Loading...
Verizon-LR 990309 F-NG EN~, ~N'C. 8901 Carpenter Frwy,, Suite #100 Dallas, Texas 75247 Date of Service: 02/26/1999 Report No.: 9906172 Report Date 03/09/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA C ONTI~-~sCTOR: BECK CONCRETE CLASS: 8208 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 02/26/1999 BATCIt TIblE: 2:59am PLANT: 41 TD, IESAMPLED: 3:25am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATIIER CONDITIONS: Partly cloudy STRENGTII: 5000 psi @ 28 Days TEMPERATURE (F)-AIR 66 F CONCRETE: 74 F SLL~fP: 6.0" Max TRUCK NO: 458 TICKET NO: 1251129 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf):. N/A TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: Building slab, Level I1[ Area C, E-H. 13-18 ASTM C- 172 Note: Ten (10) gallons of water added. ASTM C-39 SAMPLE LOCATION: E.5 @ 13.5 REPORT OF TESTS ACCL,%,IULATIVE YARDS: 550 CYLINDER MEASURED :XL',XIMU.%I COMPRESSIVE 5LARKED SLUMP DATE AGE LOAD STRENGTtl FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 I 6.00 03/01/1999 3 109950 3890 I 2 6.00 03/05/1999 7 144360 5110 I 3 6.00 03/05/1999 7 141350 5000 Average 5060 1 4 6.00 03/26/1999 28 I 5 6.00 03/26/1999 28 I 6 6.00 04/23/1999 56 This report is exclusively fl>r the use of the cliem indicated al~}vc and shall not bc rcpmduccd except in full without the u, riuen approval of H BC Engineering, Inc. 011.I. Page I of q ~'VG{24F_~, INC 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 02/26/1999 Report No.: 9906172 Report Date 03/09/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTgnCTOm BECK CONCRETE CLASS: 8208 CONCRETE SUPPLIER: TXI PL.4CEMENT DATE: 02/26/1999 BATC~ TI.~E: 4:10am PLANT: 41 TIME SA*IPLED: 4:35am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATtIER CO:,'Drr~ONS: Parity cloudy STRENGTII: 5000 psi @ 28 Days TEMPERATURE a:)- AIR 66 F CONCRETE: 74 F SLLe, IP: 6.0" Max T~UCK NO: 805 TICKET NO: 1251173 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGIIT (pc.f): N/A TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C- 172 Note: Ten (10) gallons of water added. ASTM C-39 SAMPLE LOCATION: Along E @ 15 REPORT OF TESTS ACCL.%.IULATIVE YARDS: 550 CYLINDER MEASL'RED NLXXLMUM COMPRESSIVE · IL& RKED SLL.rMP DATE AGE LOAD STRENGTH FIL-X CTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 I 5.75 03/01/1999 3 110540 3910 2 2 5.75 03/05/1999 7 153390 5420 2 3 5.75 03/05/1999 7 153880 5440 Average 5430 2 4 5.75 03/26/1999 28 2 5 5.75 03/26/1999 28 2 6 5.75 04/23/1999 56 This report is exclusively for the use of the client indicated atx)ve and shall not be reproduced except in full without thc ,.vrittcn approval of HBC Engineering. Inc 011.L Page 2 of ~ ENGD]E~, ]~NC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 02/26/1999 Report No.: 9906172 Report Date 03/09/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillctt Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8208 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 02/26/1999 mxTcn TIME: 5:35am PLANT: 41 TIME SAMPLED: 6:00am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATIIER CONDITIONS: Cloudy STRENGTII: 5000 psi @ 28 Days TEMPERATURE {F)- AIR 66 F CONCRETE: 73 SLtn~te: 6.0" Max TmJCK.X'O: 455 TICKETNO: 1251253 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGIIT (pcf):. N/A TEST METIIOD: ASTM C-143 PLACEMEN-F LOCATION: See page I ASTM C- 172 Note: Fifteen (15) gallons of water added. ASTM C-39 SAMPLE LOCATION: F @ 15.5 REPORT OF TESTS ACCIo.'MULATIVE YARDS: 550 CVL,r,' ER , .tEASCRED CO tPRESSIVE MARKED SLU31P DATE AGE LOAD STRENGTII FI~-kCTURE SET NO. (inches) TESTED {days) {lbs. force) (psi) TYPE 3 1 5.50 03/01/1999 3 113450 4010 3 2 5.50 03/05/1999 7 154950 5480 3 3 5.50 