Verizon-LR 990202CONCRETE COMPRESSIVE STRENGTH TEST
Date of Service:
Client No.:
Client:
01/13/1999
08644025
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
ENG--, INC.
'~901 Carpenter Frwy., Suite #100
Dallm, Texas 75247
Report No.: 9902044
Project No.: 43-2333-98
Report Date
02/02/1999
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
com'~tcro~ BECK
CONCaa'r~ surrLnm: TXI
rL~lVr: 41
SPECIFICATION REQUIREMENTS
s'rag~aTH: 5000 psi @ 28 Days
SLUMP: 6.0" Max
Am: N/A
~ METHOD: ASTM C-143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION:
Column B @ 5
PROJECT DATA
CONCRETE CLASS: 154
PLACEMEHT DATE: 01/13/1999 BATCH TIME: 12:27pm
TIME SAMPLED." 1:00pm BY: Mik~ Odom
WEATHER CONDITIONS:
TEMPERATURE ~ - AIR
TRUCK NO: 474
Am CONTgNT ('~): N/A
PLAC~N"r LOCATION:
Cloudy
44 F CONCR~: 58 F
TtCr~--r NO: 1214143
UNIT WEIGHT (p~: N/A
Level IV columns (20) Lines i-5 & A-D, west wing
CYLINDER MEASURED
MARKED SLUMP
SgT NO. (inches)
1 1 6.00
REPORT OF TESTS
DATE AGE LOAD
TESTED (days) (lbs. for~e)
01/14/1999 1 12400
ACCUlVlULA~E YARDS: 45
COMPRESSIVE
STRENGTH FRACTURE
(!~1) TYPE
440
I 2 6.00
01/15/1999 2 59640 2110
I 3 6.00
I 4 6.00
I 5 6.00
I 6 6.00
01/2011999 7 123460
01/20/1999 7 119710
Average
02/10/1999 28
02/10/1999 28
4370
422
4300
0ILL
This report is exclusively for thc use of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Enginccring, Inc.
Page 1 of 2
Repgrt No.: 9902044
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
I 7 6.00 03/10/1999
Note: Columns placed by mud bucket.
AGE
56
MAXIMUM
LOAD
(lbs. force)
STa~.. GTH
Technician: Mike Odom
Report Distribution:
(I) The Beck Group
(I) Gromatzky Dupree & Assoc.
(I) Brockette Davis Drake, Inc.
(1) The Beck Group
Started: 9:30am
(1) The Beck Group
(I) Datcan, Inc.
Finished: 4:30pm
~ Engin~~, Inc.
Eugene HarboUr
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without thc writ~n approval of HBC Engineering, Inc.
0ILL Page 2 of 2
·
CONCRETE COMPRESSIVE STRENGTH TEST
Date of Service: 12/31/1998
Client No.: 08644025
Client:
The Beck Group
Arm: Oilier Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
.8901 Carpenter Fi'wy., Suite #100
Dallas, Texas 75247
Report No.: 9834157 Report Date
02/02/1999
Project No.: 43-2333-98
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
cotvrancxom BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
S~U~NGTH: 4000 psi @ 28 Days
SLUMP: 6.0" Max
AIa: 3-6%
Tb_,ST METtlOO: ASTM C- 143
ASTM C-172
ASTM C-39
PROJECT DATA
CONCm~'r~ c~ss: 8205
PLACEMENT DATE: 12f31/1998 BATCH T~: 4:08pm
T~Vm SAMIn.,EO: 4:45pm BY: Mik~ Odom
w~ CONOmONS:
TEMPERATURE Or). AIR
TRUC~NO: 834
Am CONTRNT (%): 6.0
PLACEbl~qT LOCATION:
Fair
37 r CONCh: 61 r
TIC~T NO: 1205300
u~r w~la~rr (~: N/A
South I/2 bay 4 & 5 paving quadrant, slab-on-grad~ of main entrance (Left) drive near Bay
I & Bay 3
SAMPLE LOCATION: Bay 5 centerline between islands
