Loading...
Verizon-LR 990201Date of Service: 12/04/1998 Client No.: 08644025 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 8901 Carpenter Frwy., Suite #100 Dallas, Texas 7S247 Report No.: 9832771 Project No.: 43-2333-98 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Report Date 02/01/1999 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. cowr~m BECK CONC RE~'E SUPPLIER: TXI Pt, ANT: 31 SPECIFICATION REQUIREMENTS s'rav~a'm: 3000 psi @ 28 Days SLtnVIP: 6.0" Max AiR: N/A ~ MZ~OO: ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: 7.5 @ C.5 CYLINDER MEASURED MA~ SLUMP SET NO. (inches) I 1 6.25 1 2 6.25 6.25 6.25 6.25 1 3 1 4 1 5 PROJECT DATA coNc~m~ ct,,~ss: 9506 PLACEMENT DATE: 12/04/1998 BATCH :rnv~: 7:20am TIME SAMPLED: 8:30am aY: Mike'Odom WEATI-IER CONDITIONS: TEMPERATURE (F). AIR TRUCKNO: 418 Am CONTENT (%): 1.3 PLACEMENT LOCATION: Partly cloudy 72 it CONCRETE: 78 F TICKZT NO: 1194100 UNrr WEIGHT (pa).'. N/A Building slab-on-grade L~vel I, between A & D, C & D, E & H & between 1-6, 6-15. REPORT OF TESTS ACCUm-. TI YARDS: 330 MAXIMUM COMPRESSIVE DATE AGE LOAD STRENGTH TE~UED (days) (ibe. force) 12/11/1998 7 104670 3700 12/11/1998 7 106250 3760 Average 3730 01/01/1999 28 133520 4720 01/01/1999 28 126080 4460 Average 4590 01/29/1999 56 157270 5560 FRACTURE TYPE Samples obtained from hopper. OILL This relx~ is exclusively for the use of the client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc. Page I of 3 CONCRETE COMP IVE STRENGTH TEST 8~01 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 12/04/1998 Report No.: 9832771 Report Date 02/01/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: Arm: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and' cast compressive strength samples. CO~P. aCTO~: BECK CONCRETE SUPPLIER: TXI PLANT: 31 S~'ECmCATION ~.~VX~IV. NTS ~a~: 3~ psi ~ 28 Days sc~: 6.0" M~ · m: N/A ~ M~OO: AS~ C- 143 AS~ C- 172 ASTM C-39 SAMPLE LOCATION: K.S @ 9.3 CYLIHDER MARKED SET NO. 2 1 2 2 MEASURED SLUMP 6.00 6.00 6.00 6.00 6.00 2 3 2 4 2 5 DATE TESTED PROJECT DATA coNc~"r~ cLAss: 9506 PLACEMENT DATE: 12/04/1998 BATCH.TIME: 9i20am TIME SAMPLED: 10:00am BY: Mike'Odom WF. ATlmR CONDmONS: Partly cloudy TgMP~.RATUP.~ IF)- Am 73 V CONCRETE: 79 F T~VCKNO: 835 TICK~'TNO: 1194155 Am CONTENT (~): 1.5 ot~rr w~io~rr (~0: N/A PLACEMENT LOCATION: See page I REPORT OF TESTS ACC X , V YARDS: MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (lbs. force) (psi) 12/11/1998 12/11/1998 01/01/1999 01/01/1999 01/29/1999 7 97620 3450 7 99240 3510 Average 3480 28 139630 4940 28 135750 4800 Average 4870 56 143880 5090 360 0ILL This I~'port is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 2 of 3 C )NCRETE COMPRE IVE STRENGTH TESC Date of Service: 12/04/1998 Client No.: 08644025 Client: I The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 ENGINEERI~, INC 8~01 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report No.: 9832771 Report Date 02/01/1999 Project No.: 43-2333-98 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas · Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. COttXaA~a: BECK CONCRETE SUPPLIER: TXI PLA~rr: 31 SPECIFICATION REQUIREbiEN~ s'm~aTH: 3000 psi @ 28 Days SLOM~: 6.0" Max Am: N/A x~r METHOD: ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: 14.5 CYLIHDER MEASURED MARKED SLUMP SET NO. (lnehes) 3 I 3 2 5.75 5.75 5.75 5.75 5.75 3 3 3 4 3 5 PROJECT DATA CONCl~"r~ CLASS: 9506 PLACEMFaNT DATE: 12/04/1998 BATCH ]CiM~: 10:22am xaviE SAM~L,Va~: 1 l:30am