03/05/1999 7 163920 5800 Average 5640 3 4 5.50 03/26/1999 28 3 5 5.50 03/26/1999 28 3 6 5.50 04/23/1999 56 This report is exclusively for the usc of the client indicated alx~ve and shall not be reproduced except in full u,.thout the wriucn approval of HBC Engineering. Inc. Oil. I. Page 3 o1' '; ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 02/26/1999 Report No.: 9906172 Report Date 03/09/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8208 CONCRETE SUPPLIER: TXI PLAC£MENTOAX~: 02/26/1999 BATCIITmE: 7:02am PLAN~r: 41 TIME SAMPLED: 7:25am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATIIER CONDrrIoNS: Cloudy STKENGTII: 5000 psi @ 28 Days TE3,1PEI~-~,TURE (F)-AIR 66 F CONCRETE: 74 F SLIo,'MP: 6.0" Max TRUCK NO: 455 TICKET NO: 1251424 AIR: N/A AIR CONTEN'r (%): N/A UNIT WEIGItT (pcf): N/A TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: See page I ASTM C- 172 Note: Five {5) gallons of water added. ASTM C-39 SAMPLE LOCATION: G @ 17 REPORT OF TESTS ACCUMULATIVE YARDS: 550 CYLINDER MEASURED MAXIMU.Xl COMPRESSIVE 5L~, RKED SLUMP DATE AGE LOAD STRENGTII FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 4 I 6.00 03/01/1999 3 106670 3770 4 2 6.00 03/05/1999 7 149520 5290 4 3 6.00 03/05/1999 7 141310 5000 Average 5150 4 4 6.00 03/26/1999 28 4 5 6.00 03/26/1999 28 4 6 6.00 04/23/1999 56 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. 01I.i. Page 4 of '~ ENGhNEERIIq3, g~'C. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 02/26/1999 Report No.: 9906172 Report Date 03/09/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8208 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 02/26/1999 BATCII TIME: 8:30am PLANT: 41 TIME SAMPLED: 9:00am BY: Mike Odom SPECIFICATION REQUIRE,MENTS WEATIIER CONDITIONS: Cloudy STRENGTII: 5000 psi @ 28 Days TEMPERATURE (F)- AIR 69 F CONCRETE: 73 F SLL~IP: 6.0" Max TRUCK NO: 472 TICKET NO: 1251631 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGIIT (pcf}:. N/A TEST METtIOD: ASTM C- 143 ?LAC£MENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: G.5 @ 17.5 REPORT OF TESTS ACCL3IULATIVE YARDS: 560 CYLINDER MEASURED MAXLMU.'M COMPRESSIVE bLARKED SLUMP DATE AGE LOAD STRENGTII FIL&CTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 5 1 5.00 03/01/1999 3 104460 3690 5 2 5.00 03/05/1999 7 145960 5160 5 3 5.00 03/05/1999 7 140850 4980 Average 5070 5 4 5.00 03/26/1999 28 6 5 5.00 03/26/1999 28 6 6 5.00 04/23/1999 56 Technician: Nlike Odom Started: 2:00am Finished: 10:00am ~ En~,~ri~.., inc. Report l)istrihution: ( 1 ) Tile Beck Group (I) The Beck Group ( 1 ) Gromatzky Dupree & Assoc. ~. 1 ) Dale:re. Inc. Eugene narbour { [ ! Brtx:kette Davis Drake. [nc. Vice President { I ) The Beck Group This report is exclusively for the use of the client indicated abo~e and shall not be reproduced except in full v4thout thc wnttcn approval of HBC Engineering. Inc. 0ILl. Page 5 of $ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 01/08/1999 Report No.: 9901546 Report Date 03/09/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 154 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 01/08/1999 BATCIITD, IE: 12:36pm PLANT: 41 TLME SAMPLED: 1:10pm BY: Mike Odom SPECIFICATION REQUIREMENTS WEATIIER CONDITIONS: Cloud)' STRENGTII: 5000 psi @ 28 Days TEMPERATURE (F)- AIR 4 1 F CONCRETE: 38 F SLL.3IP: 6.0" Max TRC'CK NO: 383 TICKET NO: 1210825 AIR: N/A AIR COh~rE~r {%): N/A UNIT WEIGIIT (pcf): N/A TEST METIIOD: ASTM C- 143 PLACE.MEN~f LOCATION: Building Columns (19) Level II1P.N, M,& K,J @ 9.I,N.M.L,K ~ 10. E& F@ Il, E. ASTM C-172 F.G @ 12. H.G, F, E @ 13 ASTM C-39 SAMPLE LOCATION: E @ 13 REPORT OF TESTS ,XCCC. ,C'L:XTIVE YA S: 40 CYLe, ER . ,EASU D xxI. rot CO ,P SSlVE 3,L&RKED SLU~IP DATE AGE LOAD STRENGTII FIL-X CTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 6.00 01/15/1999 7 173300 6130 1 2 6.00 01/15/1999 7 163 ! I0 5770 Average 5950 1 3 6.00 02/05/1999 28 220960 7810 I 4 6.00 02/05/1999 28 229260 8110 Average 7960 I 5 6.00 03/05/1999 56 237100 8390 Ten (10) ~aiions of wa~er added. Technician: Mike Odom Started: l:00pm Finished: 4:00pm I'-l~ ~,~,~ ~.