2570
5 3 6.50 01105/1999 28 116300 4110
5 4 6.50 01/05/1999 28 113080 4000
Average 4060
5 5 6.50 02/02/1999 56 131000 4630
Sample location: Along Line 3, 50' W from centerline W fire lane.
ALL REPORTS CORRECTED FOR COMMENTstarted:ABOUT4:30am% AIR l~nished:- % AIRi:00pmDOES COMPLY~. ~-'"-' Engi~~
(I) The Beck Group
(l) Oa~m. inc. Harbour
Technician: Mike Odom
Report Distribution:
(I) Thc Beck Group
(!) Oroma~zky Duprce & Assoc.
(I) Brockette Davis Drake, Inc.
(I) The Beck Group
Eugene
Vice President
This repot~ is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 5 of 5
CONCRETE COMPRESSIVE STRENGTH TEST
Date of Service: 12/08/1998 Report No.:
Client No.: 08644025 Project No.:
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
.~901 Carpenter Frwy., Suite #100
~ Texas 75247
I [
9833080 Report Date
02/03/1999
43-2333-98
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
cot, mo, crom BECK
CONCRm~Z suvPLmm TXI
~'LA~: 41
S~'~Cm[CA~O~ R~QV~
s'r~ZNGTH: 5000 psi @ 28 Days
SLUM~: 6.0" Max
Am: N/A
xgsr M~mOO: ASTM C-143
ASTM C-172
ASTM C-39
PROJECT DATA
CONC~'rz CLASS: 8208
PLAczMn, rr oA'r~: 12/08/1998 aATCH TnVm: 1:28pm
Tn~ SAMI'LgD: 2:10pm aY: Mike'Odom
WF, ATI~R CONDITIONS:
TgMI'~,TUm~ fi). Am
TRUCK NO: 450
Am CON'r~'r (~): N/A
PLACEMENT LOCATION:
Fair
53 F CONCRETE: 71 ~'
TIcr~.--'r No: 1195682
u~rrr wglmrr (po'): N/A
East wing, Level 1-2 Columns ~ E-16, 17, 18 & H-16, 17,18
SAMPLE LOCATION: H@ 18
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
(ina)
1 1 5.75
1 2 5.75
1 3 5.75
1 4 5.75
I 5 5.75
No visual
AEA in mix.
Technician: Mike Odom
Report Distribution:
(1) Tbe Beck Group
(1) Gromatzky Duprec & Assoc.
(I) Brockette Davis Drake, Inc.
(1) The Beck Group
REPORT OF TESTS
DATE
TESTED
12/15/1998
12/15/1998
01/05/1999
01/05/1999
02/02/1999
Started: h00pm
(I) The Beck Group
(1) Dakan, Inc.
ACCUMULATIVE YARDS: 16.5
M.A~ COMPRESSIVE
AGE LOAD STRENGTH FRACTURE
(days) (lbs. forte) (psi) TYPE
7 146790 5190
7 146240 5170
Average 5180
28 202020 7140
28 192800 6820
Average 6980
56 235700 8340
Finished: 3:30pm
Eugene Harbour
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.