aY: Mike bdom WEATIEER CONDITIONS: TEM~ERATUI~ (F). AIR 'im~UC~NO: 827 AIR CONTOrt (~): 1.4 PLACEMENT LOCATION: Seepage I Fair 76 F CONCh: 81 F TICKET NO: 1194226 ut~rr w~m~rr (p~0:. N/A REPORT OF TESTS ACCVSC, YARD : 360 MAXlblUM COMPRESSIVE DATE AGE LOAD STRENGTH TESTED (days) (lbs. force) (psi) 12/11/1998 7 92290 3260 12/11/1998 7 94430 3340 Average 3300 01/01/1999 28 134790 4770 01/01/1999 28 132800 4700 Average 4740 01/29/1999 56 139740 4940 Technician: Mike Odom Report Distribution: (I) Tbe B~k Group (1) Orou'mU. ky Dul~ee & Assoc. (i) Brockette Davis Drake, Inc. (I) The Beck Group Started: 6:30am (!) Th~ Beck Group (i) Dalc~a, lac. Finished: l:30pm Eugene Harbour Vice President 0ILL. 'l'nb report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 3 of 3 Date of Service: 12/30/1998 Report No.: Client No.: 08644025 Project No.: Client: The Beck Group Project: Atto: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 · 8901 Carpenter Frwy., Suite #100 Dallas, Texas ?$247 9835090 Report Date 02/01/1999 43-2333-98 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samPles. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8208 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 12/30/1998 BATCH TIME: 1:55pm PLANT: 41 TIME SAMPLED: 2:40pm BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Fair STREN~-~t: 5000 psi ~ 28 Days TEMPERATURE (V) - AIR 54 F CONCRETE: 68 F SLUMP: 6.0n Max TRUCKNO: 835 TICKETNO: 1205052 AIR: N/A AiR coNTFavr (%): N/A uNrr WEIGHT (pcO: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Five columns L~vel III-IV A-2, A, B, C, D (~ I Line ASTM C- 172 ASTM C-39 SAMPLE LOCATION: D-5 REPORT OF TESTS ACCUMULATIVE YARDS: CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AG E LOAD STRENGTH SET NO. (inch.) TESTED (days) (Ib~. fore~) (psi) 1 I 6.00 01/06/1999 7 128020 4530 I 2 6.00 01/06/1999 7 134050 4740 Average 4640 I 3 6.00 01/27/1999 28 205140 7250 I 4 6.00 01/27/1999 28 193640 6850 Average 7050 1 5 6.00 02/24/1999 56 12 FRACTURE TYPE Technician: Mike Odom Report Distribution: (i) The necX C.~p (1) Brock~te D~vis Drake, Inc. (1) The B~ck Group Started: 2:30am (I) The Beck Group (I) Dalcnn, Inc. Finished: 4:00pm Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page ! ofl CONCRETE COMPRE oSIVE STRENGTH TEST 8901 Carpenter Ftwy., Suite #100 Dallas, Texas '/~.47 Date of Service: 01/20/1999 Report No.: 9902678 Report Date 02/01/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: Arm: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strenlph samples. coNTRAc'rom BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENT~ STRENGTH: 5000 psi (~ 28 Days SLUMP: 5.0" Max AIR: N/A TEST MET~OO: ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CCASS: 8208 e~,CZM~rr OATE: 01/20/1999 BATCH TIME: l:51pm TIME SAMPLED: 3:00pm By: Ervin Farris WFATHER CONDmONS: TEMPERATURE (F} - AIR MUCK NO: 456 AIR CONTENT (%): N/A PLACEMENT LOCATION: Cloudy 72 F CONCRETE: 74 F TICKETrqO: 1220454 tn~rr WEIGHT (pc0.: N/A Columns Level #5 Area 4B #'s lO-K, L, M, N, I I-E & F, 12-E & F, 13-E, .F, G, H & 12-O SAMPLE LOCATION: CYLINDER MARKED SET NO. 10-K, L, M, N & 1 I-E MEASURED SLUMP (inches) I 1 3.00 I 2 3.00 I 3 3.00 I 4 3.00 I 5 3.00 I 6 3.00 Technician: Ervin Farris Report Distribution: (I) The Beck Group (I) Oromalzky Dupree & Assoc. (I) Brockette Davis Drake, Inc. (I) The Beck Group REPORT OF TESTS DATE TESTED 01/23/1999 01/23/1999 ACCUMULATIVE YARDS: 10 MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) Oh. force) (psi) 