~~i~ irlc' Report Distribution: (1) The Beck Group (l) The Beck Group ( 1 ) Gromatzky Dupree & Assoc. ( 1 ) Dalcan, Inc. · (l) Brockette Davis Drake, Inc. Vice President ( I } The Beck Group This repot! is exclusively for tile use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page I of 1 FaNG ~'F..ERLNG, ~NC. 8901 Carpenter Frwy., Suite #I00 Dallas, Texas 75247 Date of Service: 01/08/1999 Report No.: 9901545 Report Date 03/09/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8205 CONCRETE SUPPLIER: TXI I'LACEMENTDATE: 01/08/1999 BATCtI Tr~XE: 2:57am PLANT: 41 TIME SAMPLED: 3:30am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATIIER CONDITIONS: Foggy STRENGTII: 4000 psi @ 28 Days TE.MPERATL'RE(F)- AIR 46 g CONCRETE: 61 F' SLU3,1P: 6.0" Max TRUCK NO: 474 TICKET NO: 1209931 AIR: 3-6% AIR CONTENT (%): 4.8 UNIT WEIGItT (pcf): N/A TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: North paving limits to bay 4,5& 6 ASTM C-172 N limits bay 7 to 50' south of third island ASTM C-39 SAMPLE LOCATION: See Below REPORT OF TESTS ACCt.'*rCL:XTIVE YARDS: 450 CYLINDER blEASURED .%t.% XLM L'M COMPRESSIVE MARKED SLTo~IP DATE AGE LOAD STRENGTII FIL&CTURE SET NO. {,inches) TESTED (days) (lbs. force) (psi) TYPE I I 6.00 01/15/1999 7 114020 4030 1 2 6.00 01/15/1999 7 123530 4370 Average 4200 I 3 6.00 02/05/1999 28 153280 5420 I 4 6.00 02/05/1999 28 133150 4710 Average 5070 I 5 6.00 03/05/1999 56 159050 5620 Sample location: Bay 5, inside 31D island builnose west from east ILmits. Ten gallons of water added. This report is exclusi,,cly for the usc of the client indicated above and sh;,ll not be reproduced except ,n full v,-ithout the written apprc, val of }IBC E,xgin¢cring. Inc. Page I of 5 ENGINF_.ERPqG, hNC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 01/08/1999 Report No.: 9901545 Report Date 03/09/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8205 CONCRETE SUPPLIER: TXI PLACEMENTD,XTE: 01/08/1999 BATCIITmE: 4:08am PLAN"r: 41 TIME SAMPLED: 4:35am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATILERCONDITIONS: Foggy STRENGTII: 4000 psi @ 28 Days TE,'%IPERATURE (F)-Am 46 V CONCRETE: 58 F SLtr~re: 6.0" Max TRUCKNO: 389 TICKETNO: 1209979 AIR: 3-6% Am CONTEN-r (%): 4.7 UNIT WEIGIIT (pct'):. N/A TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: See page I ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 450 CYLINDER MEASURED ~L-XXIMUM COMPRESSIVE MARKED SLL~IP DATE AGE LOAD STRENGTII FRACTURE SET NO. (inches) TESTED {days) (lbs. force) (psi) TYPE 2 1 6.25 01 / 15/1999 7 102250 3620 2 2 6.25 01 / 15/1999 7 96040 3400 Average 3510 2 3 6.25 02/05/1999 28 128430 4540 2 4 6.25 02/05/1999 28 143400 5070 Average 4810 2 5 6.25 03/05/1999 56 152040 5380 Sample loca~ion: Bay 7, 20' sou~h from cen~erline nor~keast driveway. S!u~,p ~aken a~ hopper. This report is cxclus~¥ely for thc use of thc chcnt indicated al*)vc and shall not be reproduced except m full v, ithout the written approval of HBC Engineering. Inc. 011.l. Page 2 F~NG~, 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 01/08/1999 Report No.: 9901545 Report Date 03/09/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 01/08/1999 BATCII TIME: 5:0Sam PLANT: 41 TIME SAMPLED: 5:45am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATIIER CONDITIONS: Foggy