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
I I 5.75 01/07/1999
I 2 5.75 01/07/1999
I 3 5.75 01/28/1999
1 4 5.75 01/28/1999
REPORT OF TESTS ACC E YARDS: 530
MAXIMUM COMPRESSIVE
AGE LOAD STRENGTH
(day~) (11~ force) (p~t)
7 72340 2560
7 75080 2650
Average 2610
28 131940 4670
28 135770 4800
Average 4740
1 5 5.75 02/2511999 56
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 1 of 5
·
CONCRETE COMPRESSIVE STRENGTH TEST
Date of Service: 12/31/1998 Report No.:
Client No.: 08644025 Project No.:
Cfient: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
8901 Carpenter Frwy., Suite #100
Dallal, Texas 75247
9834157 Report Date
02/02/1999
43-2333-98
GTE Shared Service~
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
cotcr~oR: BECK CONCn~r~ crass: 8205
CONCREI~ SUPPLIER: TXI PLACEbfl~IT DATE: 1~ 1/1998 BATCH T~: 5:32am
P~: 41 ~ SA~: 5:55am BY: ~k~ Odom
SPEC~iCA~ON ~UI~ ~~ commons: Fa~
~~: 4~ psi ~ 28 Days ~~ ~-nm 36 F CONCh: 62 F
SL~: 6.0" M~ ~UCK~O: 837 T~C~NO: 1205384
Am: 3-6% Am CO~ (~): 4.6 U~ ~m~ (~ N/A
~ ~oo: AS~ C- 143 P~c~
S~ ~ 1
ASTM C-172
ASTM C-39
See below
SAMPLE LOCATION:
REPORT OF TESTS ACCt 'L XrV ','AVa,S: 530
CYLINDER MEASURED MAXIMUM COMPRK.~IVE
MARKED SLUMP DATE AGE LOAD STRENGTH
SET NO. (inches) TESTED (days) (lbs. force) (psi)
2 1 6.25 01/07/1999 7 76620 2710
2 2 6.25 01/07/1999 7 82720 2930
Average 2820
2 3 6.25 01/28/1999 28 135410 4790
2 4 6.25 01/2811999 28 140910 4980
Average 4890
2 5 6.25 02/25/1999 56
Sample location: Bay 4, 20' south at centerline from bay 4 islands.
0ILL
This repo~ is exclusively for ~e use of the client indicated above and shall not be reproduced except in full without ~he written approval of HBC Engineering, Inc.
Page 2 of 5
CONCRF TE COMPRESSIVE STRF. NGTH TEST
· 8901 Carpenter Frwy., Suite #100
Dall~, Tex~ 75247
Date of Service: 12/31/1998
Client No.: 08644025-
Report No.: 9834157 Report Date
02/02/1999
Project No.: 43-2333-98
Client: The Beck Group
Attn: Oillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Project:
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
corm~CTOm 'BECK
CONCRgTg SUPPLlgR: TXI
PLANT: 41
SPECIFICATIONREQUIREMEbF~ WEATHERCO~mONS: Fair
STgg~aTa: 4000 psi @ 28 Days TEM~a~TUgZ O3-Am 36 r CONCRZTE: 60 F
SLUMP: 6.0" Max TgUCKNO: 807 TICr~."TNO: 1205466
An~ 3-6% Am cosTE~rr (~): 4.9 U~aT WglaaT (p~: N/A
TEST MgT~OO: A STM C- 143 PLAc~wr COCA
ASTM C- 172 see page i
ASTM C-39
PROJECT DATA
CONCr~.'Tr- CLASS: 8205
PLACEMENT DATE: 12/31/1998 BATCH T~: 6:3 lam
~stg SS~PLgm 7:10am BY: Mike (Mom
SAMPLE LOCATION: See below
REPORT OF TESTS Accum~.~rw. YA~OS: 530
c~zR M~D ~ co~~
~D SL~ DA~ AGE LO~ S~G~
S~ NO. (~) ~ (da~) O~ f~) (~i)
3 I 6.~ 01/07/19~ 7 685~ 2430
3 2 6.~ 01~7/19~ 7 7~10 2710
Avenge ~70
3 3 6.~ 01~1~9 28 131730 ~
3 4 6.~ 01~8/1999 28 1~740 5120
Avenge ~90
3 5 6.~ 0~5/1~9 56
FRACTURE
TYPE
Sample location: Bay 5, west centerline, 30' north of (N) fire lane centerline.