01/27/1999 01/27/1999 02/17/1999 02/17/1999 Started: 3:00pm (I) The Beck Group (I) Dalcan, Inc. 3 3 7 28 28 Finished: 5:00pm 141020 4990 132230 4680 Average 4840 147240 5210 151320 5350 Average 5280 ~ Enginee,~ Eugene eraroour Vice President 0ILL This report is exclusively for the use oftbe client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 1 of I CONCRETE COMPRESSIVE STRENGTH TES? 8~01 Cm'penteF lq'wy., Suite #100 Dallas, Texas 75247 Date of Service: 01/2111999 Report No.: 9902785 Report Date 02/01/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: Atto: Gillett Berger 1700 Pacific Ave.. Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. conxaacxoa: BECK CONCRRTE SUPPLIgR: TXI PLA~: 41 s~cnncaTioN STmmGxm 4000 psi @ 28 Days SLtnm,: 6.0" Max Am: N/A T~r M~'mOD: ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRgTE CLASS: 9508 PLACEM DATE: 01/2111999 BATCH.TIME: l:33pm TIME SAMPLED: 2:15pm BY: Mike'Whyman WEATRER CoNDmoNs: Mostly clear TFAV~ERATURE 0r)- AIR 76 g CONCh: 79 F ~uc~no: 530 ~c~o: 12217~ Am co~ (~): N/A ~ ~m~ (~:. NIA P~C~ ~A~ON: .. Footing for retaining wall at patiO SAMPLE LOCATION: CYLINDKR MARKgD SET NO. See placement location MEASURED SLUMP (inches) 1 I 4.00 1 2 4.00 1 3 4.00 I 4 4.00 DATE TESTED 01/28/1999 01/2811999 REPORT OF TESTS ACCUMIJLATIVEYARDS: MAXIMUM COMPRE~IVE AGE .:'" LOAD STRENGTH (days) 0bs. force) (psi) 7 129430 4580 7 119580 4230 Average 4410 02/18/1999 02/1811999 28 28 Technician: Mike Whyman Report Distribution: (I) The Beck Group (I) Gromatzky Dupree & Assoc. (I) Brocket~ Davis Drakc, Inc. (I) ~ne Beck Group Started: l:00pm (I) The Beck Group (1) Dalcan, lac. Finished: 2:30pm H~ Eng~~a~ Eugene t~bour Vice President 01LL This report is exclusively for the use of~he client indicated above and shall not bc reproduced except in full without the written approval of HBC Engineering, Inc. Page I of I CONCRETE COMPRESSIVE STRENGTH TES'i" Date of Service: 01/22/1999 Client No.: 08644025 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Report No.: Project No.: Project: 9902917 43-2333-98 8901 Carpenter Frwy. Suite #100 Dallas, Texas 75247 Report Date 02/0111999 GTE Shared Services CoPpell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. cowrRAcrom BECK coNc~'ngsurPLmg: TXI Pt~r,rr: 41 SPECIFICATION REQUI~ sTi~_~o'rm 4000 psi @ 28 Days SLUMP: 3-5" AIR: N/A TEst ME'mOO: ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 1 1 5.25 1 2 5.25 1 3 5.25 1 4 5.25 1 5 5.25 Sample location: South end Technidan: Mario Villanueva Report Distribution: (i) The Beck Group (1) Gromatzky Dupree & Assoc. (I) Brockette Davis D~ke, Inc. (1) The Beck Group PROJECT DATA · CONC~mrz CLASS: 9508 PLACEMFaN'T DATE: 01/22/1999 BATCH TIME: 2:16pm ~,mS,O~LED: 2:55pm nY: Mari6 Villanueva WEA~R CoNorrloNs: Cloudy TEMPERATURE~9-AIR 51 F CONCRETE: 68 F TRUCK NO: 641 TICKET NO: 1223197 AIR CONTENT (~): N/A UN~ WEIGHT (podi N/A PLACEMENT LOCATION: Loading dock r~aining wall & footing REPORT OF TESTS · ACCUMULATIVE YARDS: 10 MAXIblUM COMPRESSIVE DATE AGE LOAD STRENGTH FRACTURE ~D (days) (lbs. force) (psi) TYPE 01/29/1999 7 131170 4640 01/29/1999 7 142180 5030 Average 4840 02/19/1999 28 02/1911999 28 03/19/1999 56 of retaining wall, 15' ease of footing~ E~~~~~g~Inc. Staffed: 2:30pm Finished: 4:30pm (I) The Beck Group (i) Dalcan, Inc. Eugene Harbour Vice President 0ILL This report is exclusively for the use of ~hc client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc. Page 1 of I