STRENGTII: 4000 psi @ 28 Days TEMPEIL, XTURE {F)-AIR 46 F CONCRETE: 63 F SLUMP: 6.0" Max TRUCK NO: 802 TICKET NO: 12110033 AIR: 3-6% AIR CONTENrr (%): 5.0 UNIT WEIGIIT (pcf); N/A TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCL'~IULATIVE YARDS: 450 CYLINDER MEASURED I~L-~XIMUM COMPRESSIVE ~L-~. RKEI) SLU,%IP DATE AGE LOAD STRENGTII FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 I 6.00 01 / 15/1999 7 107030 3780 3 2 6.00 01/15/1999 7 100920 3570 Average 3680 3 3 6.00 02/05/1999 28 162200 5740 3 4 6.00 02/05/1999 28 159860 5650 Average 5700 3 5 6.00 03/05/1999 56 169000 5980 Sample location: Bay 6 centerline area, 20' sou"~h from northern isla.~.ds. Ten ga!!o.-.s of water added. This report is exclusively for the use of the client indicated a[x)ve and shall not be reproduced except in full v, ithout thc v, ntten approval of H BC Engineering. Inc. I111.L ]Sage 3 of 5 ENG kN~_~ING, RqC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 01/08/1999 Report No.: 9901545 Report Date 03/09/1999 Client No.: 08644025 Project No,: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CO,',-r~cxog: BECK CONCRETE CLASS: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 01/08/1999 BATCI{TLXIE: 6:12am PLAk'r: 41 TD, IESA.MPLED: 7:10am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATILER CONDITIONS: Light fog STRENGTn: 4000 psi @ 28 Days TEMPEi~.%TURE (F)- AIR 45 F CONCRETE: 63 F SLU31P: 6.0" Max TRUCKNO: 474 TICKETNO: 1210II2 AIR: 3-6% AIR CONTENT (%): 5.2 UNIT WEIGHT (pcf).'. N/A TEST METIIOD: ASTM C-143 PLACEMEN'F LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Bay 4 centerpoint area REPORT OF TESTS ACCUMULATIVE Y.~,R~S: 450 · ~ t,~ CYLLNDER MEASURED MAXC lU, I COMPRESSIVE ~L.%RKED SLIo.'MP DATE AGE LOAD STRENGTII FR..%CTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 4 1 6.00 01/15/1999 7 114320 4040 4 2 6.00 01/15/I999 7 122400 4330 Average 4190 4 3 6.00 02/05/1999 28 155570 5500 4 4 6.00 02/05/1999 28 152090 5380 Average 5440 4 5 6.00 03/05/1999 56 167030 5910 Ten ~a!ions of water added. This report is exclusively for the use of tile client indicated alT)ye and shall not bc reproduced except in full w&thout the written approval of I IBC Engineering. Inc. Ill I.L Page 4 of 5 ENGLNT. F. RING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 01/08/1999 Report No.: 9901545 Report Date 03/09/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 01/08/1999 BATCIITIME: 8:01am PLANT: 41 TIME SAMPLED: 8:30am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATIIER CON'I)ITIONS: Cloudy STRENGTII: 4000 psi @ 28 Days TEMPERATURE (F)- AIR 43 F CO~'CREXE: 60 V SLU~tP: 6.0" Max TRUCK NO: 802 TICKET NO: 1210298 AIR: 3-6% :aiR CONTEN-r (%): 5.0 UNIT WEIGHT (pcO: N/A TEST METIIOD: ASTM C- 143 PLACEMEN-r LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMUI.ATIVE YARDS: 500 CYLINDER MEASURED I~,LaXISIL~I COMPRESSIVE MARKED SLL~IP DATE AGE LOAD STRENGTn FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 5 I 6.25 01 / 15/1999 7 130550 4620 5 2 6.25 01/15/1999 7 131110 4640 Average 4630 5 3 6.25 02/05/1999 28 173500 6140 5 4 6.25 02/05/1999 28 !94780 6890 Average 6520 5 5 6.25 03/05/1999 56 200140 7080 Sample location: Bay 7 centerpoin~ area 20' soutln of clnird southern island bullnose. Ten Gallons of water added. Technician: Mike Odom Started: 2:00am lqnished: 9:30am Report Distrihution: ( 1 ) The Beck Group ( I ) Thc Beck Group ( I } Gromatzky Dupree & Ass~x:. ( I ~ Dalcan. Inc. Eugene H',ffbour ~ I ) Brockette I)a~is Drake. [nc. Vice President ~' 1) The Beck Group This report is exclus,vely for ~he use of the client indicated a~x)ve and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. 011.L Page ~ o1'5