OILL
This ~ is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 3 of 5
CONCRETE COMPRESSIVE STRENGTH TEST
Date of Service:
Client No.:
Client:
12/31/1998
08644025
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Report No.:
Project No.:
Project:
· .8901 Cm-l~nm- Frwy., Suite #I00
~ T~x~ 75247
9834157 Report Date
02/02/1999
43-2333-98
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
con'rgn~o~ BECK
CONCRETESUI'I'L~ER: TXI
pL~rr: 41
SPI~CWICATION REQU~
s'n~XH: 4000 psi ~ 28 Days
sc~: 6.0" Max
Am: 3~%
~ ~O~: AS~ C-143
AS~ C-172
AS~ C-39
SA~ ~A~ON: M~n en~ce (leR) ~veway
CYLINDER MEASURED
MARKED SLUMP DATE;
SET NO. (hach~s) TESTED
4 1 6.50 01/07/1999
4 2 6.50 01/07/1999
4 3 6.50 01/28/1999
4 4 6.50 01/28/1999
PROJECT DATA
coNcaETz ~: 8205
Pg~,CmaENT I~A'rz: 12/31/1998 BATCH TIME: 7:45am
T~S~: 8:45am aY: Mik~ Odom
WFATIIgR CONDmONS: Fair
TgMPERATUR~ (F). Am 43 V CONC~: 58 F
TRUCK NO: ~1 ~C~ NO: 1205588
AmCO~(~): 4.8 u~tG~: N/A
~C~ ~CA~ON:
~ page 1
REPORT OF TESTS ACCVM~_.Axr,'~ YARDS: 530
MAXIMUM COMPRESSIVE
AGE LOAD STRENGTH
(days) Obs. force) (psi)
7 79020 2790
7 74380 2630
Average 2710
28 126620 4480
28 116750 4130
Average 4310
4 5 6.50 02/25/1999 56
Note: Slum~ was Oaken ac hopper.
0ILL
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 4 of 5
CONCRETE COMPRESSIVE ST NGTH TEST
Date of Service: 12/31/1998
Client No.: 08644025
Report No.: 9834157
Project No.: 43-2333-98
· 8901 Carpmter Frwy., Suite #100
Dallas, Texas 75247
Report Date
02/02/1999
Client:
The Beck Oroup
Attn: Cdllett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Project: OTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
cot~t'an~oR: BECK
CONCR~r~ SUPPLIER: TXI
PLANT: 41
SPECIFICA'IION REQUIREblENTS
s'rn~GTIi: 4000 psi @ 28 Days
st.t~n,: 6.0" Max
n~R: 3-6%
xr~vr r, nn~OD: ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
coNcn~'r~ ct.ass: 8205
PLAClaVI~rr DAT~: 12/31/1998 BATCtt Tn~: 9:49am
TIME SAMPLED: 10:35am BY: MikeOdom
wEA~acot~mo~s: Fair
'rgM~gRA~rag (~3- Am 45 F CONCRETE: 58 v
~UCK~O: 462 TIC~: 1205854
nmco~(~): 4.5 ~tO~(~: N/A
P~C~ ~CA~ON:
~ pa~ I
SAMPLE LOCATION: See below
CYLINDER MEASURED
MARKED SLUMP
SET NO. (incheO
5 I 6.50
5 2 6.50
5 3 6.50
5 4 6.50
5 5 6.50
DATE
TEb~FED
01/0711999
01/07/1999
01/2811999
01/28/1999
REPORT OF TESTS ,ccumr xrvs
AGE LOAD STRENGTH
(days) (tbs. force) (psi)
7 81250 2870
7 87910 3110
Average 2990
28 169070 5980
28 162550 5750
Average 5870
02/2511999 56
560
Sample location:
Technician: Mike Odom
Report Dk~tribution:
(!) TI~ B~k Group
(1) Gromatzky Dupree & Assoc.
(I) Brockette Davis Drake, Inc.
(I) The Beck Group
40'(W)from (E) edge (N) driveway, centerline bay 6.
Started: 3:00am
(I) Tbe Beck Group
(!) Dalcan, Inc.
Finished: 1 h00am
H~ Engining, Inc.
Eugene Harbour
Vice President
This relXnt is exclusively for thc use of the client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc.
0ILL Page 5 of $